produccion diaria de petroleo neto de campo a nivel nacional

PRODUCCION DIARIA DE PETROLEO NETO
DE CAMPO A NIVEL NACIONAL (BLS)
FECHA DE REPORTE: 30 DE MARZO DE 2015
MES: MARZO 2015
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
FECHA DE
OPERACIÓN
01-03-15
02-03-15
03-03-15
04-03-15
05-03-15
06-03-15
07-03-15
08-03-15
09-03-15
10-03-15
11-03-15
12-03-15
13-03-15
14-03-15
15-03-15
16-03-15
17-03-15
18-03-15
19-03-15
20-03-15
21-03-15
22-03-15
23-03-15
24-03-15
25-03-15
26-03-15
27-03-15
28-03-15
29-03-15
TOTAL NACIONAL
TOTAL CIAS.
PRIVADAS
*TOTAL PETROAMAZONAS EP+RIO
NAPO
552.408
553.259
553.405
552.085
554.872
555.194
557.082
554.585
554.520
555.186
552.092
550.852
550.806
550.742
552.312
552.157
553.433
553.223
552.575
550.909
550.342
551.993
551.995
552.588
553.879
552.617
553.091
550.661
553.764
128.241
129.098
128.345
127.644
128.404
127.688
128.411
126.796
127.424
127.491
125.357
125.249
124.860
124.959
124.896
124.685
125.046
124.815
124.219
123.957
123.990
123.934
123.420
123.451
123.708
123.712
124.221
121.818
124.057
424.167
424.161
425.059
424.441
426.468
427.506
428.672
427.789
427.097
427.695
426.735
425.604
425.946
425.782
427.415
427.471
428.387
428.407
428.356
426.952
426.352
428.059
428.575
429.138
430.172
428.905
428.870
428.843
429.707
3.103
2.239
864
30-03-15
31-03-15
DIFERENCIA
HOY-AYER
NOVEDADES:
*CIA PETROAMAZONAS EP., Bloque-61: pozo YUCA 23 apagado 3 hrs. por falla en el VSD + cambio de
PROMEDIO
MARZO 2015
REAL
552.849
125.514
427.336
PROMEDIO
MARZO 2015
META
586.680
121.823
464.857
tarjeta invertir; Bloque-18 Palo Azul-54H: apagado 1 hr por trabajo mecánico, Bloque 7: pozos del Pad Coca K020,021,024,025,026,027,,029,40,041,42,43,44,45: apagados 1 hora por problemas de generación, Bloque-57:
pozo Aguarico-054 declina fluidos por baja presión, Shushufindi-175 estabiliza la producción + incrementa BSW,
Bloque-12: 7 pozos Edén Yuturi, Pañacocha continúan cerrados 24 hrs por falla eléctrica, Bloque-15:
Limoncocha-06 limitación de producción baja fluidos, Bloque-55: pozo Armadillo-01: apagado 24 hrs. por
daño en la vía no se puede evacuar con vacum la producción.
NOTA:Varios Pozos cerrados que no están en operación.
*CIA. CONSORCIO PALANDA YUCA SUR, Pozos: LLumpak-2D cerrado para build-up. Continúa, Yuca
Sur-14 cerrado para build-up. Esperando reacondicionamiento.
*CIA. REPSOL ECUADOR S.A. , Generado a crudo GE-3170 E, fuera de servicio para mantenimiento de
DIFERENCIA
REAL-META
MARZO 2015
-33.831
3.691
-37.521
% DE META EN
MARZO 2015
94,2%
103,0%
91,9%
16000 hrs (3 Pozos cerrados ), 6 pozos cerrados temporalmente por restricción de producción por facilidades (
alto nivel de agua en tanques), Además pozos: Amo-B3-B9 -B8, Daimi-A12, Iro-A8 e Iro-A9 cerrado esperando
reacondicionamiento, Iro-A7 cerrado por 24 horas falla en VSD (eléctrico), Capiron-A8 falla de equipo BES,
Daimi-A4 cerrado temporalmente por falla eléctrica, Bogi-A7 cerrado por falla en bomba de inyección, Ginta-A11
realizando trabajos de reacondicionamiento.
*CIA. PETROBELL, Pozos: Cachiyacu-1 continúa cerrado por problemas con la Comunidad, Tiguino-04
cerrado 1 hora por cambio de potencia en superficie.
*CIA. PETROORIENTAL S.A., Pozos: Hormiguero-8 continúa cerrado esperando reacondicionamiento,
Hormiguero-31ST1 y Nantu-10 -21 cerrados 24 horas por bajo aporte, Hormiguero-26 cerrador 24 horas falla de
equipo de fondo.
*CIA. RIO NAPO, 4 pozos cerrados realizando trabajos de reacondicionamiento.
