UTILITIES LAND AT TURWESTON ROAD, BRACKLEY ` Scheme Ref: Job Name: Client: Postcode OS Ref National Grid Ref Site NN13 7UG 459274, 237807 SP592378 Electric - new supply Western Power/Central Networks Electric Diversion Western Power/Central Networks Electric -Road Access Diversion Western Power/Central Networks Water Sewerage Anglian Water Anglian Water Services Limited, Developer Services PO Box 495 Huntingdon PE29 6YY Water - Mains Fax/Email/ Internet Anglian Water . Anglian Water Services Limited, Developer Services PO Box 495 Huntingdon PE29 6YY Water - Mains Statutory Utility Company 15400-424 Land off Turweston Road, Brackley Tim Brown Western Power WPD Utilities, Pegasus business Park, Herald Way, Castle Donington, Derbyshire, DE75 2TU Western Power/Central Networks Customer Applications Team 3rd Floor Toll End Road Tipton DY4 0HH Western Power/Central Networks Customer Applications Team 3rd Floor Toll End Road Tipton DY4 0HH Western Power/Central Networks Customer Applications Team 3rd Floor Toll End Road Tipton DY4 0HH development of 350 dwellings 23/11/11 update on utilities sent to Simon Davis via email - no tech note issued 16/12/11 drawing issued to SD Date Quote Received Amount of quote Email address Contact Name Contact Tele: 19.03.2014 £218,375 [email protected] A Rogers/Graham Hill (Martin Mills runs planning dept) 01604 875563/875558 17.03.2014 emailed site plans and access plans to A Rogers to ask for within-site and external-to-site enq 1921356; scheme diversionary requirements with costs. 06.03.2014 Spoke to A Rogers and emailed 3 old files for reference. 683095 He will pass on to Graham Hill for re-quote to include infrastructure, diversionary costs and connection costs. 19.03.2014 £174,140 [email protected] A Rogers/Graham Hill (Martin Mills runs planning dept) 01604 875563/875558 17.03.2014 emailed site plans and access plans to A Rogers to ask for within-site and external-to-site enq 1921517; scheme diversionary requirements with costs. 06.03.2014 Spoke to A Rogers and emailed 3 old files for reference. 683157 He will pass on to Graham Hill for re-quote to include infrastructure, diversionary costs and connection costs. 20.03.2014 £26,327 [email protected] A Rogers/Graham Hill (Martin Mills runs planning dept) 01604 875563/875558 enq 1912260; scheme To be undertaken in 278 works 683007 27.05.14 See Pre Planning Assessment Report [email protected] Mike Farrer 07771 773154 27.05.14 See Pre Planning Assessment Report [email protected] Mike Farrer 07771 773154 1106/SP87(003) 20.03.2014 £700 per plot [email protected] k Penny Carolan 07710 155750 U655 Ref Number 1106/SP87(003) Comments Sewer pipe & manholes now installed 21/10/11 application form and letter sent to Jenny Bennett in accounts/Reading for her to send out with the cheque 1/11/11 AWS ack receipt of application will respond within 15 working days. 18/11/11 first 20 properties can be supplied but then reinforcement required at a cost of £92,000 plus strategic main contribution infrastructure costs of £700 per plot. No connection charge if all 350 connected in one go. If phased connection, cost is £1700 per phase or £2388 if the ground is contaminated. 1 of 2 UTILITIES LAND AT TURWESTON ROAD, BRACKLEY Gas - New supplies Gas - New supplies Gas - New supplies Statutory Utility Company Western Power Scotia Gas Networks Fulcrum Connections. Fax/Email/ Internet WPD Utilities, Pegasus business Park, Herald Way, Castle Donington, Derbyshire, DE75 2TU SGN Connections St Lawrence House Station Approach Horley Surrey RH6 9HJ Carr House Greasebrough Road Rotherham South Yorkshire S61 4QQ Date Quote Received Amount of quote Email address Contact Name Contact Tele: Ref Number 27.03.2014 £700 per plot [email protected] k Penny Carolan 07710 155750 U655 16/11/2011 £245,000 Joe Lewis / Vaishali Puri 01293 818266 / 01293 818084 L11127690 / 357263 Tim Carroll 0845 641 3010 (office) 01938 570897 (Home) 07976 641065 5029377/PQ054899 27.03.2014 £ 253,750.00 [email protected] Comments no infrastructure costs. No connection or commisssioning costs if all done in one go. If phased, costs will be £700 per occasion. 1/11/11 POC received onto 125 PE LP main 85 meters from site - new supply quote to come from SGN connections - Steven Rose (should be will us by 22/11/11) 16/11/11 new supply quote received - offsite reinforcement work subject to network economic test. 18.3.2014 emailed completed application. 17.3.2014 emailed access and site drawings to ask for Infrastructure and connection quote plus diversionary works within and external to site. Diversionary costs are key. 2 of 2
© Copyright 2024 ExpyDoc