PL-K-REC-11-021-14-034 Ft Hood – 19th Street Mini-Mall Image Upgrade 1. Who is the required roofer? Response: Required roofer name will be issued with amendment #3. 2. Who furnishes the hoods for DD? Response: Hoods are GC furnished and installed. 3. Do we install a new RPZ black flow preventer in the mechanical room? Response: No 4. Is the kitchen sinks provided by the owner? Response: GC furnished, GC installed 5. Is there any kitchen gas equipment being installed? Response: No 6. Is saw cutting during normal working hours or after hours? Response: After hours 7. What extent do we clean the metal ceiling grid? Response: Clean to like-new condition 8. Will the retail area in Phase I and Phase 2 be closed during construction at the same time? Due to the ceiling work. Response: No 9. The drawings reference a signage contractor, what is the name of the signage company? Response: AAFES will have an Express signage vendor, and a Duncan Donuts signage vendor. 10. Who is the owner referring to in the drawings? Response: In the drawings, the name “owner” references “AAFES or THE EXCHANGE.” 11. What is the name of the company providing the millwork? Response: AAFES furnished, contractor installed 12. Can as-builts be provided if needed? Response: Original construction drawings and remodel drawings are available. There are no as-builts available. 13. Is there any testing and balancing for the HVAC? Amendment #2 Attachment #2 PL-K-REC-11-021-14-034 Response: GC to provide testing and balancing. 14. Reference sheet A1B, Is there a space designated for a construction container and dumpster? Response: Coordinate container and dumpster location with store manager. 15. On form 4450-024, page 3, the solicitation document indicates remodel to barber shop but that is not consistent with the drawings or specifications. Response: Barber shop is not in scope for this project. 16. Reference sheet A.0., note 14, is the roof under existing warranty? Response: This question will be answered in amendment #3. 17. Aside from the base approved roof contractor and owner fixture contractor are there any other recommended or required subcontractors? Response: No recommended subcontractors. 18. Are any architectural structural sheets available for this project? Response: Original construction drawings are available. 19. Reference sheet A3A, owner supplied/vendor equipment schedule. Does proposal pricing include vendor equipment furnish/install or just GC supervision coordination? Response: GC to make final electrical/water/drainage connections on all equipment in addition to supervision/coordination. Amendment #2 Attachment #2
© Copyright 2024 ExpyDoc