WiFi-3GPP Interworking Study Group |MINUTES 10 th July 2014 | 10-11am IST | Teleconference Call : Meeting #2 Meeting called by Sudeep DIVAKARAN Attendees Bheemarjuna Reddy, IIT Hyderabad Type of meeting Study Group Meeting #2 Hardeep Saini, Qualcomm Kiran Kuchi, IIT Hyderabad Mini Vasudevan, Ericsson Nadeem, CeWit Punit, IIT Bombay Sumohana Channappayya, IIT Hyderabad Sudeep, Intel AGENDA TOPICS Time allotted | 5min | Agenda topic General Updates | Presenter Sudeep - TSDSI study group specific Email List & Shared Folder not ready yet. Continue using shared email ID’s to communicate/share documents for the short term. Action items Person responsible Deadline Setup Shared Folder Sudeep ASAP Create Mailing List Sudeep ASAP Time allotted | 10min | Agenda topic 3GPP Meeting Updates See attached slides Action items Person responsible Deadline Add new members email IDs Sudeep 7/17/2014 Provide Names of members (where only email IDs available) Punit, IIT Bombay 7/17/2014 Time allotted | 40min | Agenda topic Study Item (SI) proposals review & discussion Discussion: See attached Slides 1. Title: Call for Proposals (ref: Slide deck) Comments: IIT Bombay, Tata Teleservices: o Include “WLAN Access Controller – AP interface study and standardization possibilities” as a fourth focus area Conclusion: To be updated in Meeting #2 V1.2 slide-deck. Gather more information from Tata Teleservices on the exact requirements for study/analysis to help define scope. Action items Person responsible Deadline Update Slide deck to include 4th Focus Area (WLAN Access Controller – AP interface standardization) Sudeep, Intel India 7/16/2014 Provide more information on the study item related to WLAN Access Controller-AP interface. Tata Teleservices 7/24/2014 2. Title: UE Battery Optimization (ref: Slide deck) Comments: Intel India o WiFi ON/OFF by network controlled policies is a highly discussed topic in 3GPP. User preference is given higher priority. o But from TSDSI perspective, given the strong requirement to study/analysis the requirement to control WiFi ON/OFF to save battery, this topic can be relooked. o Possible solutions : first thoughts in slide-deck. One of the options is to look if this can be added in the proposal of integrated eNB/AP (collocated physically or logically). IIT Hyderabad & Bombay: o The requirement was to control WiFi switch on/off both in Trusted and UnTrusted WiFi access cases. So, not necessarily applied to co-located eNB/AP cases. o Counter Argument: Is this requirement really important? Question arises if WiFi Power consumption is really high when ON. Can chipset suppliers provide some data (802.11 a/b/n/g/ac..) Qualcomm o To consult with internal experts and check if there is any existing support or work already done as part of 3GPP to address this requirement. Conclusion: Gather WiFi Idle mode power consumption data. Accordingly decide if it makes sense to identify solutions to Switch ON/OFF Wifi based on the interworking scenario. Deadline to close this topic W32 2014. Action items Person responsible Deadline Chipset Supplier Companies to provide some rough data about typical WiFi power consumption figures during idle mode. Members from Chipset 7/16/2014 Companies Check if WiFi Power Consumption related analysis is already available in 3GPP Punit, IIT Bombay 7/16/2014 3. Title: Offload Algorithms (ref: Slide deck) Comments: IIT Bombay has done an analysis on the type of parameters to decide Traffic Steering. Conclusion: IIT Bombay to present their study on Traffic Steering. Page 2 Action items Present study on Traffic Steering during the next meeting Person responsible Deadline Punit, IIT Bombay 7/17/2014 4. Title: Seamless Flow Control (ref: Slide deck) Comments: Intel India o Investigate if Integrated eNB/AP solution can address this requirement Technical Study needed of current proposals in 3GPP (Control Plane/User Plane aspects) Study all use-case scenarios. Identify Pros/Cons. IIT Hyderabad o How are roaming scenarios handled in integrated eNB/AP proposal Conclusion: As a first step, IIT Hyderabad (BheemaArjun) to start listing the various use-cases and scenarios. Other members to contribute. Action items Person responsible Deadline Present integrated eNB/AP proposal Sudeep, Intel India 7/17/2014 Prepare different use-cases that need to be considered to understand the pros/cons of the proposed solution Bheema Arjun, IIT Hyderabad 7/24/2014 Page 3
© Copyright 2024 ExpyDoc