PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO A NIVEL NACIONAL (BLS) FECHA DE REPORTE: 20 DE ABRIL DE 2015 MES: ABRIL 2015 (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN 01-04-15 02-04-15 03-04-15 04-04-15 05-04-15 06-04-15 07-04-15 08-04-15 09-04-15 10-04-15 11-04-15 12-04-15 13-04-15 14-04-15 15-04-15 16-04-15 17-04-15 18-04-15 19-04-15 TOTAL NACIONAL TOTAL CIAS. PRIVADAS *TOTAL PETROAMAZONAS EP+RIO NAPO 550.470 550.785 551.181 551.002 551.063 550.815 550.400 550.362 550.553 546.184 544.626 546.396 540.252 545.853 546.944 548.446 540.408 545.788 551.167 124.008 123.934 123.887 123.591 123.977 124.054 123.885 123.653 123.727 122.906 123.725 123.429 117.526 122.879 122.874 123.405 124.096 123.386 123.881 426.462 426.851 427.294 427.411 427.086 426.760 426.515 426.710 426.826 423.278 420.901 422.968 422.726 422.974 424.071 425.041 416.313 422.403 427.286 5.379 495 4.884 20-04-15 21-04-15 22-04-15 23-04-15 24-04-15 25-04-15 26-04-15 27-04-15 28-04-15 29-04-15 30-04-15 01-05-15 DIFERENCIA HOY-AYER NOVEDADES: *CIA PETROAMAZONAS EP: Bloque-61.: continúa pozo Culebra-05 apagado por operaciones de SLICK PROMEDIO ABRIL 2015 REAL 548.037 123.306 424.730 PROMEDIO ABRIL 2015 META 582.886 120.775 462.111 DIFERENCIA REAL-META ABRIL 2015 -34.849 2.531 -37.381 % DE META EN ABRIL 2015 94,0% 102,1% 91,9% LINE, Auca Central-158 en operaciones de reacondicionamiento y pozo Rumiyacu-1 presenta declina producción, Bloque-7: Pozo Oso-B76 apagado para pruebas de restauración de presión, Pozos Coca A-57 movilización de taladro, Pozo Oso-1 en evaluación y arranque, Oso-30 con falla mecánica, Bloque-56: continúa pozo Lago Agrio-55 realizando trabajos de pesca, Bloque-57: Área Libertador Pozo Parahuacu-12 problemas eléctricos en isla, Área Shushufindi: continúa pozo Shushufindi-B49 con problemas mecánicos, Bloque-15: 4 pozos apagados con operaciones mecánicas (control de nivel), continúa pozo Limoncocha-L26 evaluando nueva zona de producción, Bloque-31: pozo Apaika-A14 realizando pruebas de restauración de presión, Bloque-12: pozo Pañacocha-A9, B-33 y B-37 con fallas en generación eléctrica (sobre corriente) y pozos Eden Yuturi C-152 y F-97 en movimiento de taladro de reacondicionamiento NOTAS: Se considera 669 bls netos de empaquetamiento del tramo de la línea de flujo Apaika-ECB-EPF (que no ingresa a producción de BLOQUE12 + BLOQUE 31 SEGUN ACTA Nº 002 ARCH-SPAM-BLOQUE 31-2015) . Varios Pozos cerrados que no están en operación. ENAP SIPEC, Pozo Huachito-02 cerrado por una hora por falla ene generador eléctrico. *CIA. REPSOL ECUADOR S.A. , Continúa Generador a crudo GE-3170 E, fuera de servicio para mantenimiento ( 7 Pozos cerrados temporalmente ), 11 pozo cerrados 24 horas esperando reacondicionamiento, pozos: , Iro-A7 y Tivascuno-A1 cerrado temporalmente por falla eléctrica en BES, Daimi-A20 cerrado 24 horas por baja producción, Daimi-B2 cerrado realizando reacondicionamiento. *CIA. PETROBELL, Pozos: Cachiyacu-1 continúa cerrado