Instructions to Authors & LIST OF PAPERS FOR IPWE SEMINAR Jan-2015 INSTRUCTION TO AUTHORS 1.All authors are requested to submit their PowerPoint Presentation which should not be more than 10-12 slides including Opening & 'thanks' slide. 2.The Font size should not be less than 28 at any description on the slide. 3.Use of animations should be avoided & if unavoidable, should be kept to minimum as time for each presentation will be limited to 10 minutes. 4. Efforts are being made to accommodate presentations of as many papers as possible and therefore smaller presentations will get preference over bigger presentations. 5. The presentations must be sent by E-Mail to [email protected] by 17:00 hrs on 19.01.2015. 6. Presentations sent on or before 17.00 hrs on 19/01/2015 shall only be considered for physical delivery at seminar. 1. Rail/weld management - Quality & Reliability Sr. No. Topic of Paper 1.1 Rail/Weld failures: A Proactive & Commonsense Approach Vipul Kumar,Executive Director,Track-II,RDSO RAIL / WELD MANAGEMENT: RAIL/WELD FRACTURES DETECTTION BY “CONTINUOUS STRAIN SIGNATURE RECORDING USING FBG SYSTEM” ANURAG KUMAR, DEN/EAST/ VADODARA 1.2 Name of Author & Designation Rail way RDSO WR 1.3 Paradigm Shift for Prevention of Rail/Weld failures 1.3(A) Improvement in Quality and Reliability of Rails and Flash Butt Welds 1.4 1.5 1.6 1.7 1.8 1.9 N.K.Garg, CAO(Con)-II/E Rly Anirudh Kaushal, Dy CE/TM/WR Indraj Singh Rajput AEN/TM/WR M.Badruddin,SSE/CCG S.K.Pandey,Executive Director/TrackI/RDSO,Lucknow, Sanjay Sahu,Director/TrackI/RDSO,Lucknow, D.S.TomarAssistant Design Engineer/Track/RF/RDSO, Lucknow RAIL / WELD MANAGEMENT THROUGH INDUCTION RAIL HEATING Rahul Jaipuria, DEN/Central/Jabalpur Improving Reliability of A.T. welds: Corrective and Preventive Measures Satish Kumar Pandey, Executive Director/TrackI/RDSO A.K.Sharma, ADE/Track/RDSO Srinivas.Malladi, IRSE Sr Den/Central, Vijayawada, SC Rly RAIL/WELD FAILURES REDUCTION MANAGEMENT MADE EASY RAIL/WELD MANAGEMENT: AN INTEGRATED APPROACH FOR BETTER QUALITY AND RELIABILITY K.R.Chaudhary SrDEN/Co/ALD, S.K.Gupta SrDEN/II/ALD, Ajay Singh DEN/Track/ALD RAIL / WELD MANAGEMENT Role of QUALITY AND RELIABILITY B. Krishna Reddy and K.Srinivas RAIL / WELD MANAGEMENT -QUALITY AND RELIABILITY B.K.Singh, Sr.DEN/II/Dhanbad, EC Rly ER,WR RDSO WCR RDSO SCR NCR SCR ECR 1.10 1.11 RAIL / WELD MANAGEMENT - QUALITY AND RELIABILITY Pawan Kumar, Sr.DEN/I/MGS E C Rly MANAGEREAL AND TECHNOLOGICAL SOLUTIONS FOR PREVENTION OF RAIL/WELD FAILURES Sri. P.V.N.Naidu, Principal/ DCETC&TWTC/vijayawada G.Kiran Babu, JE/P.Way/ Instrcutor/ DCETC/vijayawada ECR SCR 2. Increase of speed on the existing Indian Railway routes Sr. No. Title of Paper Name of Author & Designation INCREASE OF SPEED ON THE EXISTING RAILWAY ROUTES A CASE STUDY ON INTRODUCTION OF 160 KMPH TRAINS IN PALWAL-AGRA SECTION OF N. C. RAILWAY High Speed Train On Existing Upgraded Track Satish Kumar PCE/NCR S.K.Srivastava Dy.CE/TP/NCR 2.3 Reduced journey time for speed up operation J.S. Mundrey 2.4 Improvement of existing formation to make it fit for Semi high speed track Vinayak Pandey DEN South RTM Factors Influencing Speed Increase on Existing Railway Track Increasing Speed on the Existing Indian Railway Routes T.V. MAHAGANAPATHY, AXEN/CS/BQI/SR 2.1 2.2 2.5 2.6 Railway NCR Anish Kumar, Chief Project Manager/Track, IRCON/Malaysia IRCON WR SR P.S.N. Seshu ADEN/Dhone SCR 3. Metro