LARGE VALVE REPLACEMENTS PROJECT ALABAMA AVENUE SE AND PENNSYLVANIA AVENUE SE OVERVIEW DC Water is replacing valves at various locations throughout the city as part of its Capital Improvement Program to improve the water system infrastructure. These efforts will improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system. SCOPE OF WORK Construction for this project will primarily include replacement of the large valve at Alabama Avenue SE and Pennsylvania Avenue SE. SCHEDULE Estimated construction start: March 2015 Estimated construction completion: May 2015 Normal work hours: 9:30am – 3:30pm, Monday through Friday Contractor may work at night or on weekends, dependent upon specific construction activities or due to impactful inclement weather IMPORTANT INFORMATION If a planned temporary water service shut-off is necessary, affected residents will be notified 48 hours in advance. Unless otherwise requested or required, contractor shall not work between the rush hours of 7:00 a.m. – 9:30 a.m. and 3:30 p.m. – 6:30 p.m., Monday through Friday, along major thoroughfares and collector streets. Construction may cause temporary discolored water or low water pressure. If you experience discolored water, flush cold water taps for 15 minutes. If water does not clear, contact the DC Water Drinking Water Division or 24-Hour Emergency/Command Center. TRAFFIC PLANS At various times during construction, “No Parking” signs may need to be placed in certain areas in and around the job site. Notifications regarding “No Parking” zones will be posted 72 hours prior to construction, as required by the District Department of Transportation (DDOT). PARTNERS DC Water is currently working closely with DDOT to ensure minimal disruption during this project. Regular updates will be provided to affected Advisory Neighborhood Commissions. FOR MORE INFORMATION, PLEASE CONTACT: DC Water Project Manager: Maria Gigova (202) 787-7621 DC Water Project Contractor: Flippo Construction Company, Inc. – Joe Marchio (301) 967-6800 DC Water 24 hour Emergency/Command Center: (202) 612-3400 DC Water Drinking Water Division: (202) 612-3440 DC Water Office of External Affairs: (202) 787-2200 Email: [email protected] LARGE VALVE REPLACEMENTS PROJECT ALABAMA AVENUE SE AND PENNSYLVANIA AVENUE SE WARD 7B LEGEND Project Construction Area Large Valve Replacement Location FOR MORE INFORMATION, PLEASE CONTACT: DC Water Project Manager: Maria Gigova (202) 787-7621 DC Water Project Contractor: Flippo Construction Company, Inc. – Joe Marchio (301) 967-6800 DC Water 24 hour Emergency/Command Center: (202) 612-3400 DC Water Drinking Water Division: (202) 612-3440 DC Water Office of External Affairs: (202) 787-2200 Email: [email protected]
© Copyright 2024 ExpyDoc