Trimble SDK - Trimble Dimensions 2014

Trimble SDK - Integration into
existing navigation systems
Shown on an example for Tunnel boring
machines (TBM’s) and Tunnel excavators
Agenda
 VMT-GmbH – Who we are
 Trimble Integration in existing VMT products
 Excavator Navigation System with Trimble
Equipment
 Summary
VMT company





Mechanized Tunnelling | Industrial Measurement
Associated company of Herrenknecht AG
Head office in Bruchsal | Germany
Subsidiaries in CN, AU, RU, US
200 employees worldwide
Company products
Core business
Tunnelling with Segmental Lining
 How does it work?
Microtunnelling
 How does it work?
Reference Projects
Reference: Doha Metro / Quatar
 85km of new Metro
Network till 2022
 ~15 Millionen Dollar
contract volume
Reference: China
 ~ 500 Navigation
Systems running
Reference: Gotthard Base
Tunnel / Switzerland
 Longest rail tunnel
worldwide with 57km
Reference: Airport Link
Brisbane / Australia
Reference Projects in the US
 Hartford, CN – 1st Curved Microtunnel in the US
Reference Projects in the US
 Queen Bored Tunnels, New York
Reference Projects in the US
 Lake Mead Intake No. 3, Las Vegas, NV
Idea
Additional
Total Station
Flexibility
Application
underground
Basics
TUnIS software
platform
Microsoft C#
Visual Studio
Microsoft Team
Foundation Server
Cooperation
TUnIS Definition of
demands together
with Trimble
Device supply for
the first tests
First class support
by Trimble
Goal
Trimble SDK
Visual Studio 2013
C#
Existing TUnIS
Trimble total
stations
Keep VMT default
hardware
Extended version
of TUnIS
Goal
Extended TUnIS for
more customer
benefit
More options for
different demands
> active prism
Additional
Total Station
Total Stations
S8
ALTU
Laser target
SPS 930
MT 900
Trimble SDK
 SDK with API (Application Programming
Interface) is modern and well designed
 Structured in different logical sections
>> Servo
>> Measurement
>> Tilt
>> Targets
>> Search
Trimble SDK
 Rapid development readiness
 From 0 to 100 in 10 min.
>> SDK install
>> create new project in MS Visual Studio
>> include needed DLLs
>> connect USB cable
>> load example code
>> Ready and Run!!!
Trimble SDK and TUnIS
 Software layer for similar handling for each
kind of Total Station
 Easy integration of new additional Total
Stations
Outcome
 Integration of Trimble SDK from VMT in sum
500 h
 Positive feedback from developers
>> well documentation
>> Windows Helpfile with hyperlinks
>> modern classes and interfaces
>> "Getting started"-introduction
Outcome
 Licensing is optimized for available internet
connection (deficit for VMT)
 Way for offline licensing
>> Keycode for each
setup is send to Trimble
>> Trimble re-sends
unlock code for import
License
?
Outcome
 Configurable serial interface would offer more
options
 USB-connection
Use S8 on TBM jobsite
 Reality
 Simplified model
TBM
 Examples
Test jobsite Berlin U5
Test jobsite Berlin U5
Results
 Systems runs stable for 3 days
Outlook for TBM application
 Next step:
 Long term test on tunneling project
 (Karlsruhe/Germany on Metro project)
 Finalize/improve the development
 Aim for near future:
 Customer can choose instrument
Use SPS930 for Tunnel excavator
 Liebherr R 944 C
>> different to other excavators?
 Factory
 Site
Tunnel excavator
 Used for flexible profiling
 For rock hardness with up to 100 MPa
 Special demands
>> roll joint
>> very hard conditions
>> different tools
Tunnel excavator
 Machine weight 44 tons
 Max. reach up to 11 m
 Comparison with robotic arm
… special algorithms for
improving accuracy
 Prototype tests at factory
soon planned
Tunnel excavator
 Demands for navigation system
>> mechanical protection
>> kinematic, fast movements
Tunnel excavator
Excavator infrastructure
 Trimble Radio modem
 Total station SPS 930
 MT 900 prism (1 or 2 pcs)
 Inclinometers
(1- and 2-axes)
 VMT Industrial PC
Excavator infrastructure
Special
joint
Excavator Navigation System
Result for Tunnel excavator
 Prototype tests … still open
 Expected accuracy ± 2inch
 Robotic arm algorithms
working?
Outlook for Tunnel excavator
 Prototype test at factory
 Test on real jobsite
Rough conditions
 What does it mean?
Rough conditions - Smart solutions
Thank you for your attention!
 Axel Knoll (Product Manager)
 Mathias Knoll (Regional Sales Manager)
VMT GmbH, Germany
www.vmt-gmbh.de