CIAS./CONTRATOS
*CIA.ORION ENERGY OCANOPB, Pozo: Peña Blanca-2 cerrado 24 horas por falla mecánica.
PRODUCCION ACTUAL
*CIA. ANDES PETROLEUM ECUADOR LTD., pozos: Chorongo-2, Mahogany-5, 9, Colibri-1, Sonia-8,
PETROAMAZONAS EP
354.692
18H, Esparanza-1, Dorine Norte-1 y 2, Dorine-39, 77H, Fanny 18B-83, continuan apagados por control de
producción de agua.
*CIA.CONSORCIO PEGASO, Pozos: Puma-9 cerrado por baja produccion, Puma-12 cerrado por falla en
RIO NAPO
COMPAÑIAS PRIVADAS
75.015
124.057
completación y rotura de varilla.
*CIA. GENTE OIL ECUADOR, Pozo Singue-9 cerrado 8 horas por falla en generación eléctrica.
*CIA. TECPECUADOR S.A., , Pozos: Bermejo Norte-19, Bermejo Sur-8 cerrado 24 horas esperando
trabajos de pulling, Bermejo Sur-1014 cambio de banda, El Rayo-05 cerrado 24 horas pozos en observación.
TOTAL PETROLEO NETO
553.764
PRODUCCION DIARIA DE PETROLEO NETO DE
CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS)
MES: MARZO 2015
FECHA DE REPORTE: 30 DE MARZO DE 2015
COMPARATIVO DIARIO
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
FECHA DE
OPERACIÓN
(CERRADO A LAS 06H00)
TOTAL
PETROAMAZONAS
RIO NAPO ESTADO+
EP
MIXTAS
01-03-15
350.450
73.717 424.167
02-03-15
03-03-15
04-03-15
05-03-15
06-03-15
07-03-15
08-03-15
09-03-15
10-03-15
11-03-15
12-03-15
13-03-15
14-03-15
15-03-15
350.386
351.256
350.601
352.566
353.591
354.768
353.886
353.096
353.534
352.247
351.113
351.462
351.346
352.890
352.889
353.806
353.810
353.744
352.320
351.711
353.353
353.745
354.116
355.066
354.788
353.801
353.840
354.692
73.775
73.803
73.840
73.902
73.915
73.904
73.904
74.000
74.161
74.488
74.491
74.485
74.436
74.525
74.582
74.581
74.597
74.612
74.632
74.642
74.706
74.830
75.022
75.106
74.117
75.069
75.003
75.015
16-03-15
17-03-15
18-03-15
19-03-15
20-03-15
21-03-15
22-03-15
23-03-15
24-03-15
25-03-15
26-03-15
27-03-15
28-03-15
29-03-15
30-03-15
31-03-15
COMPAÑIAS
ESTADO
PETROAMAZONAS
EP
RÍO NAPO
TOTAL ESTADO+
MIXTAS
PRODUCCION
ACTUAL
354.692
75.015
429.707
424.161
425.059
424.441
426.468
427.506
428.672
427.789
427.097
427.695
426.735
425.604
425.946
425.782
427.415
427.471
428.387
428.407
428.356
426.952
426.352
428.059
428.575
429.138
430.172
428.905
428.870
428.843
429.707
PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS)
MES: MARZO 2015
FECHA DE OPERACIÓN
CAMPO PUMA S.A
(CONSORCIO PEGASO)
TECPECUADOR
CONSORCIO PETROSUD
PETRORIVA
CONSORCIO PALANDA
YUCASUR
PETROBELL
PETRORIENTAL (BLOQUE
14 Y 17)
REPSOL AREA BLOQUE
16 + TIVACUNO
ANDES PETROLEUM
TARAPOA
AGIP OIL
ENAP SIPEC
GENTE OIL ECUADOR
ORION ENERGY
OCANOPB S.A.
ORIONOIL ER S.A.
