On November 17, 2014 Paragon Offshore released the attached Fleet Status Report. A copy of this report is available in PDF format at www.paragonoffshore.com. The Company anticipates issuing its next Fleet Status Report on Monday, December 15, 2014. This summary of the Fleet Status Report is provided as a courtesy and is not intended to replace a detailed review of the report. You are urged to review the Fleet Status Report in detail. Current Fleet Status Report Summary New Contracts and Extensions India: L1112 - New contract from mid-October 2015 to mid-October 2018. Middle East: M1161 - New contract from late February 2015 to late February 2018 in India. M786 - New contract from late January 2015 to late January 2018 in India. Paragon Offshore Fleet Status Report November 17, 2014 Actual / Estimated Nonrevenue Days (j) Q4 2014 Q1 2015 Operator Dayrate ($000) Estimated (e) Contract Start Estimated (e) Contract End BR Petrobras 347 Early Dec 2013 Late Aug 2017 - - Eligible for a maximum 15% performance bonus. 5,600' BR Petrobras 300 Mid Aug 2012 Early Mar 2017 - - Eligible for a maximum 15% performance bonus. DS 5,000' BR Petrobras 290 Late Oct 2012 Early May 2015 30 - SS 4,000' BR Petrobras 270 Mid Oct 2010 Mid Oct 2015 5 - Eligible for a maximum 15% performance bonus. Periodic class survey and upgrades in 4Q2014. Eligible for a maximum 10% performance bonus. Periodic class survey in 4Q2014. JU 390' MEX Pemex 112 Mid Apr 2012 Late Jan 2015 - - JU 390' MEX Pemex 112 Early May 2012 Early Mar 2016 15 - JU 390' MEX Pemex 112 Mid Apr 2012 Early Apr 2015 - - JU 300' MEX Pemex 101 Early Apr 2013 Early Apr 2016 9 - Periodic class survey in 4Q2014. JU 300' MEX - - - - - - Available. JU 300' MEX Pemex 101 Early Apr 2013 Mid Mar 2016 - - JU 300' MEX Pemex 90 Early Jul 2012 Late Nov 2014 - - JU 300' MEX Pemex 82 Mid Sept 2011 Early Feb 2015 - - JU 250' MEX Pemex 69 Late Dec 2011 Late Mar 2015 - - JU 250' MEX Pemex 85 Late Jun 2012 Early May 2015 11 - JU 250' MEX Pemex 85 Late Jun 2012 Late Mar 2015 - - DS 1,500' IN 151 Mid May 2012 Mid May 2015 - - JU 300' IN Deepwater Drilling (ONGC) Jindal (ONGC) Deepwater Drilling (ONGC) 55 62 Late Feb 2010 Mid Oct 2015 Late Feb 2015 Mid Oct 2018 15 - - SOUTH EAST ASIA (f) JU 300' MY Talisman 120 Mid Apr 2014 L785 (NGM) Changes from the previous fleet status report are in red. Mid Apr 2015 - - Rig (a,b) BRAZIL DPDS3 (NRE) DPDS2 (NLS) DPDS1 (NPH) MSS2 (NTM) Type (c) Water Depth Area (d) DS 7,200' DS Comments (f,g) MEXICO (f) M841 (NBJ) M842 (NEP) M531 (NLJ) B301 (NJH) L1116 (NGR) L1113 (NJS) L1114 (NSN) L781 (NRB) M821 (NCN) M824 (NTJ) M823 (NEF) INDIA (f,h) MDS1 (NDU) L1112 (NEH) Periodic class survey in 4Q2014. Well in progress in discussion for contract extension. Periodic class survey in 4Q2014. Rig is on a modified bareboat chartered to Deepwater Drilling which is contracted to ONGC. Rig is on a modified bareboat charter to Jindal which is contracted to ONGC through late February 2015. Periodic class survey in 4Q2014. Modified bareboat charter to Deepwater Drilling which is contracted to ONGC from mid-October 2015 to midOctober 2018. Page 2 of 4 Paragon Offshore Fleet Status Report November 17, 2014 Actual / Estimated Nonrevenue Days (j) Q4 2014 Q1 2015 Dayrate ($000) Estimated (e) Contract Start Estimated (e) Contract End 135 Mid Jan 2014 Mid Jan 2017 - - 140 Early Apr 2014 Mid Dec 2014 - - - - - - - - QA Total 111 Mid Feb 2013 Early Mar 2016 - - 300' UAE 62 Late Feb 2015 Late Feb 2018 - - 300' UAE 53 Late Jan 2015 Late Jan 2018 - - 250' UAE Deepwater Drilling (ONGC) Deepwater Drilling (ONGC) - - - - - - 150' UAE NDC (ADOC) 95 Late Nov 2013 Late Nov 2015 - - 150' UAE NDC (ADOC) 89 Mid Jul 2013 Mid Jul 2015 - - SS 1,500' UK Nexen 280 Late Jun 2014 Late Jun 2015 - - JU 390' UK Centrica 154 Early Apr 2013 Early Apr 2016 - 35 JU 360' NL Total 176 Early Jun 2014 Early Dec 2015 - - JU 300' NL DANA 180 Late Jul 2014 Mid Jan 2015 - - JU 250' JU 250' NL NL NL TAQA / ONE ONE GDF SUEZ JU 250' NL GDF SUEZ 164 170 168 167 168 Early Aug 2014 Mid April 2015 Early Apr 2014 Mid Feb 2015 Mid Feb 2014 Mid April 2015 Mid Nov 2015 Mid Feb 2015 Late Dec 2015 Early Mar 2015 - - JU 250' UK Wintershall 168 Late Dec 2013 Late Jun 2015 - - WEST AFRICA (f,i) JU L782 (NPJ) 300' CG EG EG SOCO Marathon Marathon 125 172 165 Mid Jul 2014 Early Dec 2014 Early Mar 2015 Late Nov 2014 Early Mar 2015 Early May 2015 - - Contract preparation for Marathon from late November 2014 to early December 2014 at a dayrate of $100K. JU 300' BEN SAPETRO 145 Mid Oct 2013 Mid Jan 2015 - - Estimated end moved from early December to mid-January due to operator's well plans. JU 250' CM Perenco 141 Late Sep 2014 Late Mar 2016 - - JU 250' CM Perenco 136 Early Feb 2013 Early Dec 2014 - - JU 150' CM Rig (a,b) Type (c) Water Depth Area (d) Operator 300' UAE 300' QA NDC (ADMAOPCO) RasGas 300' UAE 300' Comments (f) MIDDLE EAST JU M1162 (NRR) JU L784 (NJP) JU L1111 (NGA) JU L1115 (NHD) JU M1161 (NCY) JU L786 (NKD) JU M822 (NCS) JU B152 (NDF) JU Dhabi II (Dhabi II) NORTH SEA MSS1 (NTvL) B391 (NJR) C20051 (NAW) C20052 (NBW) C461 (NLB) C462 (NPvE) C463 (NRH) HZ1 (NGS) L783 (NTC) M825 (NEN) M826 (NLN) B153 (NDW) Estimated end moved from early December to mid-December due to operator's well plans. Available. Rig is on a modified bareboat charter to Deepwater Drilling which is contracted to ONGC. Rig is on a modified bareboat charter to Deepwater Drilling which is contracted to ONGC. Available. Maintenance in 1Q2015. Cold stacked. Changes from the previous fleet status report are in red. Page 3 of 4 Paragon Offshore Fleet Status Report November 17, 2014 Footnotes (a) A cross-reference of the Paragon rig names to the previous Noble rig names is available on our website at www.paragonoffshore.com in the "Our Fleet" section. On this Fleet Status Report, former Noble rig name is indicated by a three letter abbreviation below the Paragon rig name. (b) Naming convention for rigs is based on rig design. Floaters begin with "DP" for Dynamic Positioning or "M" for Moored. Jackups begin with "B" for BMC 150, BMC 300 or BMC Europe; "C2005" for CFEM T-2005-C, "C46" for CJ-46; "L111" for Levingston 111-C, "L78" for F&G L-780 Mod II; and "M" for MLT 116-C, MLT 82-C, MLT 82-SD-C, or MLT 84-ERC. The Dhabi II is a BMC 150, HZ1 is a NAM Nedlloyd-C, and FPSO1 is an A1 Floating Production Storage and Offloading vessel. (c) The codes for type of rig are: DS - Drillship, JU - Jackup, and SS - Semisubmersible. (d) The codes for area of operations are: BEN - Benin, BR - Brazil, CG - Congo, CM - Cameroon, EG - Equatorial Guinea, IN - India, MY - Malaysia, MEX - Mexico, NL - Netherlands, QA - Quatar, UAE - United Arab Emirates, and UK - United Kingdom. (e) The date ranges are defined as: Early is 1st - 10th, Mid is 11th - 20th and Late is 21st - Month End. (f) In various market segments, the Company contracts with certain parties for the provision of certain local services and advice. Compensation paid to such parties by the Company typically is based on a percentage of the drilling contract’s daywork operating rate, and the Company accounts for such payments in its financial statements in the contract drilling services operating costs and expenses line item. (g) The drilling contract provides the client with the right to terminate the contract in the event of excessive downtime. While we have exceeded downtime thresholds in the past on certain rigs contracted with Petrobras, we have not received any notification concerning contract cancellations nor do we anticipate receiving any such notifications. (h) Listed rigs are operated pursuant to a modified bareboat charter agreement; cost structure of such bareboat charter agreements varies by agreement. The contracted rates provided are net of costs associated with the bareboat charter agreement. (i) The following rigs and FPSO are currently cold stacked: B153 (NDW), DPDS4 (NMO), MSS3 (NLoB), and FPSO1 (Seillean). (j) Non-revenue days include planned shipyard stays and surveys. They also include unpaid operational downtime greater than 5 days. Available / off contract days are not included. This fleet status report contains information on contracts with our customers. The information contained in this fleet status report is as of the date of the report only and is subject to change without notice to the recipient, and we assume no duty to update any portion of the information contained herein. This fleet status report contains statements that are not historical facts, which are “forward-looking statements” within the meaning of the U.S. federal securities laws. Forward-looking statements include, but are not limited to, statements about estimated duration of client contracts, contract dayrate amounts, future contract commencement dates, timing and duration of shipyard projects, our business, financial performance and prospects. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct. Various factors could cause actual results to differ materially. Dayrate reflects the full daywork operating rate payable to the Company by the operator as provided in the applicable drilling contract unless otherwise specified. The average dayrate over the term of the contract will be lower and could be substantially lower. The actual average dayrate will depend upon a number of factors (rig downtime, suspension of operations, foreign exchange currency movements, etc.) including some beyond our control. Our client contracts and operations are generally subject to a number of risks and uncertainties. We discuss these factors, including risks, uncertainties and assumptions concerning actions by our clients, governments and other third parties, drilling activity levels, market conditions, operational difficulties, weather related events and other matters, from time to time in our filings with the U.S. Securities and Exchange Commission (“SEC”), which we urge you to review and which are available free of charge on the SEC’s website at www.sec.gov. Page 4 of 4
© Copyright 2024 ExpyDoc