SARL CTCO CHEBLI & TELLAWE TRADING AND CONTRACTING
PROJECTS POSITIONS
SARL CTCO CHEBLI & TELLAWE TRADING AND CONTRACTING
PROJECTS EXPERIENCE
SARL CTCO CHEBLI & TELLAWE TRADING AND CONTRACTING
PROJECTS EXPERIENCE
Feb-2012 to Dec- 2015
Project
Pose d’un Réseau Injection de Gaz sur le champ
de HMD
Client & Contractor
SONATRACH & CTCO
Works Description
Construction of heavy wall Flow lines, 12”, 10” and
6” (32km length), the fabrication and installation
of Manifolds. Trenching, Laying, Welding, NTD,
Coating, Backfilling, Testing and Tie-In.
Project
Algiers Refinery Rehabilitation and Adaptation
Pipeline Works.
Client & Contractor
SONATRACH , TECHNIP & CTCO
Works Description
Construction of 5 underground Pipelines Ø 26”, 16”,
10” and 6”. Trenching, Laying, Welding, NTD,
Coating, Backfilling, Testing and Tie-In.
Project
Construction of Well pads and Access Roads at
KBA,TEG & REG - Algeria
Client & Contractor
BP SONATRACH and STATOIL JV & CTCO
Works Description
Material
Procurement,
Fabrication
and
Construction of Gas Well Heads and Miscellaneous
works such as construction of Personnel camps,
Offices, , Roads and Airport gypsum runways.
Project
Construction of TEG Header and Gathering system
flow lines
Client & Contractor
In Salah Gas / CTCO
Works Description
Trenching, Transportation, Laying, Field Weld, NDT
& Coating, Lowering, CP. Fiber Optic Cable
Installation, Backfilling, Testing & Commissioning of
12”Ø Duplex flow line Header & 6”, 8” Ø Duplex
Flow Lines to various wells (40 K.M Approx).
Dec-2011 to November- 2012
Nov-2010 to Oct - 2013
Dec-2009 to November - 2013
SARL CTCO CHEBLI & TELLAWE TRADING AND CONTRACTING
PROJECTS EXPERIENCE
Sep -2009 to December- 2009
Project
Construction of Underground 8ӯ Duplex flow line
for KB-17 well at KBA
Client & Contractor
In Salah Gas / CTCO
Works Description
Trenching, Transportation, Laying, Field Weld, NDT
& Coating, Lowering, Backfilling, Testing &
Commissioning of 8ӯ Duplex flow line from Main
header to KB-17 well
Project
Civil Works for KRECHBA CPF Expansion - Algeria
Feb-2008 - June-2010
Client
Contractor
&
BP, SONATRACH and STATOIL - JV & PETROFAC /
CTCO as a subcontractor
Works Description
Material Procurement & Construction of Civil works
for KRECHBA CPF Expansion works at In SALAH Gas
Field.
Dec-2008 - Dec-2009
Project
IN SALAH GAS - HMD-BDV Expansion - Algeria
Client & Contractor
BP, SONATRACH and STATOIL - JV & CTCO
Works Description
Material Procurement, Fabrication and Construction
of Gas Well Heads and Miscellaneous works such as
construction of Personnel camps, Offices, Roads and
Airport runways.
Project
OLEODUC LZ2, Ø 24” Pipeline - 530 Km GPL from Hassi
R'mel to Arzew, Algeria)
Client & Contractor
SONATRACH & SAIPEM Contracting ALGERIA / CTCO as a
construction subcontractor
Works Description
Mechanical construction works including Coating of 24"Ø
product Pipeline -210 Km from LAGHOUAT to TIARET,
Algeria
July-2008 - Sep-2009
SARL CTCO CHEBLI & TELLAWE TRADING AND CONTRACTING
PROJECTS EXPERIENCE
2007 - 2010
IN-SALAH GAS - Algeria
Project
Client
Contractor
&
BP, SONATRACH and STATOIL - JV & CTCO
Works Description
Material Procurement, Fabrication and Construction of
Gas Well Heads and Allied camps.
