Unpack your device - Download Center

Microsoft Azure StorSimple Appliance 8600
Hardware Installation Guide
Contents
Unpack your device ..................................................................................................................................................... 3
Prerequisites ................................................................................................................................................................... 3
Unpacking your device ............................................................................................................................................... 3
Rack-mount your device ................................................................................................................................................ 4
Site preparation............................................................................................................................................................. 4
Prerequisites ................................................................................................................................................................... 5
Rack-mounting rail kit................................................................................................................................................. 5
Install the EBOD enclosure on the rails ................................................................................................................. 5
Mounting the EBOD enclosure in the rack .......................................................................................................... 7
Mounting the primary enclosure in the rack ...................................................................................................... 8
Cable your device ............................................................................................................................................................. 9
Prerequisites ................................................................................................................................................................... 9
SAS cabling ..................................................................................................................................................................... 9
Power cabling ............................................................................................................................................................... 11
Network cabling...........................................................................................................................................................13
Serial port cabling .......................................................................................................................................................15
Unpack your device
This section provides clear, detailed instructions on how to unpack your Microsoft Azure
StorSimple 8600 storage device. This device is shipped in two separate boxes, one for the primary
enclosure and other for the EBOD enclosure.
Prerequisites
To unpack your device, follow these guidelines.
WARNING!
‡ %HIRUH\RXEHJLQHQVXUHWKDW\RXKDYHWZRSHRSOHDYDLODEOHWRKDQGOHWKHZHLJKWLQFDVH\RX
DUHKDQGOLQJLWPDQXDOO\$IXOO\FRQÀJXUHGHQFORVXUHFDQZHLJKXSWRNJOEV
‡ 6HWWKHWZRER[HVRQDÁDWOHYHOVXUIDFH
Unpacking your device
Perform the following steps to unpack your device.
1.
Inspect the boxes and the packaging foam for crushes, cuts, water damage, or any other
obvious damage. If the box or packaging is severely damaged, do not open the box. Please
contact technical support to help you assess whether the device is in good working order.
2SHQWKHWZRER[HVDQGXQSDFNWKHSULPDU\DQG(%2'HQFORVXUHV7KHIROORZLQJÀJXUHVKRZV
the unpacked view of your storage device.
6
5
4
3
AC
CE
SS
OR
IES
AN
D
CA
BL
ES
2
1
Figure 1 Unpacked view of your storage device
3
Label
1
3
4
5
6
Description
Packing box
6$6&DEOHVLQDFFHVVRULHVDQGFDEOHVWUD\
Bottom foam
Device
Top foam
Accessory box
3. After unpacking the two boxes, ensure you have:
D SULPDU\HQFORVXUHWKHSULPDU\HQFORVXUHDQG(%2'HQFORVXUHDUHLQWZRVHSDUDWHER[HV
b. 1 EBOD enclosure.
F SRZHUFRUGVLQHDFKER[
G 6$6FDEOHVWRFRQQHFWWKHSULPDU\HQFORVXUHWR(%2'HQFORVXUH
e. 1 crossover Ethernet cable.
I VHULDOFRQVROHFDEOHV
g. 1 serial-USB converter for serial access.
K VLQJOH46)3WR6)3DGDSWHUV
L UDFNPRXQWNLWVVLGHUDLOVZLWKPRXQWLQJKDUGZDUHHDFKIRUWKHSULPDU\HQFORVXUH
DQG(%2'HQFORVXUHLQHDFKER[
j.
1 tamper-proof T10 screw driver
k. Getting started documentation.
If you did not receive any of the items listed above, contact technical support. The next step is to
rack-mount your device. See the Rack-mount your device for details.
Rack-mount your device
This section includes the steps required to install your Microsoft Azure StorSimple 8600 storage
device in a standard 19-inch rack with front and rear posts. This device comes with two enclosures:
a primary enclosure and an EBOD enclosure. Both of these need to be rack mounted.
The installation consists of multiple steps each of which is discussed in the following procedures.
Site preparation
The enclosures must be installed in a standard 19-inch rack that has both front and rear posts. To
prepare for rack installation, ensure that:
‡ 7KHSULPDU\DQG(%2'HQFORVXUHVDUHUHVWLQJVDIHO\RQDÁDWVWDEOHDQGOHYHOZRUNVXUIDFH
RUVLPLODU
‡ 7KHVLWHZKHUH\RXLQWHQGWRVHWXSKDVVWDQGDUG$&SRZHUIURPDQLQGHSHQGHQWVRXUFHRUD
UDFN3RZHU'LVWULEXWLRQ8QLW3'8ZLWKDQXQLQWHUUXSWLEOHSRZHUVXSSO\836
‡ 2QH8;8VORWLVDYDLODEOHLQWKHUDFNZKHUH\RXLQWHQGWRPRXQWWKHHQFORVXUHV
4
WARNING!
