TC 155 Times November 2014 Size: 553kb | File Type: PDF

E-net doc. 2014/6266
TC 155 TIMES
November 2014
BRIEFING FOR BPF-PPG MEMBERS
IN THIS ISSUE
Highlights & plenary
1
Draft harmonised standards
for thermoplastics pipes:
comments being reviewed by
Task Groups.
Pressure
2
Non-pressure
3-4
General
5
Future of CE marking for
plastic pipes systems under
discussion with Commission.
Liaison with others
5
CE marking
6
Default time for CEN enquiry
reduced to 3 months. Enquiry
and formal vote can be
combined.
Public comment stage on
revisions to start shortly:

EN 13476 Structured-wall
piping (all parts)

EN 12200-1 Rainwater
piping systems

EN 13598-2 Manhole and
inspection chambers

EN 15223 Design of buried
pipes

EN 1451-1 PP pipes,
fittings and the system.

EN 13844 and EN 13845
PVC-U sockets with seals
The 46th meeting of TC 155 was
held on the 19th and 20th
November 2014 with the new
chair Monica de la Cruz (Spain).
Of key importance to the PPG
members were:
The UK delegation comprised:
Caroline Ayres (BPF), Julia Trew
(BPF),
and
Steve
Beech
(Convenor TC 155 / WG12).
Discussions with DG Enterprise on
CE marking under mandate M/131.
The Plenary was divided into :
General matters, Pressure, Nonpressure, liaison reports and
matters relating to harmonisation.
If you wish to view any documents
relating to this meeting, contact
Carol
at
[email protected].
1
 Review of comments
umbrella hENs.
on
4
Report that Mandate M/136 is on
hold.
Russia observer status to be
declined and Japan observer status
to be terminated.
Request
for
requirement for
rejected.
permeability
CE marking
Working group reps who are
inactive
(by
attendance
or
correspondence) are to be
reviewed and possibly removed.
© BPF Plastic Pipes Group
WG8—Systems for water supply and pressure
drainage and sewerage: PVC-U (solid wall)
WG16—Systems for hot and cold water applications
Convenor: Urs Amacher (Switzerland)
Under Vienna Agreement, work on this subject is
undertaken by CEN TC 155/WG16.
Current work items
Convenor: Jerker Skarelius (Sweden)
prEN ISO 13844 (PVC-U socket joints with elastomeric
seals: Test method for leak tightness under negative
pressure). Being adapted for use with ISO 17885
(mechanical fittings). Final Vote closes 24/12/2014.
Current work items
Draft revisions of Part 7 (assessment of conformity) for
the individual material standards (PP, PE-X, PB, CPVC)
prepared. TC 155 agreed to register these work items
and send to vote. TC 155 agreed to initiate a work
item for Part 7 for PE-RT and notify TC 138 / SC2. It is
expected that Part 7 for multilayer pipes will be
presented to the next TC 155 meeting.
prEN ISO 13845 (PVC-U socket joints with elastomeric
seals: Test method for leak tightness under internal
pressure and angular deflection). Being adapted for
use with ISO 17885 (mechanical fittings). Final Vote
closes 24/12/2014.
Revision of EN ISO 15876 Parts 2, 3 and 5 (PB pipes
and fittings for hot water) — draft in preparation.
Request made to TC 155 for adoption of NWIP ISO
16422 (PVC-O pipes) as EN ISO. Proposal to be clarified
and sent for committee vote. Responsibility within TC
155 to be agreed. Reference to existing products /
standards in Europe need to be included.
Revision of 15874 Parts 2, 3 and 5 (PP pipes and
fittings for hot water) to increase the size range from
160mm to 400mm—discussion ongoing on content.
Next meeting 5th February 2015.
Next meeting - none planned.
WG12—Pressure systems of polyolefin material for
gas supply, water supply and drainage and sewerage
WG 23—Thermoplastics systems
applications
Convenor: Steve Beech (UK)
Convenor: Andreas Neubert (Switzerland)
Current work items
Under Vienna Agreement, work on this subject is
undertaken by ISO/ TC 138/SC3.
prEN 12106 (PE pipes - Test method for the resistance
to internal pressure after application of squeeze-off).
Enquiry closed, German and British comments to be
addressed. TC 155 agreed that this standard will be
developed now through ISO TC 138 / SC5 and this EN
will not be required in time.
for
industrial
Current work items
EN ISO 15494 (PB, PE, PE-X, PE-RT and PP pipes for
industrial applications) —approved for FDIS / FV vote,
Dec 2014. Problems raised with annex ZA which is
drafted under the Pressure Equipment Directive.
Next meeting—none planned.
EN ISO 15493 (ABS, PVC-U and PVC-C pipes for
industrial applications). Request for amendment to be
submitted.
EN ISO 10931: 2005 / prA1 (PVDF pipes for industrial
applications). Amendment in progress.
Next meeting—none planned.
2
© BPF Plastic Pipes Group
WG1—Installation outside building structures of
flexible piping systems
WG6—PVC piping systems for non-pressure soil and
waste and solid wall piping systems for underground
drainage
New convenor: Peter Verlaan (NL)
Convenor: Michel Divanach (F)
Current work items
Current work items
CEN / TS 15223 (Validated design parameters—design
