section dd section aa section ff section jj

A
B
D
C
Pitched Roof Level
FRL TBC
system type 1
Render finish through - out first floor
section.
Pitched Roof Level
FRL ??.???
Higher Ground Level
FFL 37.500
N
M
K
SECTION J-J
L
SECTION A-A
FFL TO U/S OF 406 STEEL BEAM
R M 9 D e s i g n
T e c h n o l o g y
C o m m o n
FLOOR TO CEILING
R M 2
FFL TO DOOR HEAD
FFL TO DOOR HEAD
Floor to ceiling Curtain glazing
FLOOR TO CEILING
Floor junction feature band.
FLOOR TO CEILING
Metsec SFS Infill Walling for inner leaf
make up - size of C section TBC
Suspended Ceiling
FFL TO STRUCTURAL SLAB
Face brickwork outer leaf, block work
inner leaf
First Floor Level
FFL 40.712
FFL TO FFL
Brickwork coping level from under
feature band to main building
continued through-out single storey
areas as shown.
FFL TO CILL
Aluminium guttering formed as part of
roof structure. Rain water down pipes
to run down internally.
A
FLOOR TO CEILING
D
A
A
B
B
C
C
A
Metsec SFS Infill Walling for inner leaf make up with
render finish through - out first floor section.
Brickwork coping level from under feature band to
main building continued through-out single storey
areas as shown.
FLOOR TO CEILING
Aluminium guttering formed as part of roof structure.
Rain water down pipes to run down internally.
FFL TO CILL
High level glazing in between roof trusses.
H
450mm Diaphram wall with render finished walls to
hall continued through-out.
FFL TO FFL
FFL TO U/S OF 406 STEEL BEAM
FLOOR TO CEILING
FFL TO DOOR HEAD
Y A R D
S P O R T
H A L L
J
C O U R T
J
Suspended Ceiling
I
V o i d
hang on this margin.
C e i l i n g
Face brickwork outer leaf, block work
inner leaf
FFL TO TOP OF STRUCTURAL SLAB
Floor junction feature band.
I
First Floor Level
FFL 40.712
Lower Ground Level
FFL 36.000
N
M
L
K
LOCATION PLAN
SECTION D-D
A
B
D
C
Pitched Roof Level
FRL TBC
system type 1. Aluminium guttering
formed as part of roof structure. Rain
water down pipes to run down
internally.
Rev.
Date
Description
Drawn
JAT
FFL TO CILL
Floor junction feature band.
Suspended Ceiling
FLOOR TO CEILING
Render finish through - out first floor
section. Metsec SFS Infill Walling for
inner leaf make up - size of C section
TBC
High level glazing in between roof trusses.
First Floor Level
FFL 40.912
NPS South West Ltd.
H A L L
Lower Ground Level
FFL 36.000
V o i d
RM1 Common
FFL TO FFL
C e i l i n g
FFL TO STRUCTURAL SLAB
V o i d
FLOOR TO CEILING
S P O R T
FFL TO DOOR HEAD
C e i l i n g
FFL TO U/S OF 406 STEEL BEAM
450mm Diaphram wall with render finished walls to
hall continued through-out.
FLOOR TO CEILING
Floor to ceiling Curtain glazing
E
H
Render finish through - out first floor
section. Metsec SFS Infill Walling for
inner leaf make up - size of C section
TBC
E
G
Aluminium guttering formed as part of
roof structure. Rain water down pipes
to run down internally.
D
G
Pitched Roof Level
FRL ??.???
D
F
system type 1
B
C
F
D
Head office:
Venture House, Capital Court, Bittern Road
Sowton Industrial Estate, Exeter, Devon, EX2 7FW
South Office:
The Acorn Centre, 5 Pennant Way
Lee Mill Industrial Estate, Ivybridge, Devon, PL21 9GP
North Office:
Civic Centre, North Walk, Barnstaple, Devon, EX31 1ED
Tel:
Fax:
Email:
Web:
01392 351000
01392 351111
[email protected]
www.nps.co.uk
Higher Ground Level
FFL 37.700
Lower Ground Level
FFL 36.200
Project
Client
Roundswell; PACC, BESD, ICS
Devon County Council
Deed Ref.
SECTION F-F
OS Sheet
Subject
Date
Scale
Sections - A, D, F, J
21 07 10
1:100 @ A1 X
Drawn
Checked
AJB
NJJ
Rev.
C100020
AL (P) 06
The contractor is to comply in all respects with the current Building Regulations and is to check all site dimensions and levels. Do not scale from the drawing, use written dimensions.
NPS South West Ltd. is part of the NPS Group. Registered office: Lancaster House, 16 Central Avenue, St. Andrews Business Park, Norwich, NR7 0HR
Tel: 01603 706000 Fax: 01603 706001 Web: www.NPS.co.uk
-