740 Fairfield Road Montoursville, PA 17754 Phone: 570-601-4765

740 Fairfield Road
Montoursville, PA 17754
Phone: 570-601-4765
Fax: 570-601-4768
www.appellationprefab.com
[email protected]
Located near Williamsport, Pennsylvania, we are a pipeline associated facilities fabricator
specializing in natural gas facilities fabrication, installation, repair, hydro-testing, blasting,
painting, and coating with an unmatched 100 % guarantee.
Appellation Pre-Fab, LLC
Appellation Pre-Fab, LLC
740 Fairfield Road
191 Palmer Industrial Road
Montoursville, PA 17754
Williamsport, PA 17701
Appellation Pre-Fab, (hereafter APF), was founded in 2009 and is based in Montoursville, PA where our
corporate headquarters is located. Our Palmer location in Williamsport PA houses our 15-acre facility
with an 120,000 square foot fabricating area and our sandblasting and coating machinery.
Although our name is fairly new to the industry, we have many years of experience in the pipeline
fabrication industry meeting safety, schedule and budget requirements.
We have employed up to 260 employees at one time when we had multiple large projects in process.
We average 125 employees during normal workload times.
We are dedicated to being the only company in the industry with a 100% x-ray quality backed by a 100%
guarantee. Our welders are held to strict quality control standards to guarantee superior quality.
Our fabricators and work force are highly skilled and trained in fabrication and construction of
piping projects incorporating ASME B31.3 and API 1104 welding procedures with the addition of ASME
Stamps, U, R, and S,. Our capabilities allow us to design, build, fabricate, and repair high pressure vessels
and piping up to 5000 PSI and unlimited wall thickness.
APF employs some of the best fabricators and welders in the industry. We utilize a Project
Management team that is dedicated to procurement, installation, and completion of projects including
Compressor Stations, Meter Stations, Wellpad Piping, Pipelines, and Dehydration Equipment. We feel we
have organized a team of competent and experienced Compressor Station and related piping professionals
to complete your project according to your specifications.
Currently APF holds Master Service agreements with all of the leading energy and pipeline
companies throughout PA, NY, and WV including PVR (Regency), Anadarko, Chief, Shell, Williams,
Dominion, Transco, Columbia, NiSource, Inergy (Crestwood), National Fuel Gas, UGI, and many others. In
addition, we are aligned to work with The Pike Company where needed for Construction Management on
large projects.
Collectively, our workforce was responsible for building numerous Compressor Stations which include:

PVR /Regency Midstream—Quaker Compressor Station, Barto Station, Canoe Run Station, Hirkey Station, and
numerous metering stations in addition to launchers and receivers

Williams Transco—numerous hot tap locations, fabrication, and pipeline installations

Dominion Transmission—Greenlick to Little Greenlick jumper lines (Renovo, PA)

Atlas Energy—Atlas pipeline (Cascade, PA)

Columbia Gas NY—Hancock Compressor Station greenfield project of 15000 HP turbine

Talisman/Fortuna Energy—Pipeline and well site installations (Southern Tier NY, Northern Tier, PA)

El Paso/Tennessee Gas Pipeline—Numerous tie-ins and related piping (PA)

Laser Gathering - Dunbar Compressor Station (Windsor, NY)

Anadarko Petroleum - Stations 285, 289, 231 (Lycoming County, PA)

Williams—Teel Compressor Station upgrades (Susquehanna, PA)

