PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO A NIVEL NACIONAL (BLS) FECHA DE REPORTE: 21 DE AGOSTO DE 2015 MES: AGOSTO 2015 (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN 01-08-15 02-08-15 03-08-15 04-08-15 05-08-15 06-08-15 07-08-15 08-08-15 09-08-15 10-08-15 11-08-15 12-08-15 13-08-15 14-08-15 15-08-15 16-08-15 17-08-15 18-08-15 19-08-15 20-08-15 TOTAL NACIONAL TOTAL CIAS. PRIVADAS *TOTAL PETROAMAZONAS EP+ OPERACIONES RIO NAPO CEM 536.268 536.632 536.115 535.777 536.257 537.061 537.174 535.588 535.389 535.659 535.945 536.039 537.483 529.204 538.303 538.059 537.696 538.378 538.636 539.737 117.396 117.322 117.119 117.083 117.600 117.915 117.516 115.821 115.133 115.630 115.781 116.227 116.889 115.933 118.374 117.487 117.319 117.990 118.459 118.909 418.872 419.310 418.996 418.694 418.657 419.146 419.658 419.767 420.256 420.029 420.164 419.812 420.594 413.271 419.929 420.572 420.377 420.388 420.177 420.828 1.101 450 651 21-08-15 22-08-15 23-08-15 24-08-15 25-08-15 26-08-15 27-08-15 28-08-15 29-08-15 30-08-15 31-08-15 DIFERENCIA HOY-AYER NOVEDADES PRELIMINARES: PROMEDIO AGOSTO 2015 REAL 536.570 117.095 419.475 *PETROAMAZONAS EP; BLOQUE 7: Pozo COCA A033 HP cerrado por 24 hrs Build Up, BLOQUE 12: Pozo EDEN YUTURIC141 continúa cerrado Build UP, Pozos EDEN YUTURI-C96, F37, J76 cerrados temporalmente por limitación de producción alto BSW, Pozo TUMALI SURESTE-2A3 continúa cerrado limitación de producción arenamiento, Pozo EDEN YUTURI-K110 continúa cerrado limitación de producción bajo flujo, Pozos EDEN YUTURI-D39, K108H continúa cerrado por sobre corriente, BLOQUE 56: GNT-06 cerrado 12 hrs trabajos de WO, GNT-10 apagado por 1 ora, Pozo PRHA-020 cerrado limitación de producción alto BSW%, BLOQUE 57: Pozos TTT 15B, SCY 38US, SCY 02US limitación de producción bajo flujo, Pozo SCY 22US cerrado temporalmente limitación de producción alto BSW, BLOQUE 18: Pozo PALO AZUL-B36HST1 continúa cerrado arranque de WO, Pozo PALO AZUL-19 Build Up, BLOQUE 44: Pozo Pucuna 02 cerrado temporalmente, BLOQUE 58: Pozo CYB 47 cerrado temporalmente limitación de producción alto BSW, Pozos SNS 14, 20 cambio de disco de ruptura en separador, Pozo VHR RAMAL SUR falla de generación eléctrica, BLOQUE 61: Pozo Auca sur 54 cerrado 24 hrs posible comunicación tbg-csg, Pozo Auca sur 144 cerrado 2 hrs por MPG, Pozo Auca central 31 cerrado 6 hrs intentando reversar bomba de subsuelo, Pozo Cononaco 58 cerrado 4 hrs por atascamiento de equipo BES. NOTA: Varios Pozos cerrados que no están en operación. PROMEDIO AGOSTO 2015 META DIFERENCIA REAL-META 565.896 -29.326 117.498 -403 448.398 -28.923 *CIA. OPERACIONES RIO NAPO CEM.; Pozos SACHA-026A, SACHA-108A cerrados 2 hrs limitación de producción bajo flujo, SACHA-009A cerrado 12 hrs trabajos de WO, SACHA-456D cerrado 24 hrs análisis de completación de fondo, Pozo SACHA362D cerrado 6 hrs paro de comunidades. *CIA. ENAP SIPEC, continúa pozos: Paraiso-7ST realizando trabajos de reacondicionamiento, pozo Paraiso-2 en mantenimiento preventivo % DE META EN AGOSTO 2015 94,8% 99,7% 93,5% *CIA. REPSOL ECUADOR S.A., Pozos: Amo-B8, Daimi-A12-A20, IRO-A1 continúan cerrados