M c D ermott | P roject E xperience KIPPER TUNA TURRUM PROJECT Conventional Field Development SERVICES: EPCI, transportation, hook-up and commissioning FACILITIES: Jackets, piles, topsides, subsea facilities, pipelines, umbilicals LOCATION: Bass Strait, Victoria, Australia WATER DEPTH: Up to 328 feet McDERMOTT YARDS Batam Island, Indonesia VESSELS DB30, Emerald Sea Kipper Tuna Turrum Project Esso Australia Resources Pty. Ltd. Located off the coast of Victoria in Bass Strait, Kipper Tuna Turrum is one of the largest domestic gas developments on Australia’s eastern seaboard and holds enough energy to power a city of a million people for 35 years. McDermott was the primary contractor for the combined award of the Kipper Tuna Gas Project and Turrum Phase 2 Development Project. Kipper field holds approximately 620 billion cubic feet of recoverable gas and 30 million barrels of condensate/LPG. McDermott installed subsea facilities tied back to the existing West Tuna platform, including two subsea wells, four coolers and a manifold. The produced gas and condensate was transported via a new looped pipeline laid on the seabed to a Riser Access Tower connected by bridge to West Tuna. Turrum field holds approximately 1 trillion cubic feet of gas and 110 million barrels of oil and gas liquids. McDermott connected the first platform installed in Bass Strait in over a decade, Marlin B, to the existing Marlin A platform by bridge. The platform will process additional oil production and gas, which will be piped back to existing facilities at Longford. • Engineering: McDermott performed detailed design and engineering out of Singapore for the Marlin B platform, the West Tuna Riser Access Tower, interconnecting bridges, subsea systems and platform-to-platform pipelines. • Procurement: Equipment and materials associated with construction were procured by McDermott. • Construction: The complete Marlin B platform with interconnecting bridge to the existing Marlin A platform; Riser Access Tower and interconnecting bridge to the existing West Tuna platform, some 22,140 ST of facilities in total, were all fabricated at Batam Island fabrication facility. • Installation: McDermott successfully installed more than 42 miles of pipe with zero weld repairs between West Tuna and the new Marlin B Platform and from Marlin B to the Snapper Platform. McDermott also installed the Kipper subsea facilities, with umbilicals tied back to West Tuna Platform and connected all subsea pipelines to their host facilities. The installation of Marlin B platform and the Riser Access Tower at West Tuna included hook-up and commissioning. For more information about this project, e-mail: [email protected] 140116—19 | Imperial © 2014 McDermott International, Inc. All Rights Reserved The information contained herein is provided for general information purposes only and is not intended or to be construed as a warranty, an offer, or any representation of contractual or other legal responsibility. McDermott has a policy of continuous improvement of its products and services and reserves the right to change information including specifications and processes without notice.
© Copyright 2024 ExpyDoc