Bruce Hwy – Sandy Corner to Collinsons Lagoon (Ayr) Civil Construction of approximately 5km of Bruce Highway on a new alignment in the area Southwest of Ayr (QLD), heading northwards, including an overpass bridge and abutments over a local road and rail (two span bridge), major rock fill across difficult terrain (wetlands), passing lane and new facilities for a rest area at the Sandy Corner rest stop. Decmil Engineering will carry out the construction works consisting of: ◻◻ 160,000m3 earthworks for a ◻◻ ◻◻ ◻◻ ◻◻ preload embankment on 2m thick rock blanket with a five month settlement period. 2 multicell culverts (50m and 90m wide approx.) and other culvert/ concrete drainage. Cane rail/road overpass with 7m high embankment approaches. Cement modified pavement, bitumen sealing and associated road furniture works. Traffic management. ◻◻ Intensive environmental and cultural heritage monitoring and management. ◻◻ Project management works. A feature of the project is the design and construction of the rail overpass over the cane rail track that services Wilmar’s Brandon sugar mill. It demonstrates Decmil Engineering’s capability to economically and expeditiously deliver a project using smart engineering solutions from our in-house design and construction team. Decmil Engineering ABN 25 073 103 107 is a wholly owned subsidiary of Decmil Australia Pty Ltd CLIENT Department of Transport and Main Roads LOCATION Brandon (near Ayr), North QLD CONTRACT VALUE $34 Million START DATE September 2012 COMPLETION June 2014
© Copyright 2024 ExpyDoc