por problemas con la Comunidad, pozos Tigüino:02-07 cerrado esperando reacondicionamiento. *CIA. PETROORIENTAL S.A., pozos: Hormiguero-31ST1 y Nantu-10 continúan cerrados por bajo por aporte, Hormiguero-08 continúa cerrado esperando reacondicionamiento, Hormiguero-10 y 26 continúan cerrados por falla de equipo BES, pozos Wanke-05-12 cerrado por restricción de producción para control de producción de agua, Nantu-21 coninúa cerrados 24 horas no aporta, Tapir Norte-08 apagado temporalmente por mantenimiento de unidad de bombeo hidraúlico, Tapir Norte-8 cerrado por 8 horas para mantenimiento de unidad de bombeo hidraúlico, Tapir-6 cerrado temporalmente trabajo varios. *CIA. RIO NAPO, Pozos: Sacha-481 cerrado por 2 horas problemas en VSD, Sacha-66 cerrado por 6 horas por cambio de bomba, Sacha-177 cerrado por dos horas por bajapresión de intake (bombas BES)+ cuatro pozos cerrados por reacondicionamiento. CIAS./CONTRATOS *CIA.ORION ENERGY OCANOPB, Pozo: Peña Blanca-2 continúa cerrado por falla mecánica, Peña PRODUCCION ACTUAL Blanca-01 y Ocano-1 continúan cerrado. *CIA. ANDES PETROLEUM ECUADOR LTD., Pozos: Mariann-14,15,16,40,41,43,44, apagados 30 PETROAMAZONAS EP 352.069 minutos por falla en el generador, apagado a las 09H30 por falla en el generador, Chorongo-2, Dorine Norte-1 y 2, continúan apagados por control de produccin de agua. *CIA.CONSORCIO PEGASO, Pozos: Puma- 09 continua cerrado por baja producción, Puma -12 continúa RIO NAPO COMPAÑIAS PRIVADAS 75.217 123.881 cerrado por falla en completación. *CIA. TECPECUADOR S.A., pozos: Bermejo Norte-19, Bermejo Sur-08 , Bermejo Sur-13 y El Rayo-05 continúan cerrados en espera de pulling. *CIA. CONSORCIO PALANDA YUCA SUR, Pozos:LLumpak-2D cerrado por 24 horas para montaje de bomba HPS. TOTAL PETROLEO NETO 551.167 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO PETROAMAZONAS EP Y RIO NAPO (BLS) MES: ABRIL 2015 FECHA DE REPORTE: 20 DE ABRIL DE 2015 COMPARATIVO DIARIO (VOLUMENES PRELIMINARES SUJETOS A REVISION) FECHA DE OPERACIÓN (CERRADO A LAS 06H00) TOTAL PETROAMAZONAS RIO NAPO ESTADO+ EP MIXTAS 01-04-15 351.254 75.208 426.462 02-04-15 03-04-15 04-04-15 05-04-15 06-04-15 07-04-15 08-04-15 09-04-15 10-04-15 11-04-15 12-04-15 13-04-15 14-04-15 15-04-15 351.604 352.090 352.304 352.876 351.738 351.480 351.670 351.758 348.175 345.795 347.797 347.539 347.741 348.819 349.786 341.227 347.293 352.069 75.247 75.204 75.106 74.211 75.022 75.036 75.040 75.067 75.103 75.106 75.170 75.186 75.233 75.251 75.255 75.086 75.109 75.217 16-04-15 17-04-15 18-04-15 19-04-15 20-04-15 21-04-15 22-04-15 23-04-15 24-04-15 25-04-15 26-04-15 27-04-15 28-04-15 29-04-15 30-04-15 01-05-15 COMPAÑIAS ESTADO PETROAMAZONAS EP RÍO NAPO TOTAL ESTADO+ MIXTAS PRODUCCION ACTUAL 352.069 75.217 427.286 426.851 427.294 427.411 427.086 426.760 426.515 426.710 426.826 423.278 420.901 422.968 422.726 422.974 424.071 425.041 416.313 422.403 427.286 PRODUCCION DIARIA DE PETROLEO NETO DE CAMPO COMPAÑIAS PRIVADAS (BLS) MES: ABRIL 