Cabot/Williams—Lathrop Compressor Stations upgrades—Susquehanna, PA
These are just a few of the most recent out of hundreds of projects our workforce has been involved with throughout
We would be happy to offer references on request.
Drafting and Construction Documentation
Drafting and Construction Documentation
Our drafting department has full design, scanning,
and printing capabilities. The department is staffed
with experienced, knowledgeable, and highly
skilled trades people, using the most current software for both 2D and 3D design work. They have
decades of “hands on” experience installing, manufacturing and erecting the most complex systems,
including structural steel and all types of oil and
gas piping systems.
We can produce precise, detailed fabrication
drawings from your construction drawings and
specifications. Potential flaws in design can be
identified early, before the project is fabricated,
avoiding costly changes which would require corrections onsite. This ensures what is fabricated in
the shop will work in the field, optimizing labor,
time, dollars, and other resources.
APF strongly supports the quality of union work. We exclusively utilize trained and skilled Union employees
to facilitate the procurement of a qualified labor force to meet the requirements of any contract through
numerous national and local agreements.
PALMER SHOP
15 ACRES
84,000 SQUARE FEET
PALMER SHOP (cont.)
15 ACRES
84,000 SQUARE FEET
STAINLESS STEEL FABRICATIONS
You dream it, we will create it!
LATHROP COMPRESSOR STATION
Construction by Appellation Pre Fab
Installed two complete compressors while
the station continued to run. Only shut
down for tie-ins for 48 hours.
LASER COMPRESSOR STATION

3 Dehy Units



4 Engines
Meter Run
Flowing gas in 4 months
HIRKEY COMPRESSOR STATION
Eight 3608 Engines running and flowing gas
in 102 days.
DOMINION TRANSMISSION
COMPANY
454 Launcher Project 68
PIPELINE DRIP INSTALLATIONS
CHAPIN DEHY STATION
REPAIR
APF prides itself on employing highly skilled tie-in
welders and pipeline repair crews with experience in
repairing natural gas/oil pipeline and related assemblies on a regular basis. We understand how critical
pipeline repair is and the safety measures that must
be taken. Safety is always our number one priority.
As we are located n the Williamsport, PA area, we
are in the heart of the Marcellus Shale natural gas
formation and can assemble a crew immediately to
repair your pipeline. With our 100% guarantee, you
can be assured that your pipeline repair will be done
safely and to perfection.
FABRICATION
We fabricate all piping assemblies of an industrial nature. APF can
fabricate piping from 2-inch up to 42-inch for meter/valve stations,
compressor/pump stations, and launchers/receivers. Our welders,
journeymen, and pipeline fabricators/welders are knowledgeable
and experienced in their trade and we stand behind their work with
a 100% guarantee.
INSTALLATION
APF is conveniently located in the heart of the Marcellus
Shale natural gas formation, near Williamsport, PA. We
can mobilize a workforce for pipeline installation within 48
hours. APF employees are field-tested and trained specifically in the natural gas and oil industry. After we fabricate
your piping system, we will ensure the installation is done
to perfection and always on time.
Throughout the years, our workforce has proven there is
no substitute for skilled craftsmen. We value the beauty of
our area and follow all local environmental codes during
installation to protect our natural resources. We strive to
go “above and beyond” in meeting your expectations.
TESTING
APF offers Pre-Hydro testing of your
piping assemblies
Reducing labor and safety factors on
well site locations.

Allowing for faster installation times.

Meeting your company’s specifications
and expectations.

Providing documentation for your
records.
SANDBLASTING, PAINTING & COATING

Blasting, painting and SP-28-88 applied coatings.

Featuring the only Roto-Blast machine in the area that
is capable of blasting hundreds of feet a day therefore
reducing your labor costs.

Included on our 15-acre facility, we have a 20’ by 18’ by
60’ fully enclosed blast cabinet capable of handling
large assemblies.

We can assemble field crews for on-site blasting/
painting, and coating to our customer’s specifications.

Workforce with over eighteen years of experience in
industrial painting applications.
APPELLATION PRE-FAB STAFF & EXPERIENCE
PRINCIPAL NAMES
William Lee Emick, Jr.
CEO

Bachelor of Science in Weld Engineering

Associates Degree in Weld Fabrication

Certificate in Welding Technology
Gregory Galante
Vice President/General Manager

Over 30 years in construction experience

Management of multi-million dollar projects

Over 30 years in Project Management and Estimating
Westley Smith
Senior Project Manager
Bachelors Degree in Welding and Fabrication Engineering Technology
Associate Degree in Welding Technology
Certificate in Welding
AWS Certified Welding Inspector
Published by:
Appellation Pre-Fab, LLC
Montoursville, Pennsylvania
Find us on the web at :
www.appellationprefab.com