Capital Improvement Projects in Progress Precinct 2

PUBLIC WORKS DEPARTMENT
Project: FM 471 Culebra Rd
Precinct: 1 & 2
Location / Limits:
From FM 1560 to Old FM 471.
Scope:
The construction will complete the
capacity gap that currently exists on
FM 471 from FM 1560 to Old FM
471. The proposed improvements
will widen Culebra Road from its
existing two-lane configuration to a
four-lane divided roadway with
anticipated bicycle and pedestrian
amenities.
Status: Final Design
Additional Information:
Consultants: CP&Y / Atkins
Advertise Date: 2 Q 2015
Contractor: TBD
Construction Start Date: 2 Q 2015
Construction Cost: $ 14,719,463
Construction End Date: 4 Q 2016
Joint Bid: SAWS, CPS Gas.
Pass Thru Project (TX DOT)
January 30, 2015
PUBLIC WORKS DEPARTMENT
Project:
Galm Road Phase II
Precinct: 2
Location / Limits:
Silver Bells St to Government
Canyon State Natural Area.
Scope:
Reconstruct Galm Road from Silver
Bells to Government Canyon State
Natural Area and alleviate flooding at a
low water crossing.
The drainage work includes a new
bridge and earthen channel along the
Culebra creek and improving and
widening
roadway
section
and
roundabout
intersection
at
“Government Canyon State Natural
Area” entrance.
Status: Construction. (60 %)
Additional Information:
Consultants: HNTB / Klotz / Terracon
Bid Opening: Dec. 13, 2013
Contractor: Capital Excavation
Construction Start: 1 Q 2013
Construction Cost: $ 6,576,575
Construction End Date: 2 Q 2015
Joint Bid: SAWS, CPS.
With Flood Control Component
January 30, 2015
PUBLIC WORKS DEPARTMENT
Project:
Galm Road Phase III
Precinct: 2
Location / Limits:
From FM 471 to Government
Canyon State Park.
Scope:
Galm Rd is currently a 2 lane
Roadway and will be reconstructed
to include 4-12’ travel lanes, turn
lanes, curb and gutter, drainage
improvements 6’ sidewalk 5’ bike
lanes.
Status: R.F.Q.
Additional Information:
Consultants: TBD
Bid Opening: TBD
Contractor: TBD
Construction Start: TBD
Construction Cost: $ 7,500,000
Construction End Date: TBD
Joint Bid: N/A
MPO Project
January 30, 2015
PUBLIC WORKS DEPARTMENT
Project:
Steubing Rd
Precinct: 2
Location / Limits:
FM 1560 to Shaenfield Rd.
Scope:
Proposed roadway reconstruction
with concrete pavement.
Status: Planning.
Additional Information:
Consultant: TBD
Advertise Date:
Contractor: TBD
Construction Start Date:
Construction Cost: $ 3,000,000
Construction End Date: TBD
Joint Bid: TBD
January 30, 2015
TBD
TBD
PUBLIC WORKS DEPARTMENT
Project: Shaenfield Place
Subdivision
Precinct: 2
Location / Limits:
Various
streets
within
Shaenfield Place Subdivision.
Scope:
The scope of this project is to
provide
mill/overlay
and
reconstruction of multiple streets
within Shaenfield Subdivision.
Status: Preliminary.
Additional Information:
Consultant: Gonzalez – De la Garza
Advertise Date:
Contractor: TBD
Construction Start Date:
Construction Cost: $ TBD
Construction End Date: TBD.
Joint Bid: TBD
January 30, 2015
TBD
TBD