system-Design, standards, construction & maintenance Sr. No. 3.1 3.2 3.3 3.4 3.5 3.6 Title of Paper Alignment design of Metro Corridors Name of Author & Designation Sanjay Srivastava General Manager (Civil) RITES Ltd. Sector 29 Gurgaon India-122001 A P Sharma Senior Deputy General Manager (Civil) RITES Ltd. Sector 29 Gurgaon India-122001 Fundamentals of Transit Noise and Vibrations – An Introduction Vipul Kumar, Executive Director/Track-II, RDSO LAUNCHING SYSTEMS OF PSC SEGMENTAL GIRDERS ADOPTED IN BANGALORE METRO RAIL PROJECT An insight into the Design principles of Direct Fixation Fastening system for Ballastless Track B. S. Sudhir Chandra Former Director (Project & Planning/BMRCL) Former Member, Railway Board Design of the Bangalore Metro Rail viaducts and Stations P.Shameer Basha IRSE, Structural Expert General Consultants to BMRC “Metro Systems Design, Standard, Construction and Maintenance." METRO SYSTEM – DESIGN CRITERIA OF ‘LRT’ K.L.V.S.VISWANADHAM ASST. MANAGER (CIVIL) RAIL VIKAS NIGAM LIMITED SECUNDERABAD S.P.Iyer Track Alignment Expert/GC(RITES India) for Bangalore Metro and Retd CAO/Construction/ Southern Railway Railway RITES RDSO BMRCL RITES BMRCL RVNL 3.7 3.8 Launching of Largest Devendra Ramtekkar segmental span In Chief Engineer/ BMRCL Bangalore Metro Rail Project (Obligatory span over ROB across Railway Line) Concepts involved in the Suriyamoorthy.V,ADEN/ Design of Chennai Metro VM/SR & Praveena.M, Tunnel ADEN/TJ/SR) BMRCL SR METRO VIADUCT SEGMENTAL CONSTRUCTION – CASTING YARD OPERATIONS K. Ramakrishna, IRSE, GM/RITES, Bengaluru. M.S. Dhananjaya Murthy, DGM (Civil) / RITES, Bengaluru. RITES Noise and Vibration – Regulation and Control in Track design in Metro Rail Systems. S.P.Iyer Track Alignment Expert/GC(RITES India) for Bangalore Metro and Retd CAO/Construction/ Southern Railway RITES 3.11 METRO SYSTEM CONSTRUCTION K.Srinivas Principal/ZCETI/ Kacheguda 3.12 MAINTENANCE OF BALLAST LESS TRACKS IN METRO RAILWAYS (an emphasis on Hyderabad Metro ) Design, Standard, Planning and Implementation of JokaMajerhat Metro Section in view of the requirement of MRTS in Kolkata K.Srinivas Principal/ZCETI/ Kacheguda 3.9 3.10 3.13 SCR SCR Rajesh Prasad Chief Project Manager Rail Vikas Nigam Limited RVNL 4. Miscellaneous Sr. No. Title of Paper Name of Author & Designation Railway 4.1 4.2 4.3 4.4 4.5 4.6 4.7 Long Welded Rails on Ballasted Deck Bridges – Issues Involved, And work being done on Indian Railways in this respect Generating Data for Design tamping on curves under 3 point Lining System. SELF SUPPORTED CURVED METAL ROOFING SYSTEMS PSC GIRDER BEARINGSINSTALLATION AND MAINTANANCE ADOPTED IN BANGALORE METRO RAIL PROJECT Platinum Rated Green Building-Lessons learnt IMPROVING RAIL / WELD MANAGEMENT QUALITY AND RELIABILITY:- BY IMPROOVING TRAINING EFFIGICY FOR DETECTION AND REPRESENTING OF RAIL/WELD FLAW BY INTERACTIVE MODULE OF FLAW DETECTION CONCEPTS AND TRADEOFFS OF FAST-TRACK CONSTRUCTION V B Sood, Director/B & S/SBII/RDSO RDSO M.S.Ekbote, Retd.AM(CE) MK Gupta, CAO/C, C.Rly AK Agrawal, CE/C/MTP, C. Rly Paramjeet Singh DY CE/C, C. Rly R. Arun kumar Dy. General Manager/RITES Ltd Bangalore Metro Rail Project S.K.Garg, Sr.Prof/Works IRICEN, Suresh Pakhare, Prof.Tr-2, IRICEN N.C.Sharda, Dean,IRICEN, J.M.Patekari, Asstt.Prof. IRICEN, A A Nizami, SI/Comp, IRICEN. CR RITES IRICEN IRICEN Kaushal Kishore, CE/TP/WCR & J.N. Verma, Dy. CE/G/WCR WCR
© Copyright 2024 ExpyDoc