BCC Plan Approval
Handbook
2014
Resources
This guide contains specific information about SCA application processing requirements.
Building Code Compliance (BCC) Division closely follows the process of the NYC
Department of Buildings (DOB). Refer to the DOBs Website, www.nyc.gov/html/dob/
for:
 General DOB information about How to File an Application and Get a Permit

Plan Examination Guidelines

DOB Forms

RP-602 if merging and/or subdividing lots

ZD1 Guide
Submitting Initial Filings
Initial Filings should be submitted along with a Transmittal Form at the SCA’s Building
Code Compliance division.
Recommended New Building and Addition Doc Order

Document 01 – Zoning Egress (PW-1)

Document 02 – Structural (PW-1)

Document 03 – Underground Plumbing (PW-1 & PW-1B)

Document 04 – Civil \ Exterior Plumbing (PW-1 & PW-1B)

Document 05 – Main Plumbing / Mechanical (PW-1 & PW-1B)

Document 06 – Boiler (if applicable) (PW-1 & PW-1C)

Document 07 – Environmental (PW-1)
BCC Plan Approval Handbook
Page 2 of 6
BCC Requirements for Line Projects
Ordered by process
Document
Initial Submission — 30%
PW-1 & PD-1 for Zoning/Egress & Schedule A (PW1A)
 PW-1 & PD-1 must have house number stamp
from Borough President’s Office
1 sets of zoning and egress signed and sealed plans
Zoning Diagram (ZD-1) form
Street Trees (ST-1)
Signed and sealed property survey
Certified Tax maps
Existing C.O.
Printed BIS Property Profile
Confirmation of ownership (deed, transfer, etc.)
Applicant’s Zoning Waiver Request
60% Submission with all zoning and egress
objections addressed
One set of signed and sealed plans for 60 % submission
eFiled PW-1 for each PE/RA on the project
(PW-1B) Schedule B
(PW-1C) Schedule C
TR-1 and TR-8
Completed Borings and Soils Report with TR-1’s
Transit Authority Approvals
Subsequent applications filed in conjunction with
the Alt I and New Building at 60% submission each
applicant requires (1) set of plans.
New Fire Alarm (PW-1 & TM-1)
Fire Alarm Existing Building (PW-1 & TM-1)
Generator (PW-1 & PW-1C)
Sprinkler and Standpipe (PW-1 & PW-1C)
BPP (PW-1, BPP-1 & Photos Signed and Sealed)
Curb Cuts (PW-1)
100 % submission with all 60% objections
addressed
One sets of signed and sealed plans with all 60%
objections addressed for final review
Approval
3 set of Signed and Seal Plans
All forms must be eFiled
Approved Zoning Waiver from the Mayoral Office
Completed ST-1 and ZD-1
BCC Plan Approval Handbook
Alt. I
New
Building
Full
Demolition
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Req. Boilers
Required
Required
Near Mass
Transit
Required
Required
Required
Req. Boilers
Required
Required
Near Mass
Transit
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Near Mass
Transit
Page 3 of 6
BCC Requirements for CIP Projects, ALT II, ALT III
Document
Initial Submission
1 sets of signed and sealed plan for initial submission.
PW-1 with description of scope of work (Submit PW-1 for each
PE/RA that has signed and sealed plans for this project.)
(PW-1B) Schedule B
(PW-1C) Schedule C
BIS printout
Existing C.O. (if applicable)
Tax/Sanborn maps
Transit Authority Approvals
AI-1 with self-certification statement by owner
`
Approval
AI-1 with objections responses
3 sets of signed and sealed plan for approved with all the
objection addressed
Alt. II
Alt III EQ
Required
Required
Required
Required
If Applicable
If Applicable
Required
Required
Required
If Applicable
Required
If Applicable
If Applicable
Required
Required
Required
If Applicable
Required
Required
Required
Required
Required
Remote Access to the BCC System
Applicants or filing representatives can use the SCA’s Extranet, the Citrix Application
Portal for remote access to the BCC System. Access can be gained by notarizing a nondisclosure agreement and requesting access from BCC Management.
Disapproved Filings
Disapproved filings can be retrieved from the cabinet in the front area of BCC.
Requesting Appointments
When the plans are revised for resubmission to the Plan Examiner the applicant or filing
representative may schedule an appointment by emailing [email protected] with
the following:





The Plan Examiner’s name
The school name/building ID
The FID number
Contact information
The reason for the appointment or necessary information
BCC Plan Approval Handbook
Page 4 of 6
Requesting BCC Folders and/or Drawings
If a folder or drawing is required for an appointment or for review.
Requests for approved or permitted BCC Folders and/or Drawings should be sent to
[email protected] with the following:




DOB Number
The school name/building ID
DOB number
If the Folder/Drawings are needed for an appointment, the date and time of the
appointment and name of Plan Examiner or Technical Inspector
The Folders and/or Drawings can be picked up at the Plans Desk in the front of BCC.
Approved/Permitted filings are not allowed out Of BCC.