New Energy Era in Mexico

New Energy Era in Mexico.
Opportunities ahead…
Alberto de la Parra
Jones Day, Mexico City Office
February, 2015
࣓࢟ࢩࢥ࡟࠾ࡅࡿ࢚ࢿࣝࢠ࣮᪂᫬௦
௒ᚋࡢᶵ఍
䜰䝹䝧䝹䝖䞉䝕䞉䝷䞉䝟䞊䝷
䜰䝹
䝹䝖 䝕 䝷 䝟 䝷
䝆䝵䞊䞁䝈䞉䝕䜲 䝯䜻䝅䝁䝅䝔䜱䜸䝣䜱䝇
㻞㻜㻝㻡ᖺ㻞᭶
HYDROCARBONS
3
Ⅳ໬Ỉ⣲㈨※
4
Where we left …
CONSTITUTIONAL REFORM
&
SECONDARY LEGISLATION
Migration of Service Contracts
T
To
E&P Contracts
Creation of State Productive Enterprises
• Mature
Mat re onshore fields : Rodador,
Rodador Ogarrio
FARM OUTS
5
and Cárdenas – Mora.
• Mature offshore fields : Bolontikú, Sinán
and Ek.
• Heavy oil fields (offshore): Ayatsil – Tekel –
Utsil.
• Giant shallow water gas fields: Kunah –
Piklis.
• Discoveries in the Perdido Area: Trión and
Exploratus
๓ᥦ࡜ࡋ࡚ …
᠇ ἲ ᨵ ṇ
&
஧ ḟ ἲ ไ
ࢧ࣮ࣅࢫዎ⣙࠿ࡽ
E&P ዎ⣙࡬ࡢ⛣⾜
ᅜႠ⏕⏘఍♫ࡢ๰タ
•ᡂ⇍࢜ࣥࢩࣙ࢔༊⏬: Rodador, Ogarrio ཬࡧ
Cárdenas – Mora.
•ᡂ⇍࢜ࣇࢩࣙ࢔༊⏬: Bolontikú, Sinán ཬࡧ
Ek.
•㔜Ἔ༊⏬㸦࢜ࣇࢩࣙ࢔㸧: Ayatsil – Tekel –
Utsil.
• ኱ὸᾏ࢞ࢫ༊⏬: Kunah – Piklis.
Piklis
•Perdidoᆅᇦ࡟࠾ࡅࡿⓎぢ: Trión ཬࡧ
Exploratus
ࣇ࢓࣮࣒࣭࢔࢘ࢺ
6
A NEW
•
New corporate structure for Pemex designed using the best international
practices insuring technical and management autonomy
practices,
autonomy, without losing
control and ownership by the State.
More flexible operations
• They are vested with special regimes regarding: budget, public debt,
contracting, goods, remunerations and subsidiary companies and
affiliates The companies are the ones making the decisions without the
affiliates.
Governments intervention.
M
More
transparency
t
• Besides complying with the Transparency Law they shall disclose
i f
information
ti iin th
the same tterms th
than th
the companies
i registered
i t d att th
the stock
t k
exchange (their risks, relevant events, prospects and properties).
State assumes the role of
owner and stops
intervening in the direct
management of the
companies.
• Appoints members of the Board of Managers and its Director General.
• The Executive proposes to Congress the State dividend that the companies shall
deliver to the State.
• Evaluate the overall performance of the companies and its directors.
