Interconnection between Žerjavinec (HR)/Heviz (HU) and Cirkovce (SI)

Interconnection between Žerjavinec (HR)/Heviz (HU) and Cirkovce (SI)
Priority corridor under Regulation (EU) 347/2013:
North-South electricity interconnections in Central Eastern and South Eastern Europe ('NSI
East Electricity')
Information on the project promoters
Type of information
Available options* / Defined Format
Company
ELES d.o.o.
Type of company
TSO
E-mail address
[email protected]
Telephone number
+386 1 474 3000
General Information
Type of information
Available options / Defined Format
Electricity
Transmission line
Substation
Phase-shift Transformer
Storage
Type of project
Smart Grids deployment
New
Upgrade
Extension
Replacement
Status
Permitting
Project included in the 2014 TYNDP
Yes
Project included on the list of Projects of
common interest (PCI)
Yes (project no. 3.9.1)
Location of the project (country, region,
From SS Cirkovce (SI) (substation
closest city) and graphical representation
included in the project) to the state border
on the map
with Hungary.
Expected costs
102,5 mio €
1
(costs of new SS Cirkovce 400 kV
included)
Name of the sponsors and their shares
Link to the project website
ELES 100%
http://www.eles.si/dv-2x400-kv-cirkovce--pince.aspx
Technical information
Type of information
Available options / Defined Format
For transmission line projects
Line type
OHL
Length of the line
Approximately 80 km
From … to …
SS Cirkovce to Pince
Transmission capacity (MW)
2 x 1.330 MW
Voltage (kV)
400 kV
Current (DC / AC)
AC 2 x 1.920 A
Time Schedule
Type of information
Defined Format
Probable date of commissioning and the

National Spatial Plan: 2012
main milestones

Commissioning: 2016
Please tick the box below to indicate the status of the project:
Pre-feasibility studies
Feasibility studies
FID
Permitting
x
Construction
General Criteria
Type of information
Detailed description
Name of the corridor
Cirkovce-Pince
The project is the first interconnection line
Main objectives of the project (necessary
between Slovenia and Hungary and will
for the priority corridor)
have a significant international importance
in the context of building a common pan2
European grid and increase cross-border
transmission capacity with Hungary. This
will allow for Slovenia, Italy and
surrounding countries access to electricity
from the East and to improve reliability,
important in case of failure of major
production units or other unexpected
events.
If transmission, does the project have a
YES
significant impact on cross-border
transmission capacity between two or
more Member-States?
The project will have a significant impact
on GTC values on Slovenia-Hungary
border.
Specific Criteria
Type of information
Available options / Defined format
Market integration, interoperability and system flexibility
Does the project contribute to the
integration of market areas or to eliminate
the isolation of least 1 Member State from
the Internal Energy Market? How and
New interconnection line will allow higher
market integration in the region.
which ones?
What additional value does the project
RES integration, it will potentially
provide to the overall flexibility of the
decrease CO2 emissions and losses and
system (including capacity of reverse
increase energy transfer through
flow)?
Slovenian transmission network.
The project will open Slovenia and
Hungary to the possibility of accessing
How is this market integration expected to energy markets in the East. It will also
impact the market in other TSO areas
open the possibility for Italy and
(state the affected areas)?
surrounding countries to import additional
energy from the East which includes
tertiary energy reserve.
Competition
3
New line will open up opportunities for
Slovenia, Italy and surrounding countries
in the region to access other markets and
import electricity from the East. The
What is the impact of the project on the
project will improve reliability (in case of
competition in the electricity market?
failure of major production units or other
unexpected events), potentially reduce
losses, security of supply and increase
energy transfer through Slovenian
transmission network.
Describe the expected timeframe over
which any contribution to competition in
the internal energy market is likely to be
Long term
realised
Security of supply
New line will open Slovenia to the
How does the project impact the short
possibility to access the new energy
term and long term resilience in the
market in the East. It also opens the
system?
possibility for purchasing tertiary energy
from the East and vice versa.
Does the project provide additional
capacity in relation to national and
regional N-1? For the benefit of which
countries/regions?
The project will improve reliability (in case
of failure of major production units or other
unexpected events)
Sustainability
Does the project support one or several of
the listed objectives of sustainability

RES integration,

decrease of CO2 emissions
decrease of losses
4