PART – III Price bid
RASHTRIYA CHEMICALS & FERTILIZERS LTD.
(A Government of India Undertaking)
Registered office: Priyadarshini, Eastern Express Highway, Sion: Mumbai: 400022.
Department: Factory Civil Maintenance
Office Address
: Room No. 1/2, Nirman Bhavan, RCF Factory, Mahul Road, Chembur, Mumbai-400074.
Tel: 022 – 2552 2545 / email: [email protected]
Tender ref. : RCF/TU/FCM/ARC/Int. Paint/2014
Tender Work
ARC for internal painting for the year 2014-15 of various
buildings inside RCF Trombay Factory.
Stage II Bid (Envelope III) : PRICE BID
Name of the Bidder : ________________________
1
PART – III Price bid
Schedule of Rates (PART – A)
Sr.
No
Item
Qty
Unit
Rate
Amount (`
`.)
1
Providing and applying three coats of White/colour
wash to any surface with lime wash prepared from
quick lime of best quality by adding blue/colour
pigments and glue of approved colour, quality in
required quantities at all height and locations as
directed including scaffolding, cleaning and
preparing surfaces for painting with broom, coir and
sand paper if necessary or by any other approved
means etc. complete as directed by Engineer-incharge.
5500.00
m2
26.09
1,43,495.00
Providing and applying first single coat of approved
primer and two coats of acrylic distemper (oil
bound distemper) of an approved make and colour
as per manufacturers specifications to any surface,
at all height and locations as directed including
scaffolding, cleaning and preparing surfaces for
painting with broom by any approved means, etc.
complete as directed by Engineer-in-charge.
22000.00
m2
70.07
15,41,540.00
2
3
Providing and applying synthetic enamel paint
or flat oil paint in any required shade to any
surface in two coats over a primer coat as
per manufacturers specifications
including
scrapping, cleaning the surface etc. complete.
a
For plastered surface
2500.00
m2
111.07
2,77,765.00
b
For wood work
500.00
m2
96.09
48,450.00
c
For steel work
1000.00
m2
98.40
98,400.00
4
Providing and applying 12mm thick internal plaster
in cement mortar 1:3 with neeru finish at all
heights and locations in one coat for masonry
(except stone masonry) and concrete surfaces
including racking out joints, hacking of concrete
surface, watering, finishing, curing, scaffolding etc.
complete.
Extra over item no. 1 for preparing the old surface
for white/colour wash or dry/water bound
distemper including scrapping the old paint with
wire brush, blades or sand papers upto original
surface, filling in the cracks and loose patches etc.
with C.M 1:3 etc. complete as directed.
150.00
m2
222.14
33,321.00
8000.00
m2
12.67
1,01,360.00
5
2
PART – III Price bid
6
Extra over item no. 2&3 for preparing and finishing
plastered wall surfaces / concrete surfaces or
wood surfaces in line and level for acrylic (oil
bound) distemper/ synthetic enamel paint or
plastic emulsion paint by scrapping/removing the
old paint if any with wire brush or blades and
rubbing, with sand papers as required, filling in
cracks in cement mortar 1:3, applying the whole
surface with mixture of whiting powder or plaster
of paris and double boiled inseed oil of premium
quality or second quality synthetic enamel paint,
filling the cracks with premium quality putty or
hard glue in case of woodwork, rubbing down and
even up the surface by any approved means etc.
complete as directed by Engineer-in-charge
12000.00
m2
22.37
Total Excluding Taxes (`
`.)
2,68,440.00
25,12,681.00
PART - B
The following taxes shall be payable extra:
VAT under Composition
@ 8.00 %
On All above Items
Service Tax under Composition
@ 8.652 %
On All above Items
a. If successful tenderer is a body corporate (Pvt. Ltd. or Ltd. firm) above service tax @ 8.652 %
shall be paid by the party to Govt. And party has to claim it separately in bills.
b. If successful tenderer is an individual, HUF, partnership firm, AOP. The party has to pay 50%
of 8.652 % (i.e. 4.326%) to Govt. and same shall be claimed in bills from RCF. Balance 50%
shall be paid by RCFL to Govt. directly.
Asst. General Manager (C)
For & on behalf of M/s. R.C.F. Ltd.
Seal & Signature of the Tenderer
Place: _________________ &
Dated _____________________
3
PART – III Price bid
BID FORM : PRICE BID (Bid stage II )
Tender work : ARC for internal painting for the year 2014-15 of various buildings
inside RCF Trombay Factory.
Schedule Cost of work : ` 25,12,681.00/- (Excluding VAT & Service Tax but Inclusive of all other
applicable taxes)
We have noted the rates and amount given in PART A as well as taxes, duties applicable
given in PART B. We quote our offer based on information given in PART A and PART B as
under:
1) Our Quoted Rates are ???% (In figures)????????????? (in words)
% BELOW the rates specified in PART A
OR
2) Our Quoted Rates are ???% (In figures)????????????? (in words)
% ABOVE the rates specified in PART A
Name of the authorized person signing on behalf of the bidder: ____________________________
Designation/ status of the person signing on behalf of the bidder: ____________________________
Seal & Signature of the Bidder.
Place __________________ & Date ______________
Note : The bidder shall have to Quote % rate correctly ,precisely & distinctly in figures as well as in words i.e. above or
below or at par at with on the schedule of rates entered in the Bid. The quoted percent rate expressed in words
shall prevail over expressed in figure The computation of amounts shall be accurate & in line of your % rate
offer. The Bid value expressed in words shall prevail & treat as conclusive bid offer.
4
PART – III Price bid
Note:
1.
2.
3.
3.
4.
Work shall be divided in two agencies in the ratio 60 : 40.
All the material like OBD. Paints, Syn. enamel paint, lime, whiting, POP should be brought from
Material. Gate No.2 with Challans duly endorsed by CISF.
OBD Paint from following manufacturers and as approved by RCF Site In Charge shall be used:
i)
Nerolack
ii)
Asian Paints
iii) Berger
Cleaning of floors, glass panes etc. should be done after completing the work in each unit.
MS Pipe scaffolding should be used for work. Bamboo scaffolding will not be allowed. Contractor to
quote accordingly. No separate payment will be made on this account.
(B.K. Joshi)
AGM (C)
5