of buried thermoplastics piping systems). Major
change to structure during revision, draft sent for TC
155 committee vote in Oct 2014. Comments to be
addressed and document issued for public comment.
EN 1329-1 (soil and waste, low and high temperature
in buildings). Published Aug 2014, request for revision
pending revision of EN 1453-1.
PD CEN/TS 1329-2 (soil and waste, low and high
temperature in buildings, assessment of conformity).
Revision to start at next meeting.
WG1 asked TC 155 if they should deal with a guidance
for installation of infiltration systems for storm water
management (see notes under WG26) and whether
there is a need for guidance for above ground
installation of non-pressure drainage and sewerage
(agreed that there is no evidence of need).
EN 1453-1 (soil and waste, low and high temperature
in buildings, structured wall). Enquiry in progress until
25/2/2015.
DD ENV 1453-2 (soil and waste, low and high
temperature in buildings, structured wall, assessment
of conformity). Revision to start at next meeting.
Next meeting 21st Jan 2015.
EN 1055 / ISO 13257 (Resistance to elevated
temperature cycling). Draft to improve test circulated
to WG6.
WG13—Systems with structured wall pipes for nonpressure drainage and sewerage—PE, PP, PVC-U
EN 1401-1 (underground drainage). TC 155 agreed to
revise .
Convenor: Peter Verlaan (NL)
Current work items
Next meeting 21st / 22nd April 2015.
EN 13476 (Structured-wall piping systems of PVC-U, PP
and PE).
Parts 1 (General requirements and
performance characteristics), 2 (Type A) and 3 (Type
B) revisions are ready for CEN enquiry and Formal
Vote (early 2015). Main focus large diameter pipes,
test regime and editorial changes.
WG 10—Systems of polyolefin material for soil and
waste discharge and non-pressure drainage and
sewerage
Convenor: Jens Martin Storheil (Norway)
Current work items
WG 13 asked TC 155 request an early revision of CEN/
TS 13476-4 (assessment of conformity), because of the
introduction of “very large” diameters and “new” test
methods in other parts. Request noted for future
meeting.
EN 1852-1 (underground drainage, PP). TC 155 agreed
to revise.
CEN/TS 1852-2 (underground drainage, PP.
Assessment of conformity). Revision to be sent for TC
155 agreement by correspondence.
Next meeting April 2015 (date to be confirmed
following CEN enquiry).
prEN 1451-1 (soil and waste, low and high
temperature in buildings, PP). To be issued for voting.
Next meeting 23rd / 24th June 2014.
3
© BPF Plastic Pipes Group
WG 15—Pipes and fittings for piping systems for
rainwater discharge
WG 26—Systems for storm water handling
Convenor: Hielke Hoekstra (NL)
Convenor: Alastair Walmsley (UK)
Current work items
Current work items
WI 00155783 and WI 00155784 (see below for titles),
will run out of time before completion, new work
items approved by TC 155 to continue work.
EN 12200-1 (Rainwater piping systems. PVC-U).
Revision prepared by convenor and discussed by
WG15, includes other polymers for the external layer
of pipes and fittings. Issued for CEN enquiry between
13 Nov 2014 and 28 Feb 2015.
WI 00155784 (Test method for determination of short
term compression strength of boxes). Document
being checked ahead of 2nd committee ballot.
Next meeting 14th April 2015.
WI 00155783 (Test method for determination of long
term structural compression strength of boxes).
Proposed test needs revision as the outcome of the
test results will not give distinctive results. UK
delegation working on revision to present to next
meeting.
WG20—Ancillaries for soil and waste discharge and
gravity buried drainage and sewerage systems
Convenor: Alastair Walmsley (UK)
WI 00155824 (Specification for boxes used for
infiltration, attenuation and storage systems made of
PVC-U and PP). In preparation, but disagreement of
materials clauses. UK propose including in informative
annex to guide suppliers and purchasers of materials.
Current work items
EN 13598-2 (Specifications for manholes and
inspection chambers in traffic areas and deep
underground installations. PVC-U, PP and PE). Revised
following comments during 5 year review. Ready for
CEN enquiry between Dec 2014 and Mar 2015.
Preliminary work item registered by TC 155 for
components for storm water handling to cover
mechanical resistance of tanks. This addresses
infiltration and infiltration tanks referred from TC
165 / WG50 (water reuse).
Part 1 will also need to be revised to remove overlap.
TC 155 were asked about the timescale for this activity
and it was referred to WG20.
New part for Attestation of Conformity will be started
when product standard has gone to CEN enquiry.
Decision on harmonized standards under mandate
M/118 pending TC 155 discussions on M/131.
Next meeting 9th / 10th February 2015.
Next meeting 9th/10th June 2015
4
© BPF Plastic Pipes Group
WG17—Rehabilitation of pipeline systems
