INSTRUCTION TO AUTHORS - iricen

Instructions to Authors
&
LIST OF PAPERS FOR IPWE SEMINAR Jan-2015
INSTRUCTION TO AUTHORS
1.All authors are requested to submit their PowerPoint Presentation which
should not be more than 10-12 slides including Opening & 'thanks' slide.
2.The Font size should not be less than 28 at any description on the slide.
3.Use of animations should be avoided & if unavoidable, should be kept to
minimum as time for each presentation will be limited to 10 minutes.
4. Efforts are being made to accommodate presentations of as many papers
as possible and therefore smaller presentations will get preference over
bigger presentations.
5. The presentations must be sent by E-Mail to [email protected] by
17:00 hrs on 19.01.2015.
6. Presentations sent on or before 17.00 hrs on 19/01/2015 shall only be
considered for physical delivery at seminar.
1. Rail/weld management - Quality & Reliability
Sr.
No.
Topic of Paper
1.1
Rail/Weld failures: A
Proactive & Commonsense Approach
Vipul Kumar,Executive
Director,Track-II,RDSO
RAIL / WELD
MANAGEMENT:
RAIL/WELD FRACTURES
DETECTTION BY
“CONTINUOUS STRAIN
SIGNATURE RECORDING
USING FBG SYSTEM”
ANURAG KUMAR, DEN/EAST/
VADODARA
1.2
Name of Author &
Designation
Rail way
RDSO
WR
1.3
Paradigm Shift for
Prevention of Rail/Weld
failures
1.3(A) Improvement in Quality
and Reliability of Rails and
Flash Butt Welds
1.4
1.5
1.6
1.7
1.8
1.9
N.K.Garg, CAO(Con)-II/E Rly
Anirudh Kaushal, Dy
CE/TM/WR Indraj Singh
Rajput AEN/TM/WR
M.Badruddin,SSE/CCG
S.K.Pandey,Executive
Director/TrackI/RDSO,Lucknow, Sanjay
Sahu,Director/TrackI/RDSO,Lucknow,
D.S.TomarAssistant Design
Engineer/Track/RF/RDSO,
Lucknow
RAIL / WELD
MANAGEMENT THROUGH
INDUCTION RAIL HEATING
Rahul Jaipuria,
DEN/Central/Jabalpur
Improving Reliability of
A.T. welds: Corrective and
Preventive Measures
Satish Kumar Pandey,
Executive Director/TrackI/RDSO
A.K.Sharma,
ADE/Track/RDSO
Srinivas.Malladi, IRSE
Sr Den/Central, Vijayawada,
SC Rly
RAIL/WELD FAILURES
REDUCTION
MANAGEMENT MADE
EASY
RAIL/WELD
MANAGEMENT: AN
INTEGRATED APPROACH
FOR BETTER QUALITY
AND RELIABILITY
K.R.Chaudhary
SrDEN/Co/ALD, S.K.Gupta
SrDEN/II/ALD, Ajay Singh
DEN/Track/ALD
RAIL / WELD
MANAGEMENT Role of
QUALITY AND RELIABILITY
B. Krishna Reddy and
K.Srinivas
RAIL / WELD
MANAGEMENT -QUALITY
AND RELIABILITY
B.K.Singh,
Sr.DEN/II/Dhanbad, EC Rly
ER,WR
RDSO
WCR
RDSO
SCR
NCR
SCR
ECR
1.10
1.11
RAIL / WELD
MANAGEMENT - QUALITY
AND RELIABILITY
Pawan Kumar, Sr.DEN/I/MGS
E C Rly
MANAGEREAL AND
TECHNOLOGICAL
SOLUTIONS FOR
PREVENTION OF
RAIL/WELD FAILURES
Sri. P.V.N.Naidu, Principal/
DCETC&TWTC/vijayawada
G.Kiran Babu, JE/P.Way/
Instrcutor/
DCETC/vijayawada
ECR
SCR
2. Increase of speed on the existing Indian Railway routes
Sr. No.
Title of Paper
Name of Author &
Designation
INCREASE OF SPEED ON
THE EXISTING RAILWAY
ROUTES
A CASE STUDY ON
INTRODUCTION OF 160
KMPH TRAINS IN
PALWAL-AGRA SECTION
OF N. C. RAILWAY
High Speed Train On
Existing Upgraded Track
Satish Kumar PCE/NCR
S.K.Srivastava Dy.CE/TP/NCR
2.3
Reduced journey time
for speed up operation
J.S. Mundrey
2.4
Improvement of existing
formation to make it fit
for
Semi high speed track
Vinayak Pandey
DEN South RTM
Factors Influencing
Speed Increase on
Existing Railway Track
Increasing Speed on the
Existing Indian Railway
Routes
T.V. MAHAGANAPATHY,
AXEN/CS/BQI/SR
2.1
2.2
2.5
2.6
Railway
NCR
Anish Kumar, Chief Project
Manager/Track,
IRCON/Malaysia
IRCON
WR
SR
P.S.N. Seshu ADEN/Dhone
SCR
3. Metro system-Design, standards, construction & maintenance
Sr. No.