Ensure you have two people available to handle the weight in case you are handling it manually.
$IXOO\FRQÀJXUHGHQFORVXUHFDQZHLJKXSWRNJ
Prerequisites
The enclosures are designed for installation into a standard 19-inch rack cabinet with:
‡ 0LQLPXPGHSWKRILQFKHVIURPUDFNSRVWWRSRVW
‡ 0D[LPXPZHLJKWRINJIRUWKHGHYLFH
‡ 0D[LPXPEDFNSUHVVXUHRI3DVFDOPPZDWHUJDXJH
Rack-mounting rail kit
A set of mounting rails will be provided to use with the 19-inch rack cabinet. The rails have been tested
to handle the maximum enclosure weight. These rails will also allow installation of multiple enclosures
ZLWKRXWORVVRIVSDFHZLWKLQWKHUDFN6WDUWZLWKWKHLQVWDOODWLRQRIWKH(%2'HQFORVXUHÀUVW
Install the EBOD enclosure on the rails
)ROORZWKHVHVWHSVWRVDIHO\LQVWDOOWKH(%2'HQFORVXUHRQWKHUDLOV
:LWKWKHHQFORVXUHRQWKHZRUNVXUIDFHUHPRYHWKHOHIWDQGULJKWIURQWÁDQJHFDSVE\SXOOLQJ
WKHFDSVIUHH7KHÁDQJHFDSVVLPSO\VQDSRQWRWKHÁDQJHV
7KHVHUDLOVDUHLQVWDOOHGDWWKHIDFWRU\,IWKHVHDUHQRWWKHQLQVWDOOWKHOHIWUDLODQGULJKWUDLO
slides to the sides of the enclosure chassis. They attach using six metric screws on each side. To
KHOSZLWKRULHQWDWLRQWKHUDLOVOLGHVDUHPDUNHG´/+)URQWµDQG´5+²)URQWµDQGWKHHQGWKDW
LVDIÀ[HGWRZDUGVWKHUHDURIWKHHQFORVXUHKDVDWDSHUHGHQG
1
2
Figure 2 Attaching rail slides to the sides of the enclosure
5
Label
1
Description
0;EXWWRQKHDGVFUHZV
Chassis slides
3. Attach the left-rail and right-rail assemblies to the rack cabinet vertical members. The brackets
DUHPDUNHG´/+µ´5+µDQG´7KLVVLGHXSµWRJXLGHWKHXVHUWKURXJKFRUUHFWRULHQWDWLRQ
D /RFDWHWKHUDLOSLQVDWWKHIURQWDQGUHDURIWKHUDLODVVHPEO\([WHQGWKHUDLOWRÀWEHWZHHQ
the rack posts and insert the pins into the front and rear-rack post vertical member holes.
Be sure the rail assembly is level.
b. Secure the rail assembly to the rack vertical members using two of the metric screws
provided. Use one screw on the front and one on the rear.
c. Repeat these steps for the other rail assembly.
4
2
5
1
3
Figure 3 Attaching rail assemblies to the rack
Label
1
3
4
5
6
Description
Clamping screw
Square hole front rack post
Left front-rail location pins
Clamping screw
Right front-rail location pins
Mounting the EBOD enclosure in the rack
Perform the following steps to mount the EBOD enclosure in the rack using the rack rails that were
just installed.
1.
Using an assistant, lift the enclosure and align it with the rack rails.
&DUHIXOO\LQVHUWWKHHQFORVXUHLQWRWKHUDLOVDQGSXVKLWFRPSOHWHO\LQWRWKHUDFNFDELQHW
Figure 4 Mounting the enclosure in the rack
3. Secure the enclosure into the rack by installing one provided Phillips-head screw through each
ÁDQJHOHIWDQGULJKW
,QVWDOOWKHÁDQJHFDSVE\SUHVVLQJWKHPLQWRSRVLWLRQDQGVQDSSLQJWKHPLQWRSODFH
7
1
)LJXUH,QVWDOOLQJWKHÁDQJHFDSV
Label
1
Description
Enclosure fastening screw
Mounting the primary enclosure in the rack
$IWHU\RXKDYHÀQLVKHGPRXQWLQJWKH(%2'HQFORVXUH\RXZLOOQHHGWRPRXQWWKHSULPDU\
enclosure following the same steps.