New Subsidiaries
•Primary-production: responsible for exploration, production and processing
activities
•Industrial-transformation: responsible for refining and petrochemicals
7
A NEW
•
Pemex ࡢ᪂ࡓ࡞௻ᴗᙧែࡣࠊᅜ࡟ࡼࡿᨭ㓄࣭ᡤ᭷ࢆ⥔ᣢࡋࡘࡘࡶࠊᅜ㝿ⓗ
࡞࣋ࢫࢺࣉࣛࢡࢸ࢕ࢫࢆཧ⪃࡟ ᢏ⾡࣭⤒Ⴀୖࡢ⊂❧ᛶࢆ☜ಖࡋࡓタィࡀ
࡞࣋ࢫࢺࣉࣛࢡࢸ࢕ࢫࢆཧ⪃࡟ࠊᢏ⾡
⤒Ⴀୖࡢ⊂❧ᛶࢆ☜ಖࡋࡓタィࡀ
࡞ࡉࢀ࡚࠸ࡿࠋ
ࡼࡾᰂ㌾࡞࣮࢜࣌ࣞࢩࣙࣥ
᭦࡞ࡿ㏱᫂ᛶ
ᅜࡣᡤ᭷⪅࡜ࡋ࡚ࡢᙺ๭ࢆ
ᢸ࠸ࠊ఍♫ࡢ⤒Ⴀ࡬ࡢ௓ධ
ࢆ⾜ࢃ࡞࠸ࠋ
᪂ࡓ࡞Ꮚ఍♫
• Pemexࡣࠊண⟬ࠊබⓗമົࠊዎ⣙ࠊၟရࠊሗ㓘ࠊᏊ఍♫ཬࡧ㛵㐃఍♫࡟
㛵ࡋ࡚≉ู࡞ไᗘࡀᐃࡵࡽࢀ࡚࠾ࡾ ᨻᗓࡢ௓ධ࡞ࡃỴᐃࡀ⾜ࢃࢀࡿ
㛵ࡋ࡚≉ู࡞ไᗘࡀᐃࡵࡽࢀ࡚࠾ࡾࠊᨻᗓࡢ௓ධ࡞ࡃỴᐃࡀ⾜ࢃࢀࡿࠋ
• PemexࡣࠊTransparency
ࡣࠊ
p
y Lawࢆ㑂Ᏺࡋࠊ࠿ࡘドๆྲྀᘬᡤୖሙ௻ᴗ࡜ྠࡌ
ࢆ㑂Ᏺࡋࠊ࠿ ドๆྲྀᘬᡤ ሙ௻ᴗ࡜ྠࡌ
᮲௳ࡢࡶ࡜࡟᝟ሗ㛤♧ࢆ⾜࠺㸦ࣜࢫࢡࠊ㛵㐃஦㇟ࠊᴗ⦼ண᝿ཬࡧ㈨⏘㸧ࠋ
• Board of ManagersࡢᵓᡂဨཬࡧDirector
g
Generalࢆ㑅௵ࡍࡿࠋ
• ᨻᗓࡣࠊ㆟఍࡟ᑐࡋ࡚ࠊ఍♫ࡀᅜ࡟஺௜ࡍࡿ㓄ᙜ࡟㛵ࡋ࡚ᥦ᱌ࢆ⾜࠺ࠋ
• ఍♫ཬࡧᙺဨࡢᴗ⦼ホ౯ࢆ⾜࠺ࠋ
•୍ḟ⏕⏘: ᥈㖔ࠊ⏕⏘ཬࡧฎ⌮ᕤ⛬ࢆᢸᙜ
•⏘ᴗ㌿᥮: ⢭〇ཬࡧ▼Ἔ໬Ꮫ〇ရࢆᢸᙜ
8
UPSTREAM
9
࢔ࢵࣉ ࢺࣜ
࢔ࢵࣉࢫࢺ࣮࣒ࣜ
10
REMEMBERING THE REGULATION
Mexico maintains ownership of hydrocarbons in the subsoil
subsoil.
Assignments
•
Awarded to PEMEX in Round 0
•
PEMEX is allowed to migrate a number of the assigned fields to contracts and operated
trough associations with private entities (Farm-Out)
Contracts
•
Contracts may be : (i) license agreements; (ii) service agreements; (iii) profit-sharing
agreements; (iv) production-sharing agreements; or (v) any combination of these.
•
Entered into between the State, through National Hydrocarbons Commission (CNH),
and private companies or special purpose entity (SPE).
•
Possibility of registering reserves associated to a contract.
•
Administrative termination due to significant
g
contract breach. International Arbitration
•
Direct participation of the State: (i) coexisting fields; (ii) to promote technology transfer;
(iii) economic interest to participate through a special purpose vehicle. In the last two
cases, a maximum 30% participation will be established.
•
Mining concessionaries may obtain a contract to extract coal bed methane stored in
carbon mines already in production without a bidding process.
Trans-boundary Hydrocarbon Reserves
•
In areas where trans-boundary reserves may exist, SPE will have a minimum
participation of 20%.
•
International treaties will apply on confirmed trans-boundary reserves.