3.1
3.2
3.3
3.4
3.5
3.6
Title of Paper
Alignment design of
Metro Corridors
Name of Author &
Designation
Sanjay Srivastava
General Manager (Civil)
RITES Ltd. Sector 29
Gurgaon India-122001
A P Sharma
Senior Deputy General
Manager (Civil)
RITES Ltd. Sector 29
Gurgaon India-122001
Fundamentals of Transit
Noise and Vibrations –
An Introduction
Vipul Kumar, Executive
Director/Track-II, RDSO
LAUNCHING SYSTEMS
OF PSC SEGMENTAL
GIRDERS
ADOPTED IN
BANGALORE METRO
RAIL PROJECT
An insight into the
Design principles of
Direct Fixation Fastening
system for Ballastless
Track
B. S. Sudhir Chandra
Former Director (Project &
Planning/BMRCL)
Former Member, Railway
Board
Design of the Bangalore
Metro Rail viaducts and
Stations
P.Shameer Basha IRSE,
Structural Expert General
Consultants to BMRC
“Metro Systems Design, Standard,
Construction and
Maintenance."
METRO SYSTEM –
DESIGN CRITERIA OF
‘LRT’
K.L.V.S.VISWANADHAM
ASST. MANAGER (CIVIL)
RAIL VIKAS NIGAM LIMITED
SECUNDERABAD
S.P.Iyer
Track Alignment
Expert/GC(RITES India) for
Bangalore Metro and Retd
CAO/Construction/
Southern Railway
Railway
RITES
RDSO
BMRCL
RITES
BMRCL
RVNL
3.7
3.8
Launching of Largest
Devendra Ramtekkar
segmental span In
Chief Engineer/ BMRCL
Bangalore Metro Rail
Project (Obligatory span
over ROB across Railway
Line)
Concepts involved in the Suriyamoorthy.V,ADEN/
Design of Chennai Metro VM/SR & Praveena.M,
Tunnel
ADEN/TJ/SR)
BMRCL
SR
METRO VIADUCT SEGMENTAL
CONSTRUCTION –
CASTING YARD
OPERATIONS
K. Ramakrishna, IRSE,
GM/RITES, Bengaluru.
M.S. Dhananjaya Murthy,
DGM (Civil) / RITES,
Bengaluru.
RITES
Noise and Vibration –
Regulation and Control
in Track design in Metro
Rail Systems.
S.P.Iyer
Track Alignment
Expert/GC(RITES India) for
Bangalore Metro and Retd
CAO/Construction/
Southern Railway
RITES
3.11
METRO SYSTEM
CONSTRUCTION
K.Srinivas Principal/ZCETI/
Kacheguda
3.12
MAINTENANCE OF
BALLAST LESS TRACKS IN
METRO RAILWAYS
(an emphasis on
Hyderabad Metro )
Design, Standard,
Planning and
Implementation of JokaMajerhat Metro Section
in view of the
requirement of MRTS in
Kolkata
K.Srinivas Principal/ZCETI/
Kacheguda
3.9
3.10
3.13
SCR
SCR
Rajesh Prasad
Chief Project Manager
Rail Vikas Nigam Limited
RVNL
4. Miscellaneous
Sr. No.
Title of Paper
Name of Author &
Designation
Railway
4.1
4.2
4.3
4.4
4.5
4.6
4.7
Long Welded Rails on
Ballasted Deck Bridges –
Issues Involved, And
work being done on
Indian Railways in this
respect
Generating Data for
Design tamping on
curves under 3 point
Lining System.
SELF SUPPORTED
CURVED METAL
ROOFING SYSTEMS
PSC GIRDER BEARINGSINSTALLATION AND
MAINTANANCE
ADOPTED IN
BANGALORE METRO
RAIL PROJECT
Platinum Rated Green
Building-Lessons learnt
IMPROVING RAIL /
WELD MANAGEMENT
QUALITY AND
RELIABILITY:- BY
IMPROOVING TRAINING
EFFIGICY FOR
DETECTION AND
REPRESENTING OF
RAIL/WELD FLAW BY
INTERACTIVE MODULE
OF FLAW DETECTION
CONCEPTS AND TRADEOFFS OF FAST-TRACK
CONSTRUCTION
V B Sood, Director/B & S/SBII/RDSO
RDSO
M.S.Ekbote, Retd.AM(CE)
MK Gupta, CAO/C, C.Rly
AK Agrawal, CE/C/MTP, C. Rly
Paramjeet Singh DY CE/C, C. Rly
R. Arun kumar
Dy. General Manager/RITES
Ltd
Bangalore Metro Rail Project
S.K.Garg, Sr.Prof/Works
IRICEN,
Suresh Pakhare, Prof.Tr-2,
IRICEN
N.C.Sharda, Dean,IRICEN,
J.M.Patekari, Asstt.Prof.
IRICEN, A A Nizami, SI/Comp,
IRICEN.
CR
RITES
IRICEN
IRICEN
Kaushal Kishore, CE/TP/WCR
& J.N. Verma, Dy. CE/G/WCR
WCR