esperando por trabajos de reacondicionamiento, Amo-A110 y Iro-B20 continúan cerrados por baja producción; Daimi-A3, Iro A-18 presente falla en variador de frecuencia . *CIA. PETROBELL, Pozos: Cachiyacu-1 continua cerrado por problemas con comunidad Huaorani, Tigüino-17 cerrado esperando reacondicionamiento + Tigüinos -13RE1 cerrado por problemas mecánico en equipo de fondo esperando reacondicionamiento. *CIA. PETROORIENTAL S.A., Pozos: Hormiguero Sur-9, 31HST, 35, 11 presenta alto %BSW (bajo aporte), pozos, Nantu-1021-14, Hormiguero-8 y Tapir Norte-4, 8 continúan cerrados esperando trabajos de reacondicionamiento. CIAS./CONTRATOS PETROAMAZONAS EP OPERACIONES RIO NAPO CEM COMPAÑIAS PRIVADAS PRODUCCION ACTUAL 346.982 73.846 118.909 *CIA. ANDES PETROLEUM ECUADOR LTD, Pozo Fanny 18B-161 apagado a las 08H00, pozo Fanny-6 apagado por problemas de equipo de fondo, pozos Fanny 18B-52, Fanny 18B-13, Dorine 77H, Mariann 44, Mariann 34 apagados esperando reacondicionamiento. *CIA.CONSORCIO PEGASO, Pozos: Puma-14 continúa incrementa %BSW, Puma-12 continúa apagado por falla en completación y rotura de una varilla, Puma-9 continúa cerrado por baja producción. *CIA. TECPECUADOR S.A., continúa pozo Bermejo Sur-30 en espera de trabajos de Pulling. *CIA. PACIFPETROL, continúan12 Pozos de Ancón y 1 pozo Tigre-48S presentan bajo potencial, y pozos Santa Paula- 64 presenta golpe de fluido severo. *CÍA ORIONOIL ER S.A., Pozo Eno-2 desarmando equipo de coiled tubing, pozos Eno-1 y Ron-1 pozos abandonados temporalmente. ORION ENERGY OCANOPB S.A. Continúan pozo Ocano-1 apagado temporalmente 24 horas, pozo Peña blanca-1 continúa apagado por bomba atascada. NOTAS: TOTAL PETROLEO NETO 539.737 **LAS METAS DE PRODUCCION DE CAMPO PARA EL AÑO 2015, ESTAN EN BASE A LAS ESTIMACIONES HIDROCARBURIFERAS PARA EL PERIODO 2015-2018 APROBADAS POR LA SECRETARIA DE HIDROCARBUROS DEL ECUADOR (SHE) Y COMUNICADA MEDIANTE OFICIO Nro. MRNNR-DM-2014-0951-OF. POR EL MINISTERIO DE RECURSOS NATURALES NO RENOVABLES (HOY MINISTERIO HIDROCARBUROS). PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS) MES: AGOSTO 2015 FECHA DE REPORTE: 21 DE AGOSTO DE 2015 COMPARATIVO DIARIO (VOLUMENES PRELIMINARES SUJETOS A REVISION) (CERRADO A LAS 06H00) FECHA DE OPERACIÓN PETROAMAZONAS EP OPERACIONES RIO NAPO CEM TOTAL ESTADO+ MIXTAS 01-08-15 343.794 75.078 418.872 02-08-15 03-08-15 04-08-15 05-08-15 06-08-15 07-08-15 08-08-15 09-08-15 10-08-15 11-08-15 12-08-15 13-08-15 14-08-15 15-08-15 344.239 343.972 343.609 343.645 344.121 344.648 344.753 345.470 345.242 345.352 345.008 345.805 338.566 345.128 345.805 345.865 346.274 346.075 346.982 75.071 75.024 75.085 75.012 75.025 75.010 75.014 74.786 74.787 74.812 74.804 74.789 74.705 74.801 74.767 74.512 74.114 74.102 73.846 419.310 418.996 418.694 418.657 419.146 419.658 419.767 420.256 420.029 420.164 419.812 420.594 413.271 419.929 420.572 420.377 420.388 420.177 420.828 16-08-15 17-08-15 18-08-15 19-08-15 20-08-15 21-08-15 22-08-15 23-08-15 24-08-15 25-08-15 26-08-15 27-08-15 28-08-15 29-08-15 30-08-15 31-08-15 COMPAÑIAS ESTADO PETROAMAZONAS EP OPERACIONES RIO NAPO CEM TOTAL ESTADO+ MIXTAS