Schedule of Quantities (NFL/NGL/C/456/2013)
Name : Reconditioning of roads in Factory Area during the year 2014-15
S.No.
Description of Items
Unit
Qty.
in Figures
1
2
3
Earth work in excavation in foundation trenches or drains Cu.m.
(not exceeding 1.5 m in width or 10 sqm. on
plan)including dressing of sides and ramming of
bottoms,lift upto 1.5m including getting out the excavated
soil and disposal of surplus excavated soil as directed,
within a lead of 50m, All kinds of soil.
Surface dressing of the ground including removing 100
vegetation and in-equalities not exceeding 15cm deep and Sq.m.
disposal of rubbish lead upto 50m and lift upto 1.5m, all
kinds of soil.
Preparation and consolidation of sub grade with power M2
road roller of 8 to 12 tonne capacity after excavating earth
to an average of 22.5 cm depth, dressing to camber and
consolidating with road roller including making good the
undulations etc. and re-rolling the sub grade and disposal
of surplus earth with lead upto 50 metres.
Quoted Rate
in Words
Amount
(In Rs.)
80.00
300.00
500.00
4
Supplying and stacking at site, 63 mm to 45 mm size Cu.m.
stone aggregate
80.00
5
Laying, spreading and compacting stone aggregate of Cu.m.
specified sizes to WBM specifications in uniform
thickness, hand picking, rolling with 3 wheeled road /
vibratory roller 8-10 tonne capacity in stages to proper
grade and camber, applying and brooming requisite type
of screening / binding material to fill up interstices of
coarse aggregate, watering and compacting to the required
density .
80.00
C:\Users\admin\Documents\Civil Engg. Deptt -BSL\Contractor Record\2012-13 from 447 to onwards\456 New Road\New\SOQ (456)
1/4
S.No.
Description of Items
Unit
Qty.
in Figures
6
Providing, laying, spreading and compacting graded stone Cu.m.
aggregate (size range 53 mm to 0.075 mm ) to wet mix
macadam (WMM) specification including premixing the
material with water at OMC in mechanical mix plant,
carriage of mixed material by tipper to site, for all leads &
lifts, laying in uniform layers with mechanical paver
finisher in sub- base / base course on well prepared
surface and compacting with vibratory roller of 8 to 10
tonne capacity to achieve the desired density, complete as
per pecifications and directions of Engineer-in-Charge.
7
Providing and applying tack coat using hot straight run
bitumen of grade VG - 10, including heating the bitumen,
spraying the bitumen with mechanically operated spray
unit fitted on bitumen boiler, cleaning and preparing the
existing road surface as per specifications :
8
Amount
(In Rs.)
110.00
i)
On W.B.M. @ 0.75 Kg / sqm
M2
500.00
ii)
On bituminous surface @ 0.50 kg. / sq.m.
M2
1500.00
M2
1950.00
2.5 cm premix carpet surfacing with 2.25 cum and 1.12
cum of stone chippings of 13.2 mm and 11.2 mm size
respectively per 100 sqm and 52 kg and 56 kg of hot
bitumen per cum of stone chippings of 13.2 mm and 11.2
mm size respectively, including a tack coat with hot
straight run bitumen, including consolidation with road
roller of 6 to 9 tonne capacity etc. complete (tack coat to
be paid for separately), with paving Asphalt grade VG 10 heated and then mixed with solvent at the rate of 70
grams per kg of asphalt.
Quoted Rate
in Words
C:\Users\admin\Documents\Civil Engg. Deptt -BSL\Contractor Record\2012-13 from 447 to onwards\456 New Road\New\SOQ (456)
2/4
S.No.
Description of Items
Unit
Qty.
in Figures
2
9
Providing and laying seal coat of premixed fine aggregate
(passing 2.36 mm and retained on 180 micron sieve) with
bitumen using 128 kg of bitumen of grade VG -10
bitumen per cum of fine aggregate and 0.60 cum of fine
aggregate per 100 sqm of road surface, including rolling
and finishing with road roller all complete.
M
10
Providing and laying 40mm to 75mm thick semidence
asphaltic base course using mineral aggregate satisfying
the gradation set out in specifications with 5% binder
content 80/100 or equivalent (by weight of total mix) with
the aid of the hot mix plant and paver finisher including
rolling with road roller of 8 to 10 tonne capacity to
achieve the required compaction and density for
improvement of camber / depression etc. in road surfaces.
M3
2.25
11
Carriage of materials by Mechanicel transport including
loading, unloading and stacking wherever required upto 1
KM (Anywhere within T/ship Areas).
Cu.m.
30.00
i)
Lime, moorum, building rubbish, hard coal /
stones.
Quoted Rate
in Words
Amount
(In Rs.)
1950.00
Quoted amount without Service Tax
Add contractor’s liability of Service Tax (As per calculation given below)
Total Quoted amount including Service Tax
Details of Service Tax Calculation:
a) The value of services (quoted amount) on which Service Tax shall be applicable
(____%age of quoted amount)
C:\Users\admin\Documents\Civil Engg. Deptt -BSL\Contractor Record\2012-13 from 447 to onwards\456 New Road\New\SOQ (456)
3/4
S.No.
Description of Items
Unit
Qty.
in Figures
Quoted Rate
in Words
Amount
(In Rs.)
b) The amount of Service Tax (present prevailing rate 12.36%)
c)
The percentage (____%) liability of contractor as service provider
d) The percentage (_____%) liability of NFL as Service receiver (applicable only in
specified cases of reverse charge)
e) The amount of Service Tax added in quoted value (as per (c) above)
Note-1: If tenderer declares the Service Tax such as in the following example, then it shall be
construed that the Service Tax to be shared between service provider and service receiver on
50:50 basis, subject to provision of Service Tax Rules/NIT. Example :Column (a) above = 60% value
Column (a) above = 50% value
Column(c)= 30%
Column(c)= 25%
Column(d)= 30%
Column(d)= 25%
Note-2: The contract involves supply of material, and so, transfer of property in goods. As such, it comes under the definition of
works contract. In case the service provider (Tenderer) is an individual / HUF, a partnership firm or an association of persons,
NFL shall discharge its liability of service tax as servicer receiver at prevailing rate on 50% value of services determined
according to Service Tax Valuation Rules. Also refer clause no. 8 relating to Service Tax under Commercial terms & conditions
of contract.
(Signatur of Contractor
with Rubber Stamp)
(Rajiv Rajput)
Manager (Civil)