PACIFPETROL
TOTAL COMPAÑIAS
PRIVADAS
(VOLUMENES PRELIMINARES SUJETOS A REVISION)
COMPARATIVO DIARIO
01-03-15
963
2.818
4.903
2.843
2.670
12.203
29.030
34.785
11.949
13.821
7.713
1.168
2.248
1.125
128.241
02-03-15
960
2.839
4.916
2.842
2.670
12.189
29.859
34.632
11.992
13.850
7.700
1.301
2.243
1.103
129.098
03-03-15
966
2.776
4.861
2.840
2.683
12.004
29.407
34.729
11.999
13.839
7.685
1.223
2.233
1.100
128.345
04-03-15
965
2.777
4.899
2.809
2.687
11.905
28.667
34.846
12.004
13.777
7.675
1.243
2.232
1.158
127.644
05-03-15
965
2.822
4.893
2.743
2.697
12.108
28.948
35.075
12.005
13.824
7.674
1.282
2.235
1.134
128.404
06-03-15
957
2.770
4.385
2.743
2.425
12.204
29.364
35.204
12.002
13.317
7.670
1.277
2.236
1.135
127.688
07-03-15
960
2.785
4.875
2.714
2.687
12.203
29.458
35.083
12.004
13.307
7.660
1.286
2.236
1.153
128.411
08-03-15
961
2.787
4.865
2.703
2.695
12.004
28.504
34.642
11.996
13.359
7.610
1.281
2.236
1.153
126.796
09-03-15
961
2.802
4.862
2.678
2.567
12.180
29.665
34.203
11.978
13.270
7.610
1.272
2.234
1.141
127.424
10-03-15
958
2.812
4.812
2.680
2.591
12.100
29.373
34.524
11.968
13.408
7.610
1.277
2.235
1.143
127.491
11-03-15
956
2.815
4.821
2.622
2.610
11.706
29.019
33.306
11.959
13.344
7.590
1.302
2.231
1.076
125.357
12-03-15
953
2.806
4.817
2.647
2.613
11.652
29.464
32.887
11.955
13.302
7.510
1.301
2.237
1.104
125.249
13-03-15
952
2.793
4.795
2.553
2.336
11.656
29.609
32.775
11.956
13.289
7.501
1.296
2.230
1.118
124.860
14-03-15
948
2.858
4.783
2.553
2.484
11.602
29.705
32.644
11.928
13.353
7.501
1.294
2.234
1.072
124.959
15-03-15
949
2.806
4.618
2.539
2.223
11.707
29.749
32.801
11.915
13.495
7.501
1.282
2.235
1.077
124.896
16-03-15
951
2.789
4.790
2.410
1.872
11.643
29.759
33.095
11.891
13.381
7.461
1.281
2.236
1.125
124.685
17-03-15
949
2.733
4.797
2.537
2.019
11.559
29.781
33.143
12.148
13.372
7.415
1.279
2.235
1.080
125.046
18-03-15
951
2.755
4.800
2.538
2.013
11.562
29.757
33.240
11.909
13.388
7.381
1.276
2.236
1.009
124.815
19-03-15
951
2.768
4.618
2.569
2.012
11.510
29.654
33.382
11.901
13.371
7.361
1.254
1.800
1.069
124.219
20-03-15
954
2.626
4.810
2.616
1.992
11.423
29.586
33.558
11.898
13.465
7.311
1.019
1.663
1.037
123.957
21-03-15
951
2.749
4.806
2.601
1.979
11.403
29.314
33.484
11.882
13.323
7.261
1.054
2.019
1.164
123.990
22-03-15
952
2.648
4.802
2.594
1.726
11.416
29.276
33.503
11.872
13.405
7.240
1.210
2.172
1.116
123.934
23-03-15
955
2.694
4.797
2.587
2.231
11.202
28.396
33.375
11.874
13.457
7.235
1.201
2.237
1.179
123.420
24-03-15
955
2.764
4.654
2.574
1.983
11.106
28.925
33.384
11.627
13.503
7.215
1.244
2.342
1.175
123.451
25-03-15
946
2.844
4.809
2.526
1.981
11.103
28.806
33.375
11.890
13.495
7.215
1.204
2.405
1.108
123.708
26-03-15
935
2.742
4.809
2.575
2.485
11.102
28.815
33.048
11.870
13.429
7.193
1.174
2.436
1.099
123.712
27-03-15
950
2.725
4.811
2.616
2.686
11.106
29.144
32.942
11.876
13.422
7.228
1.182
2.427
1.106
124.221
28-03-15
948
2.803
4.829
2.647
2.680
11.005
28.630
33.085
11.878
13.397
5.157
1.182
2.450
1.126
121.818
29-03-15
942
2.712
4.840
2.623
2.714
11.203
29.098
33.099
11.882
13.406
6.907
1.180
2.508
944
124.057
954
2.773
4.796
2.639
2.380
11.647
29.268
33.719
11.931
13.461
7.372
1.235
2.231
1.108
125.514
PROMEDIO
MARZO 2015
META
803
2.465
4.749
1.820
2.795
12.039
28.707
30.001
11.931
12.317
10.394
1.107
1.009
1.686
121.823
DIFERENCIA
REAL -META
MARZO 2015
151
308
47
819
-415
-392
561
3.718
0
1.144
-3.022
129
1.222
-578
3.691
% DE META
MARZO 2015
118,8%
112,5%
101,0%
145,0%
85,1%
96,7%
102,0%
112,4%
100,0%
109,3%
70,9%
111,6%
221,1%
65,7%
103,0%
30-03-15
31-03-15
PROMEDIO
MARZO 2015
REAL