2015 FECHA DE OPERACIÓN CAMPO PUMA S.A (CONSORCIO PEGASO) TECPECUADOR CONSORCIO PETROSUD PETRORIVA CONSORCIO PALANDA YUCASUR PETROBELL PETRORIENTAL (BLOQUE 14 Y 17) REPSOL AREA BLOQUE 16 + TIVACUNO ANDES PETROLEUM TARAPOA AGIP OIL ENAP SIPEC GENTE OIL ECUADOR ORION ENERGY OCANOPB S.A. ORIONOIL ER S.A. PACIFPETROL TOTAL COMPAÑIAS PRIVADAS (VOLUMENES PRELIMINARES SUJETOS A REVISION) COMPARATIVO DIARIO 01-04-15 927 2.806 4.862 2.672 2.675 11.049 28.704 33.045 11.847 13.360 7.172 1.150 2.579 1.159 124.008 02-04-15 925 2.752 4.868 2.648 2.648 11.010 29.011 33.047 11.837 13.276 7.172 1.146 2.590 1.003 123.934 03-04-15 923 2.619 4.873 2.670 2.690 11.011 29.017 33.036 11.832 13.248 7.103 1.141 2.597 1.127 123.887 04-04-15 923 2.700 4.877 2.686 2.538 11.023 29.003 33.035 11.830 13.157 7.103 1.140 2.598 978 123.591 05-04-15 919 2.719 4.873 2.810 2.593 11.001 29.046 33.015 11.829 13.241 7.103 1.136 2.618 1.073 123.977 06-04-15 915 2.722 4.865 2.794 2.585 11.024 29.115 33.028 11.834 13.154 7.103 1.134 2.624 1.157 124.054 07-04-15 907 2.734 4.854 2.765 2.587 11.061 29.137 33.015 11.825 13.142 7.102 1.041 2.636 1.081 123.885 08-04-15 903 2.728 4.862 2.822 2.444 10.957 29.118 33.018 11.816 13.086 7.071 1.130 2.648 1.050 123.653 09-04-15 902 2.771 4.856 2.850 2.441 11.050 29.124 33.002 11.801 13.029 7.001 1.128 2.671 1.100 123.727 10-04-15 893 2.789 4.860 2.883 2.536 11.003 28.702 32.639 11.793 13.002 6.941 1.126 2.674 1.066 122.906 11-04-15 891 2.701 4.851 2.894 2.546 11.006 29.156 33.024 11.789 13.048 6.936 1.123 2.693 1.068 123.725 12-04-15 889 2.527 4.846 2.924 2.548 11.004 29.139 32.822 11.795 13.078 6.935 1.122 2.695 1.104 123.429 13-04-15 889 2.572 4.836 2.930 2.486 11.011 23.248 32.935 11.630 13.132 6.935 1.114 2.697 1.111 117.526 14-04-15 882 2.542 4.832 2.861 2.502 11.007 28.431 33.192 11.768 13.083 6.925 1.091 2.683 1.081 122.879 15-04-15 884 2.520 4.832 2.807 2.527 10.925 28.565 33.184 11.745 13.061 6.926 1.086 2.682 1.131 122.874 16-04-15 880 2.681 4.611 2.792 2.543 11.053 29.219 33.056 11.743 13.077 6.927 1.093 2.681 1.048 123.405 17-04-15 882 2.669 4.842 2.900 2.549 11.045 29.462 33.090 11.745 13.091 6.936 1.107 2.687 1.093 124.096 18-04-15 879 2.679 4.847 2.960 2.552 11.020 28.667 33.083 11.718 13.205 6.916 1.122 2.696 1.042 123.386 19-04-15 878 2.620 4.851 2.978 2.554 11.004 29.142 33.043 11.731 13.195 6.914 1.119 2.712 1.139 123.881 900 2.676 4.842 2.824 2.555 11.014 28.684 33.016 11.785 13.140 7.012 1.118 2.656 1.085 123.306 PROMEDIO ABRIL 2015 META 787 2.392 4.660 1.790 2.755 11.821 28.512 29.643 11.839 12.174 10.273 1.097 1.349 1.682 120.775 DIFERENCIA REAL -META ABRIL 2015 113 284 182 1.034 -200 -807 172 3.373 -54 966 -3.261 21 1.306 -597 2.531 % DE META ABRIL 2015 114,3% 111,9% 103,9% 157,7% 92,7% 93,2% 100,6% 111,4% 99,5% 107,9% 68,3% 101,9% 196,8% 64,5% 102,1% 20-04-15 21-04-15 22-04-15 23-04-15 24-04-15 25-04-15 26-04-15 27-04-15 28-04-15 29-04-15 30-04-15 01-05-15 PROMEDIO ABRIL 2015 REAL
© Copyright 2024 ExpyDoc