2/ logistic operations

MARITIME ACCESS & LOGISTIC OPERATIONS
on the REBO terminal in ENERGY PORT OOSTENDE
© Alstom
outstanding geographical location
excellent & immediate access to open sea
no locks
priority to offshore wind vessels
WHY PORT OF OOSTENDE?
1/ MARITIME ACCESS
>
outstanding geographical location
>
excellent & immediate access to open sea
>
no locks
>
priority to offshore wind vessels
>
127 ha available in the port of Oostende for renewable energy activities
>
quays with a capacity able to handle from 4T/m2 to 20 T/m2
15 Ha of terminal surfaces (with heavy lift capacity) and with capacity for extension
WHY PORT OF OOSTENDE?
1/ MARITIME ACCESS
WHY PORT OF OOSTENDE?
1/ MARITIME ACCESS
200 KM
WHY PORT OF OOSTENDE?
1/ MARITIME ACCESS
WHY
PORT OF OOSTENDE?
ZONES RESERVED
MERMAID: 266 MW (20 MW wave energy)
NORTHWESTER II: 224 MW
FOR WIND FARMS
BELWIND : 330 MW (165 MW + 165 MW)
SEASTAR: 246 - 432 MW
NORTHWIND: 216 MW
RENTEL: 288 - 312 MW
55 x
Blighbank
C-POWER: 325 MW
72 x
operational
future Stevin connection
NORTHER: 350 MW
Lodewijkbank
30 x
TOTAL: 2251 - 2461 MW
24 x
connection to Zeebrugge
Thorntonbank
ongoing
connection to Oostende
ZEEBRUGGE
NORTH SEA
29 KM
29 km
db
ed
WE
ZEN
DO
K
K
Flansea
20T/m²
B
GeoSea
Falck
Fabricom
Parkwind
Rebo
Alstom Vestas
ry
lex
Sen
vion
H
ch
L
EU
ZEE
DO
ltite
N
NG
OOSTENDE
RIJ
new
Mu
CM ltitech
I
SE
AA
M
VE
HA
VIS
Mu
E
LV
HA
C-Power
gri
n
in preparation
WHY REBO?
15%
40%
15%
15%
15%
zone
km from
Ostend
WIND FARM
STATUS
TURBINE TYPE
1
22
Norther
in preparation
not know yet
2
29
C-Power
350 MW
Eneco + Elicio (ex. Electrawinds) (PMV)
30 MW
EDF - Socofé - Nuhma - Marguerite fund - Deme
Senvion 5 MW
6
Senvion 6.15 MW
48 295.2 MW
Rentel
in preparation
not know yet
4
43
Northwind
ongoing
Vestas 3 MW
Seastar
in preparation
not know yet
50
SHARE HOLDERS
operational
36
6
TOTAL MW
operational
3
5
#
288 - 312 MW
72 216 MW
246 - 432 MW
Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port Elicio (ex. Electrawinds) (PMV) )
Parkwind (Colruyt - PMV - Korys) - Sumitomo - Aspiravi - WE Power
Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port Elicio (ex. Electrawinds) (PMV) )
operational
Vestas 3 MW
55 165 MW
Parkwind (Colruyt - PMV - Korys) - Sumitomo
ongoing
Alstom Haliade 6 MW
1
6 MW
Alstom Wind (100%)
Belwind II
2015
not know yet
165 MW
Parkwind (Colruyt - PMV - Korys) - Sumitomo
Belwind I
7
55
Northwester II
in preparation
not know yet
224 MW
Colruyt - Incontrol - TTR Energy (TPF - TTRAG) - Wagram Invest
8
57
Mermaid
in preparation
not know yet
266 MW
Otary (Aspiravi Offshore - P@S - Deme - SRIW - Socofé - Z-Kracht - Rent a
Port - Elicio (ex. Electrawinds) (PMV) ) - Electrabel
total
2251 - 2461
MW
49-73 x
NORTHWIND: 216 MW
20 x
RENEWEABLE ENERGY SITES
RENTEL: 288 - 312 MW
55 x
Blighbank
C-POWER: 325 MW
72 x
NORTHER: 350 MW
1/ MARITIME ACCESS
30 x
TOTAL: 2 120 MW
24 x
Halve maan
- site prepared for offshore
wind works
- surface: 5 ha
- quay length: 100 m
- quay capacity: 10 T/m²
- draught: -8 LAT
ZEEBRUGGE
NORTH SEA
29 km
VIS
SE
RIJ
DO
K
L
EU
NG
N
AA
M
WE
db
ed
ZEE
ZEN
K
20T/m²
Rebo terminal
GeoSea
B
Falck
Fabricom
Parkwind
Alstom
ponto
Vestas
on
ion
H
san
comitary
plex
offices & storage
Vlotdok
- site prepared for berthing & refueling
- length: 800 m
berthing places
DO
ltite
ch
OOSTENDE
gri
n
office
crew changes
& refueling
VL
OT
D
OK
HOUTD
OK
K
Zeewezendok
- site prepared for offshore
wind works
- surface: 15 ha
- quay length: 600 m
- quay capacity:
4 T/m² to 20 T/m²
- draught: - 8m LAT
ZW
AA
IDO
assembly & storage
area behind the locks
VE
HA
assembly & storage area
with direct access to open
sea
E
LV
HA
C-Power
Mu
Thorntonbank
36-78 x
Ene
rgy
new
Mu
CM ltitech
I
Lodewijkbank
Senv
41-62 x
marine services
geoXYZ
GEOGRAPHICAL POSITION
1/ MARITIME ACCESS
pilotage
- for vessels with a LOA of 80 M or +
- 24 hrs from Wandelaar pilot
- tugs available
+/- 1