BCC Plan Approval Handbook 2014 Resources This guide contains specific information about SCA application processing requirements. Building Code Compliance (BCC) Division closely follows the process of the NYC Department of Buildings (DOB). Refer to the DOBs Website, www.nyc.gov/html/dob/ for: General DOB information about How to File an Application and Get a Permit Plan Examination Guidelines DOB Forms RP-602 if merging and/or subdividing lots ZD1 Guide Submitting Initial Filings Initial Filings should be submitted along with a Transmittal Form at the SCA’s Building Code Compliance division. Recommended New Building and Addition Doc Order Document 01 – Zoning Egress (PW-1) Document 02 – Structural (PW-1) Document 03 – Underground Plumbing (PW-1 & PW-1B) Document 04 – Civil \ Exterior Plumbing (PW-1 & PW-1B) Document 05 – Main Plumbing / Mechanical (PW-1 & PW-1B) Document 06 – Boiler (if applicable) (PW-1 & PW-1C) Document 07 – Environmental (PW-1) BCC Plan Approval Handbook Page 2 of 6 BCC Requirements for Line Projects Ordered by process Document Initial Submission — 30% PW-1 & PD-1 for Zoning/Egress & Schedule A (PW1A) PW-1 & PD-1 must have house number stamp from Borough President’s Office 1 sets of zoning and egress signed and sealed plans Zoning Diagram (ZD-1) form Street Trees (ST-1) Signed and sealed property survey Certified Tax maps Existing C.O. Printed BIS Property Profile Confirmation of ownership (deed, transfer, etc.) Applicant’s Zoning Waiver Request 60% Submission with all zoning and egress objections addressed One set of signed and sealed plans for 60 % submission eFiled PW-1 for each PE/RA on the project (PW-1B) Schedule B (PW-1C) Schedule C TR-1 and TR-8 Completed Borings and Soils Report with TR-1’s Transit Authority Approvals Subsequent applications filed in conjunction with the Alt I and New Building at 60% submission each applicant requires (1) set of plans. New Fire Alarm (PW-1 & TM-1) Fire Alarm Existing Building (PW-1 & TM-1) Generator (PW-1 & PW-1C) Sprinkler and Standpipe (PW-1 & PW-1C) BPP (PW-1, BPP-1 & Photos Signed and Sealed) Curb Cuts (PW-1) 100 % submission with all 60% objections addressed One sets of signed and sealed plans with all 60% objections addressed for final review Approval 3 set of Signed and Seal Plans All forms must be eFiled Approved Zoning Waiver from the Mayoral Office Completed ST-1 and ZD-1 BCC Plan Approval Handbook Alt. I New Building Full Demolition Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Req. Boilers Required Required Near Mass Transit Required Required Required Req. Boilers Required Required Near Mass Transit Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Required Near Mass Transit Page 3 of 6 BCC Requirements for CIP Projects, ALT II, ALT III Document Initial Submission 1 sets of signed and sealed plan for initial submission. PW-1 with description of scope of work (Submit PW-1 for each PE/RA that has signed and sealed plans for this project.) (PW-1B) Schedule B (PW-1C) Schedule C BIS printout Existing C.O. (if applicable) Tax/Sanborn maps Transit Authority Approvals AI-1 with self-certification statement by owner ` Approval AI-1 with objections responses 3 sets of signed and sealed plan for approved with all the objection addressed Alt. II Alt III EQ Required Required Required Required If Applicable If Applicable Required Required Required If Applicable Required If Applicable If Applicable Required Required Required If Applicable Required Required Required Required Required Remote Access to the BCC System Applicants or filing representatives can use the SCA’s Extranet, the Citrix Application Portal for remote access to the BCC System. Access can be gained by notarizing a nondisclosure agreement and requesting access from BCC Management. Disapproved Filings Disapproved filings can be retrieved from the cabinet in the front area of BCC. Requesting Appointments When the plans are revised for resubmission to the Plan Examiner the applicant or filing representative may schedule an appointment by emailing [email protected] with the following: The Plan Examiner’s name The school name/building ID The FID number Contact information The reason for the appointment or necessary information BCC Plan Approval Handbook Page 4 of 6 Requesting BCC Folders and/or Drawings If a folder or drawing is required for an appointment or for review. Requests for approved or permitted BCC Folders and/or Drawings should be sent to [email protected] with the following: DOB Number The school name/building ID DOB number If the Folder/Drawings are needed for an appointment, the date and time of the appointment and name of Plan Examiner or Technical Inspector The Folders and/or Drawings can be picked up at the Plans Desk in the front of BCC. Approved/Permitted filings are not allowed out Of BCC. BCC Plan Approval Handbook Page 5 of 6 Last Updated: 3/13/2014 10:17:04 AM
© Copyright 2024 ExpyDoc