NOTICE
It is possible to have a few empty slots in the rack between the primary enclosure and the EBOD
HQFORVXUH8VHWKHSURYLGHGP6$6FDEOHWRFRQQHFWWKHSULPDU\HQFORVXUHWRWKH(%2'HQFORVXUH
NOTICE
There are no constraints in terms of the relative placement of the head unit with respect to the
EBOD. As such, the primary enclosure can be placed in the top slot and the EBOD enclosure
below—or vice versa.
The next step is to cable your device for power, network, and serial access. See Cable your device
for detailed steps.
8
Cable your device
This section includes instructions to cable your device for power, network, and serial connection.
Prerequisites
Before you begin the cabling of your device, you will need:
‡ <RXUSULPDU\HQFORVXUHDQGWKH(%2'HQFORVXUHFRPSOHWHO\XQSDFNHG
‡ SRZHUFDEOHVHDFKIRUWKHSULPDU\DQGWKH(%2'HQFORVXUHWKDWFDPHZLWK\RXUGHYLFH
‡ 6$6FDEOHVVXSSOLHGZLWKWKHGHYLFHWRFRQQHFWWKH(%2'HQFORVXUHWRWKHSULPDU\HQFORVXUH
‡ $FFHVVWR3RZHU'LVWULEXWLRQ8QLWV3'8VUHFRPPHQGHG
‡ 1HWZRUNFDEOHV
‡ 3URYLGHGVHULDOFDEOHV
‡ 6HULDO86%FRQYHUWHUZLWKWKHDSSURSULDWHGULYHULQVWDOOHGRQ\RXU3&LIQHHGHG
‡ 3URYLGHGVLQJOH46)3WR6)3DGDSWHUV
‡ 6)3FDEOHV
SAS cabling
<RXUGHYLFHKDVDSULPDU\DQGDQ(%2'HQFORVXUH7KHVHHQFORVXUHVQHHGWREHFRQQHFWHG
together using the SAS cables.
Perform the following steps to connect the primary enclosure to the EBOD enclosure.
,GHQWLI\WKHSULPDU\DQGWKH(%2'HQFORVXUH7KHWZRHQFORVXUHVFDQEHLGHQWLÀHGE\ORRNLQJ
DWWKHUHVSHFWLYHEDFNSODQHV6HHWKHIROORZLQJÀJXUHIRUJXLGDQFH
1
2
1
II
I
4
3
ID
Host Fabric
Host Fabric
2
3
3
1
ID
4
2
II
1
4
I
A
B
1
2
3
4
C
1
2
3
4
2
A
1
2
3
4
B
1
2
3
4
C
1
2
3
4
Figure 6 Back plane view of the primary and EBOD enclosures
Label
1
Description
Primary enclosure
EBOD enclosure
9
/RFDWHWKHVHULDOQXPEHUVRQERWKWKHSULPDU\DQGWKH(%2'HQFORVXUH7KHVHULDOQXPEHU
VWLFNHULVDIÀ[HGRQWKHEDFNHDURIHDFKHQFORVXUH7KHVHULDOQXPEHUVPXVWEHidentical on
both enclosures. Contact technical support immediately if the serial numbers do not match.
6HHWKHIROORZLQJÀJXUHWRKHOS\RXORFDWHWKHVHULDOQXPEHUV
FC: XX-XXXX-X-XXXXX-XXX
HLA SN: ZZVPPPPPPPSSSSS
Rev. X
HLA P/N: PPPPPPP-XX
1
ID
3
2
1
4
II
Hos
I
t Fa
bric
bric
t Fa
I
Hos
II
1
2
3
4
ID
Figure 7 Rear view of the enclosure showing the location of the serial number sticker
Label
1
Description
Ear of the enclosure
3. The EBOD enclosure now needs to be connected to the primary enclosure using the provided
SAS cables. Perform the following steps.
