Op t i m a l Accessible K e VIN SU TTO N O PE R AT IO NS m ana g er Kevin joined Magellan in 2011 after six years working on largescale high-rise and mixed-use projects around the world. He brings a strong passion for working on complex projects and producing simple and elegant solutions. His graduate educational background in Proactive construction and business informs his entire decision-making process during the course of a project. He has developed a strong proficiency for the entitlement, construction documentation, and construction administration phases. Kevin takes tremendous pride in producing quality and accurate documents that result in a built structure that is financially feasible and functionally successful. Clients love and value him because he is always one step ahead. His ability to work with a • Licensed Architect • MBA, University of Denver • MS, Real Estate & Construction Management, University of Denver • BA, University of Arizona multitude of individuals helps turn grand ideas into a physical reality, generating satisfied clients and long-lasting relationships. Representati v e P roj e c ts Impact Family Village — Seattle, WA City of Bellevue Light Rail Analysis — Bellevue, WA Project Architect and Project Manager. 4-story market Project Architect. Conducted analysis of proposed rate apartment building containing 100 units and two light rail routs to evaluate impacts existing city parking levels of below grade parking (97,600 GSF). facilities. Utilized REVIT to analyze the project in 3D and Bellevue Towers — Bellevue, WA Project Architect. 43-story twin condominium towers determine the viability of the existing garage during and after tunnel construction. over a 6-story mixed use podium. Project contains 540 Naked Pizza — Various Locations in WA units and 20,000 square feet of retail (1,460,000 GSF). Project Manager. Tenant Improvement, developing The Esplanade — Tacoma, WA Job Captain. 9-story condominium containing 176 units a prototype dine-in for an international pizza chain restaurant. with ground floor retail podium and single below grade West Coast Self Storage — Seattle, WA parking level in a brown field site. Project Manager. New Construction. Suning Commercial Plaza Chengdu Safeway Pharmacy — Various Locations in WA — Sichuan, China Project Architect. 42-story mixed-use tower containing 25,000 sm of office and 250 hotel rooms. 10-story retail podium containing large and small tenant retail, movie theaters, ice rink and restaurants. Hiawatha Apartments — Seattle, WA Project Architect and Project Manager. 4-story market rate apartment building containing 100 units and two levels of below grade parking (109,000 GSF). Project Manager. Tenant Improvement. King County North Base — Shoreline, WA Project Manager. Tenant Improvement. Hiawatha Apartments — Seattle, WA Owner’s Representative. Tenant Improvement. Montessori Children’s House — Seattle, WA Project Manager. Tenant Improvement. Microsoft — Various Locations in WA Project Manager. Tenant Improvement.
© Copyright 2024 ExpyDoc