WG 27 Environmental aspects
Convenor: Wim Elzink (NL).
Convenor:
Sándor Aranyi (Hungary). Drafts for
Environmental Product Declarations - Product
Category Rules for (i) buried pipes and (ii) pipes in
buildings to be sent to TC 155 for committee ballot
before CEN enquiry.
The scope of WG17 was recently aligned with ISO TC
138/SC8 (chaired by John Gumbel, UK) to include
trenchless replacement and renovation, SC8 lead on
standards development and includes both water and
gas applications. Wim Elzink is liaison officer between
TC 155 and ISO TC 138/SC8. Concern was raised at TC
155 over marginal difference between rehabilitation
(pipe in pipe) and no-dig installation of new pipes
(replacement by a new pipe) and where
responsibilities lie.
AHG 45 Lifetime expectancy of non-pressure piping
systems
Convenor: Henk Meerman (NL)
This AHG is working on a package of tests for
determining the life expectancy of materials of nonpressure pipes to increase options for use of recycled
materials. Two tests considered: Fatigue and Cracked
Round Bar method based on ISO/DIS 18489.
Comparative testing between two tests on PP and
PVC, virgin and non-virgin is ongoing to establish
method and equipment. Next meeting 2nd / 3rd
December 2014.
Next meeting - none planned.
WG25— Recycling of PVC-U, PE and PP materials
Convenor: Tinus De Lange (NL). Nothing to report.
Next meeting - none planned.
CEN TC 107 Prefabricated district heating piping
systems—Fpr CEN/TS 16591 “crosslinkable PE-Xb in
district heating pipes” to be cancelled.
CEN TC 164 Water Supply—4MS—Portugal to join as
5th member. Substances already listed for food
contact automatically to be accepted for water and
not included in core 4MS list. Test for mutual
recognition of Enhancement of Microbial Growth not
agreed but until M/136 restarted for products there is
no driver to sort this. National Regulations continue.
CEN TC 127 Fire safety in buildings—draft EN 1366
includes plastic pipes, to be issued for CEN enquiry.
CEN TC 249/WG16 Thermoplastics welding—new
technical report being drafted for supervision of
welders.
CEN TC 165—Wastewater systems—EN 124 (Gully,
manhole tops) prepared for FV includes Part 6 for
thermoplastics; EN 1610 (pipelaying) prepared for FV;
EN 12889 (trenchless construction) withdrawn. EN
1433 (drainage channels) revision started but plastics
not well represented.
CEN / CLC TC 213 Underground plastics conduits for
protection of cables - new standard being drafted EN
50626 (part 1 for pulled cables, part 2 for other cable
installation).
TEPPFA project on lifetime of polyolefin non-pressure
pipes—conclusions presented to TC 155, slides will be
circulated later. Needs to link with work of AHG 45.
ISO TC 138 and its working groups—see separate
report e-doc 6248 for work in ISO.
5
© BPF Plastic Pipes Group
CEN TC 155 PLENARY MEETINGS
Mandate M/131 (harmonised standards on pipes, tanks and
ancillaries not in contact with water intended for human
consumption)
Spring 2015: Vienna, Austria
Four application-based harmonised standards (hENs) proceeding:
Autumn 2015: Delft, Netherlands
prEN 15012 Buried and above ground piping components for non-
Spring 2016: Helsinki, Finland
pressure soil and waste discharge within the building structure.
prEN
15013
Non-pressure
drainage
and
sewerage
piping
components buried in ground.
prEN 15014 Buried and above ground piping components for water
under pressure.
prEN 15015 Hot and cold water piping components.
The draft hENs were subject to a 5 month CEN enquiry following
which the tasks groups have started to discuss comments.
CEN TC 155 sought a meeting with the European Commission’s DG
Enterprise to confirm fundamentals of CE marking under the CPR,
clarify essential requirements and to identify a way forward.
DG Enterprise has proposed that CE marking for this sector may be
reviewed as products standards already exist to meet CPR objective
This document is prepared as an
overview of the workings of CEN
TC 155 for BPF-PPG members
only.
Reference should always be
made to the full documents and
official minutes and resolutions
of the meeting.
All information is given in good
faith but no responsibility can be
accepted
for
errors
and
omissions.
to remove barriers to trade.
Other mandates under Construction Products Regulations
Mandate M/136 Harmonised standards for construction products
in contact with water intended for human consumption — work on
products postponed (confirmed by DG Enterprise), response to
mandate to be delayed.
Mandate M/366 Dangerous substances—nothing to report.
Mandate M/118 Harmonised standards for waste water
engineering products—work on manholes and shafts pending
clarification of direction of M/131.
Prepared by:
Julia Trew
Standards Manager
BPF—Plastic Pipes Group
Tel: 01793 326284
Mobile: 07885 561190
E-mail:
[email protected]
6
© BPF Plastic Pipes Group