Project Profile Compression Reconfiguration Project: Advantage Energy - Bantry Compressor Station The Situation: Declining field pressures resulted in a large rental package now being grossly oversized for the application resulting in reduced Netback for the site. In addition, there was an existing installed unit just sitting idle not being utilized for production. Objectives: To continue operating within ERCB license To avoid moving units To minimize installation costs To improve asset utilization To lower operating costs thru reduced O&M and fuel gas costs To meet production requirements Alternatives considered Status quo was considered but not an option given the declining field production Returning the oversized rental package and either purchasing or re-renting a smaller horsepower package but still had the under utilized idle package to contend with. Could redeploy the idle package to another application but what about the current situation? We could reconfigure the existing idle package and return the rental unit NGC Proposal: NGC conducted a site audit to ensure a comprehensive understanding of what was required, what will work, and where savings can be identified. Project scope to convert the idle Waukesha 2895 GSI Ariel JGR4 607 HP package from two stage to three stage and provide a new 11.5 & rebuilt 11.5 first stage cylinders, using the existing 7.375 and 4.25 for second and third stages respectively. NGC provided a comprehensive, all inclusive, 100% firm price proposal including project schedule. New incremental gas production after the reconfiguration will be 1.66 mmscfd and at $4.00/mcf project pay back would be roughly 49 days resulting in a annualized ROI (based on 97% utilization) of 716%. Compression Solutions Made Easy Project Profile . Awarding the Project Evaluated competitive proposals and alternatives Determined reconfiguring idle unit was best solution Work with an experienced supplier who could meet our needs Selected NGC proposal based on our confidence in their ability to execute the project on time & on budget Engineering & Project Management NGC conducted a site evaluation further detailing scope, verifying measurements, and finalizing project plan. Designed all spools & vessels maximize the amount of prebuilding which would subsequently minimize the field schedule. Fabrication Pre-fabricated all spools & vessels in the NGC pressure shop and then shipped to site on time Field Installation NGC dedicated field retro-fit crew with fully equipped mobile workshop to install pre-fabricated spools, vessels, hang new/rebuilt cylinders, relocate existing cylinder s, and installed new cooler sections. Field Service In addition to the compressor reconfiguration, NGC Field Service technicians completed engine overhaul and final start up of the entire reconfigured package. Customer Perspective NGC made it Easy for me by completing the project on schedule and on budget I would not hesitate to use NGC in the future and would highly recommend NGC to anyone considering a reconfiguration project . Dennis Vaughn, Senior Facilities Engineer at Advantage Energy. Phone: We make it Easy to get the most from your Natural Gas Compression E-mail: Web: 403.274.6106 800.256.1598 [email protected] www.ngc-ltd.com
© Copyright 2024 ExpyDoc