Project
IN-SALAH GAS - Algeria
2006 / 2007
Client
Contractor
&
BP, SONATRACH and STATOIL - JV & PETROFAC / CTCO
as a subcontractor
Works
Description
Material Procurement, Fabrication and Construction of
Gas
Well Heads and Allied camps.
Project
RAS
LAFFAN
WOQOD
FACILITY7623413489
2006 / 2008
Client
Contractor
&
HFO
BUNKERING
QATAR PETROLEUM & Maritime Industrial Services
Co. LTD. INC
Works Description
 02 No of 25000 m3 Product Tanks.
 Export P/L Ø =30’’& 20’’Length= 4.5 km.
 Pumps Station, 03 No. of Loading Arms Installation.
 Loops, Launchers, Receivers along with Export &
Import P/L.
Project
Water Transferring BENI HAROUN, W. MILA - Algeria
2005 / 2006
&
A.N.B , Società italiana per condotte d’acqua s.p.a, &
T.G.C.T.P
Works Description
Water Transferring Pipeline, Ø 2600 mm, Ø 1600 mm, BENI
HAROUN Pumping Station to Barrage OUED ATHMENIA,
MILA City, Algeria .
Client
Contractor
SARL CTCO CHEBLI & TELLAWE TRADING AND CONTRACTING
PROJECTS EXPERIENCE
2005 / 2006
Project
Centre Carburant NAFTAL- AVM D.E.B – Alger Air port
Houari Boumediene - ALGERIA
Client & Contractor
NAFTAL & SECOMOC- BATENCO OUEST
Works Description
Pipeline consists of Ø 16” & Ø 8”, Kerosene Loading
Station and loading nozzle system.
2004 / 2005
Potable Water Distribution Zone Industrial ARZEW –
ORAN, ALGERIA
Project
Client
Contractor
&
Works Description
SONATRACH & BENTINI spa,
Pipeline consist of Ø 30”, Ø 20” length - 26.8 Km &
Pumping Station.
2004 / 2005
Project
MELUT OIL DEVLOPMENT Segment A2 - Sudan
Client & Contractor
PETRODAR & STROYTRANSGAS Intl., OUAIS GROUP
Works Description
Pipeline consists of Ø 32”, Length - 186 Km and
06 BVS, Receiver Station.
2003 / 2005
Project
Client
Contractor
DOG1 BENI MANSOUR- SIDI ARCINE Pipeline, Algeria
&
Works Description
SONATRACH, Brown & Root – Condor.
Pipeline consist of Ø 20” Length - 90 Km.
SARL CTCO CHEBLI & TELLAWE TRADING AND CONTRACTING
PROJECTS EXPERIENCE
2002 / 2003
Project
LEODUC OZ2, Ø 34” Pipeline, 418.5 Km – Batch
01.
( PC 01 – H.E.H )To (PC05 - LAGHOUAT) – Algeria.
Client & Contractor
SONATRACH, BRC, COSIDER.
Works Description
Construction of 13 Block Valve Stations, (Launcher &
Receiver), 5 Cut Stations & 04 Injection Points.
2002 / 2003
Project
OLEODUC OZ2, Ø 34” Pipeline, 405 Km – Batch 02.
(PC05 - LAGHOUAT)To (ARZEW Terminal) Algeria.
Client & Contractor
SONATRACH & STROYTRANSGAS.
Works Description
Pipeline consist of 137 Km Ø 34”, 06 Block Valve
Station
& ARZEW Terminal.
2001 / 2003
Project
Client
Contractor
Works
Description
CSDGL TABYIEH Gas Plant, Syria.
&
CONOCO Philips (CSDGL), KVAERNER, MIS
& OUAIS Group
: Construction of,
18” 246 km Transport Gas Pipeline
100 km, flow lines from 8” To 26”
68 km 10" high pressure flow lines between Gas Plant
and wellheads, chemical injection skids.
02 Compressor Stations
Gathering Station at JAFRA, QAHAR
LPG Railway Loading stations.
Condensate & fire water storage Tank.
SARL CTCO CHEBLI & TELLAWE TRADING AND CONTRACTING