D ,GHQWLI\WKHIRXU6HULDO$WWDFKHG6&6,6$6SRUWVRQSULPDU\HQFORVXUHDQG(%2'
enclosure. The SAS ports are labeled as EBOD on primary enclosure and CTRL on the
(%2'HQFORVXUHDVVKRZQLQ)LJXUH
b. Use provided SAS cables to connect EBOD ports to CTRL ports.
c. The EBOD port on Controller 0 should be connected to the CTRL port on EBOD controller
0. The EBOD port on Controller 1 should be connected to the CTRL port on EBOD
FRQWUROOHU6HH)LJXUHIRUJXLGDQFH
10
4
3
2
1
EBOD
4
3
2
1
II
I
ID
5
1
EBOD
A
Host Fabric
2
Host Fabric
EBOD
2
3
ID
4
2
1
1
II
A
4
3
I
7
6
B
1
2
3
4
C
CTRL
L
CTRL
A
1
2
3
4
B
1
B
1
2
3
3
4
4
8
2
3
4
C
1
2
3
4
A
1
2
3
4
CTRL
Figure 8 SAS cabling for your device
Label
A
B
1
3
4
5, 6
7, 8
Description
Primary enclosure
EBOD enclosure
Controller 0
Controller 1
EBOD Controller 0
EBOD Controller 1
SAS ports on primary enclosure
ODEHOHG(%2'
6$6SRUWVRQ(%2'HQFORVXUHODEHOHG&75/
Power cabling
<RXUGHYLFHKDVDSULPDU\HQFORVXUHDQGDQ(%2'HQFORVXUH%RWKHQFORVXUHVLQFOXGHUHGXQGDQW
3RZHUDQG&RROLQJ0RGXOHV3&0V,QHDFKHQFORVXUHHDFK3&0PXVWEHLQVWDOOHGDQGFRQQHFWHG
to different power sources to ensure high availability.
Perform the following steps to cable your device for power.
(QVXUHWKDWWKHSRZHUVZLWFKHVRQDOOWKH3&0VDUHLQWKH2))SRVLWLRQ
)RUWKHSULPDU\HQFORVXUHFRQQHFWWKHSRZHUFRUGVWRERWK3&0V7KHSRZHUFRUGVDUH
11
LGHQWLÀHGLQUHGLQWKHIROORZLQJGLDJUDP
3. Ensure that the two PCMs of the primary enclosure use separate power sources.
$WWDFKWKHSRZHUFRUGVWRWKHUDFNSRZHUGLVWULEXWLRQXQLWVDVVKRZQLQWKHIROORZLQJÀJXUH
5HSHDWVWHSVIRUWKH(%2'HQFORVXUH
7XUQRQWKH(%2'HQFORVXUHE\ÁLSSLQJHDFK3&0·VSRZHUVZLWFKWRWKH21SRVLWLRQ
9HULI\WKDWWKH(%2'HQFORVXUHLVWXUQHGRQE\FKHFNLQJWKDWWKH(%2'FRQWUROOHU/('VJUHHQ
/('VRQWKHEDFNRIWKHFKDVVLVKDYHWXUQHG21
1RZWXUQRQWKHSULPDU\HQFORVXUHE\ÁLSSLQJHDFK3&0VZLWFKWRWKH21SRVLWLRQ
9. Verify that the system is up by ensuring the device controller LEDs have turned ON.
10. Verify that the connection between EBOD controller and device controller is active by ensuring
WKH6$6/('V/('VQH[WWRWKH6$6SRUWRQWKH(%2'FRQWUROOHUDUHJUHHQ
NOTICE
To ensure high availability of your system, you are advised to strictly adhere to the power
cabling scheme shown in the following diagram.
Figure 9 Power cabling for your device
Label
1
3
4
5
6
7
8
9
Description
Primary enclosure
PCM 0
PCM 1
Controller 0
Controller 1
EBOD controller 0
EBOD controller 1
EBOD enclosure
PDUs
Network cabling
<RXUGHYLFHLVLQDQDFWLYHVWDQGE\FRQÀJXUDWLRQDWDQ\JLYHQWLPHRQHFRQWUROOHUPRGXOHLV
active and processing all disk and network operations while the other controller module is standby.
In the event of a controller failure, the standby controller immediately activates and continues all
the disk and networking operations.
To support this redundant controller failover, you need to cable your device network as shown in
the following steps.
<RXUGHYLFHKDVVL[QHWZRUNLQWHUIDFHVRQHDFKFRQWUROOHUIRXU*ESVDQGWZR*ESV(WKHUQHW
ports. Identify the various data ports in the backplane of your device.
