GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES, OFFICE OF THE CHIEF ENGINEER-CUM-PROJECT DIRECTOR, PROJECT MANAGEMENT UNIT, OIIAWMIP, TH 5 FLOOR, RAJIV BHAWAN, BHUANESWAR-751001 (E-mail: [email protected]) Phone: +91-674-2391275, Fax: +91-674-2391459 Corrigendum to Quotation Call Notice Identification No. PMU.03/2014-15 dtd. 19.11.2014. In partial modification of Quotation Call Notice Identification No.PMU.03/2014-15 dtd. 19.11.2014 the required quantity as shown in the detailed Statement in Column No.03 against package No. MLI-XIV 10 Sq mm T.D Cable and 16 Sqmm TD Cable may be read as 8635 Mtrs. and 1720 Mtrs. instead of 8635 Nos. and 1720 Nos. respectively. Other terms and conditions of the Quotation Call notice remain unchanged. CHIEF ENGINEER-CUM-PROJECT DIRECTOR PMU, OIIAWMIP. Memo No. Date: Copy submitted to the Principal Secretary, Dept. of Water Resources, Rajeev Bhawan, Bhubaneswar for favour of kind information. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. Memo No. Date: Copy submitted to the Director, CAD-PIM-cum-Special Secretary to Govt. DoWR / Engineer in Chief (Water Resources) / Engineer in Chief (P&D) Secha Sadan, Bhubaneswar for favour of kind information. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. Memo No. Date: Copy forwarded to the Director, M&E, Office of the EIC, Secha Sadan, Bhubaneswar for information with a request to display the Corrigendum to Quotation Call Notice in the website of DoWR, Odisha till 1.30 PM of 08.12.2014. The soft copy containing the Corrigendum Quotation Call Notice are enclosed herewith for reference and necessary action. Enc.: Soft copy as above - 1 No. : Hard copy as above– 1 No. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. Page 1 of 2 Memo No. Date: Copy forwarded to the Deputy Director (Press), I & PR Deptt., Govt. of Odisha, Bhubaneswar with a request to get it published for one day in shortest space possible in one leading local English news paper and in two leading Odia dailies for wide circulation of the notice. Complimentary copy of news papers containing the corrigendum to quotation call notice may please be sent to this office for reference, record and release of payment towards advertisement charges. Enc.: Soft copy as above - 1 No. : Hard copy as above– 1 No. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. Memo No. Date Copy to the District Development Officer, Collectorate, Jajpur/Bhadrak/Balasore/Mayurbhanj for information and wide circulation of the notice. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. Memo No. Date Copy with hard & soft copy of the Corrigendum to Quotation document forwarded to the Deputy Director, C & QCS, Dam Safety Division (Medium Projects), Bhubaneswar for information and necessary action. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. Memo No. Date Copy forwarded to Accounts Officer, PMU / Assistant Engineer - MLIP / Team Leader, ISPMC / Notice Board for information. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. Memo No. Date Copy forwarded to the Managing Director, Orissa Lift Irrigation Corporation, Bhubaneswar / Superintending Engineer OLIC Cuttack Circle, Cuttack for information and necessary action. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. Memo No. Date Copy forwarded to the Executive Engineers, LI Division, Jajpur Road/ Bhadrak/ Balasore/ Mayurbhanj for information with a request to display this Corrigendum to Quotation Call Notice in their Office Notice Board for wide circulation. Chief Engineer-cum-Project Director PMU (OIIAWMIP), Bhubaneswar. C.C. through e-mail to: 1) Ms.Cindy Malvicini , ADB. 2) INR Mission, New Delhi. 3) Project Administration Unit, ADB. Page 2 of 2
© Copyright 2024 ExpyDoc