PRODUCCION ACTUAL 346.982 73.846 420.828 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS) MES: AGOSTO 2015 FECHA DE OPERACIÓN CAMPO PUMA S.A (CONSORCIO PEGASO) TECPECUADOR CONSORCIO PETROSUD PETRORIVA CONSORCIO PALANDA YUCASUR PETROBELL PETRORIENTAL (BLOQUE 14 Y 17) REPSOL AREA BLOQUE 16 + TIVACUNO ANDES PETROLEUM TARAPOA AGIP OIL ENAP SIPEC GENTE OIL ECUADOR ORION ENERGY OCANOPB S.A. ORIONOIL ER S.A. PACIFPETROL TOTAL COMPAÑIAS PRIVADAS (VOLUMENES PRELIMINARES SUJETOS A REVISION) COMPARATIVO DIARIO 01-08-15 830 2.584 4.509 2.408 2.438 10.202 28.156 32.480 11.657 13.444 5.521 896 1.195 1.076 117.396 02-08-15 832 2.580 4.511 2.421 2.421 10.201 28.667 32.043 11.655 13.299 5.506 904 1.196 1.086 117.322 03-08-15 825 2.514 4.508 2.421 2.428 10.241 28.562 31.937 11.640 13.336 5.506 903 1.195 1.103 117.119 04-08-15 821 2.473 4.506 2.404 2.151 10.401 28.635 32.095 11.631 13.286 5.491 903 1.195 1.091 117.083 05-08-15 822 2.558 4.502 2.361 2.136 10.405 28.705 32.372 11.641 13.409 5.486 902 1.192 1.109 117.600 06-08-15 822 2.568 4.507 2.410 2.405 10.452 28.574 32.553 11.582 13.386 5.480 855 1.192 1.129 117.915 07-08-15 814 2.666 4.507 2.374 2.351 10.520 28.398 32.496 11.576 13.171 5.476 859 1.192 1.116 117.516 08-08-15 823 2.671 4.505 2.445 2.243 10.507 26.812 32.384 11.611 13.199 5.465 849 1.193 1.114 115.821 09-08-15 825 2.747 4.509 2.429 2.024 10.534 26.785 31.889 11.616 13.191 5.430 838 1.192 1.124 115.133 10-08-15 822 2.740 4.505 2.504 2.028 10.622 26.523 32.502 11.606 13.210 5.421 835 1.191 1.121 115.630 11-08-15 819 2.621 3.868 2.513 2.031 10.620 26.768 33.180 11.603 13.252 5.400 800 1.182 1.124 115.781 12-08-15 815 2.650 4.501 2.499 2.029 10.557 27.036 32.440 11.585 13.227 5.405 831 1.505 1.147 116.227 13-08-15 816 2.732 4.498 2.547 2.041 10.548 27.545 32.569 11.582 13.225 5.381 830 1.514 1.061 116.889 14-08-15 809 2.711 4.493 2.566 2.081 10.521 27.752 33.046 11.585 13.211 3.870 830 1.384 1.074 115.933 15-08-15 813 2.676 4.456 2.554 2.150 10.518 28.065 33.123 11.579 13.004 5.360 830 2.082 1.164 118.374 16-08-15 816 2.579 4.479 2.546 2.224 10.513 28.009 32.807 11.502 12.923 5.350 830 1.754 1.155 117.487 17-08-15 811 2.540 4.483 2.589 2.576 10.430 27.743 33.172 11.588 12.143 5.356 825 1.998 1.065 117.319 18-08-15 806 2.744 4.486 2.576 2.463 10.474 27.801 33.750 11.568 12.698 5.339 828 1.399 1.058 117.990 19-08-15 800 2.683 4.488 2.616 2.512 10.433 27.899 33.824 11.558 13.163 5.338 823 1.175 1.147 118.459 20-08-15 803 2.698 4.482 2.622 2.420 10.484 28.031 33.859 11.550 13.177 5.321 829 1.532 1.100 118.909 817 2.637 4.465 2.490 2.258 10.459 27.823 32.726 11.596 13.148 5.345 850 1.373 1.108 117.095 PROMEDIO AGOSTO 2015 META 726 2.142 4.320 1.675 2.604 10.958 28.122 28.262 11.482 12.325 9.823 1.305 2.090 1.665 117.498 DIFERENCIA REAL -META AGOSTO 2015 91 495 145 815 -346 -499 -298 4.464 114 823 -4.478 -455 -717 -557 -403 % DE META AGOSTO 2015 112,6% 123,1% 103,4% 148,7% 86,7% 95,4% 98,9% 115,8% 101,0% 106,7% 54,4% 65,1% 65,7% 66,6% 99,7% 21-08-15 22-08-15 23-08-15 24-08-15 25-08-15 26-08-15 27-08-15 28-08-15 29-08-15 30-08-15 31-08-15 PROMEDIO AGOSTO 2015 REAL
© Copyright 2024 ExpyDoc