Figure 10 Back plane of your device showing the data ports
Label
0, 1, 4, 5
6
Description
1 Gbps network interfaces
10 Gbps network interfaces
Serial ports
13
)RUKLJKDYDLODELOLW\WKHGHYLFHUHTXLUHVDPLQLPXPRIWZRFRQQHFWLRQVIRUHDFKFRQWUROOHU
D 7KH'$7$SRUWLVDXWRPDWLFDOO\HQDEOHGDQGFRQÀJXUHGYLDWKHVHULDOFRQVROHRIWKH
GHYLFH$SDUWIURP'$7$DQRWKHUGDWDSRUWDOVRQHHGVWREHFRQÀJXUHGWKURXJKWKH
Management Portal.
E ,GHQWLI\LGHQWLFDOQHWZRUNLQWHUIDFHVRQHDFKFRQWUROOHU)RULQVWDQFHLI\RXFKRRVH
to connect DATA 0 and DATA 3 for one of the controllers, you need to connect the
corresponding DATA 0 and DATA 3 on the other controller.
)RU+$HQVXUHWKDW\RXFRQQHFW
a. Identical interfaces on each controller to the relevant network to ensure availability
through a controller failure.
b. Interfaces from each controller to at least two different switches to ensure availability
through a switch failure.
F '$7$SRUWWRWKHSULPDU\/$1QHWZRUNZLWK,QWHUQHWDFFHVV7KHRWKHUGDWDSRUWVFDQEH
FRQQHFWHGWR6$1L6&6,/$19/$1VHJPHQWRIWKHQHWZRUNGHSHQGLQJRQWKHLQWHQGHGUROH
$WDPLQLPXPFRQÀJXUHRQHQHWZRUNLQWHUIDFHIRUFORXGDFFHVVDQGRQHIRUL6&6,)RU+$DQG
SHUIRUPDQFHFRQÀJXUHWZRSDLUVRIQHWZRUNLQWHUIDFHVRQHDFKFRQWUROOHU6HHWKHIROORZLQJ
GLDJUDPIRUQHWZRUNFDEOLQJ7KHPLQLPXPQHWZRUNFRQÀJXUDWLRQLVVKRZQE\VROLGEOXHOLQHV
)RU+$DQGSHUIRUPDQFHDGGLWLRQDOFRQÀJXUDWLRQUHTXLUHGLVVKRZQE\GRWWHGOLQHV
Figure 11 Network cabling for your device
14
Label
A
B
C
D
E
)
G
H, I
0-5
6
7
Description
LAN with Internet access
Controller 0
PCM 0
Controller 1
PCM 1
EBOD controller 0
EBOD controller 1
+RVWVIRUH[DPSOHÀOHVHUYHUV
Network interfaces
Primary enclosure
EBOD enclosure
Serial port cabling
Perform the following steps to cable your serial port.
<RXUGHYLFHKDVDVHULDOSRUWRQHDFKFRQWUROOHULGHQWLÀHGE\DZUHQFKLFRQ/RFDWHWKHVHULDO
SRUWVLQWKHEDFNSODQHRI\RXUGHYLFHXVLQJ)LJXUH
,GHQWLI\WKHDFWLYHFRQWUROOHULQ\RXUGHYLFHEDFNSODQH$EOLQNLQJEOXH/('LQGLFDWHVWKH
controller is active.
8VHWKHSURYLGHGVHULDOFDEOHLIQHHGHGWKH86%VHULDOFRQYHUWHUIRU\RXUODSWRSDQGFRQQHFW
\RXUFRQVROHRUFRPSXWHUZLWKWHUPLQDOHPXODWLRQWRWKHGHYLFHWRWKHVHULDOSRUWRIWKH
active controller.
4. Install the serial-USB drivers shipped with this device on your computer.
5. Set up the serial connection as follows: 115,200 baud, 8 data bits, 1 stop bit, noSDULW\ÁRZ
control set to None.
6. Verify the connection is working by pressing Enter in the console. A serial console menu
should be presented.
NOTICE
Lights-Out Management: When the device is installed in a remote data center or in a
computer room with limited access, ensure that the serial connections to both controllers are
always connected to a serial console switch or similar equipment. This allows out-of-band
remote control and support operations in case of network disruption or unexpected failures.
<RXKDYHFRPSOHWHGFDEOLQJ\RXUGHYLFHIRUSRZHUQHWZRUNDFFHVVDQGVHULDOFRQQHFWLRQ
15
‹0LFURVRIW&RUSRUDWLRQ‡;