ࣞࢠ࣮ࣗࣞࢩࣙࣥ࡟ࡘ࠸࡚
࣓࢟ࢩࢥྜ⾗ᅜࡀᗏᅵ࡟࠶ࡿⅣ໬Ỉ⣲㈨※ࡢᡤ᭷ᶒࢆಖ᭷ࡋ࡚࠸ࡿࠋ
࣓࢟ࢩࢥྜ⾗ᅜࡀᗏᅵ࡟࠶ࡿⅣ໬Ỉ⣲㈨※ࡢᡤ᭷ᶒࢆಖ᭷ࡋ࡚࠸ࡿ
๭
ᙜ
•
ࣛ࢘ࣥࢻ࣭ࢮࣟ࡟࠾࠸࡚ PEMEX ࡟๭ࡾᙜ࡚ࡽࢀࡓࠋ
•
PEMEXࡣࠊ๭ᙜࡽࢀࡓ༊⏬ࡢከࡃࢆዎ⣙࡟ࡼࡾ⛣ㆡࡋࠊẸ㛫஦ᴗ⪅࡜ඹྠ㐠Ⴀࡍࡿࡇ
࡜ࡀㄆࡵࡽࢀ࡚࠸ࡿ (ࣇ࢓࣮࣒࣭࢔࢘ࢺ)ࠋ
ዎ
⣙
•
ዎ⣙᪉ᘧ : (i) ࣛ࢖ࢭࣥࢫዎ⣙; (ii) ࢧ࣮ࣅࢫዎ⣙; (iii) ฼┈ศ㓄ዎ⣙; (iv) ⏕⏘ศ୚ዎ⣙;
ཪࡣ (v) ࡑࢀࡽࡢ」ྜዎ⣙
•
㸦 ᅜᐙⅣ໬Ỉ⣲ጤဨ఍㸦CNH㸧ࢆ௓ࡋ࡚㸧ᅜࡀẸ㛫஦ᴗ⪅ཪࡣ≉ู┠ⓗ఍♫㸦SPE㸧
࡜ࡢ㛫࡛⥾⤖
•
ዎ⣙࡟㛵㐃ࡍࡿ㈨※Ⓩ㘓ࡢྍ⬟ᛶ
•
኱࡞ዎ⣙㐪཯ ᇶ ࡃ⾜ᨻⓗᡭ⥆
ࡿዎ⣙⤊஢ࠋᅜ㝿௰⿢
ࡿࠋ
㔜኱࡞ዎ⣙㐪཯࡟ᇶ࡙ࡃ⾜ᨻⓗᡭ⥆࡟ࡼࡿዎ⣙⤊஢ࠋᅜ㝿௰⿢࡟ࡼࡿࠋ
•
ᅜࡢ┤᥋ཧຍ: (i) ඹྠ༊⏬; (ii) ᢏ⾡⛣㌿ࡢಁ㐍; (iii) ≉ᐃ┠ⓗ఍♫ࢆ௓ࡋࡓ⤒῭ⓗᣢศ
࡟ࡼࡿཧຍࠋ (ii)ཬࡧ(iii)࡛ࡣࠊ᭱኱30%ࡢཧຍࡀ☜❧ࡉࢀࡿࡇ࡜࡜࡞ࡿࠋ
•
᥇᥀ᶒ⪅ࡣࠊධᮐᡭ⥆࡟ࡼࡿࡇ࡜࡞ࡃࠊ᪤࡟⏕⏘ࡀ㛤ጞࡉࢀ࡚࠸ࡿⅣ㖔࠿ࡽ⏘ฟࡉࢀ
᥇᥀ᶒ⪅ࡣ
ධᮐᡭ⥆࡟ࡼࡿࡇ࡜࡞ࡃ ᪤࡟⏕⏘ࡀ㛤ጞࡉࢀ࡚࠸ࡿⅣ㖔࠿ࡽ⏘ฟࡉࢀ
ࡿⅣᒙ࣓ࢱࣥࢆᢳฟࡍࡿዎ⣙ࢆྲྀᚓࡍࡿࡇ࡜࡜࡞ࡿࠋ
㉺ቃⅣ໬Ỉ⣲㈨※
•
㉺ቃ㈨※ࡀᏑᅾࡍࡿሙྜ SPEࡀ᭱ప20%ཧຍࡍࡿࡇ࡜࡜࡞ࡿ
㉺ቃ㈨※ࡀᏑᅾࡍࡿሙྜࠊSPEࡀ᭱ప20%ཧຍࡍࡿࡇ࡜࡜࡞ࡿࠋ
•
☜ᐃࡋࡓ㉺ቃ㈨※࡟ࡘ࠸࡚ࡣࠊᅜ㝿᮲⣙ࡀ㐺⏝ࡉࢀࡿࠋ
12
ዎ⣙᪉ᘧࡈ࡜ࡢ఍ィ㡯┠
⏕⏘ศ୚
฼┈ศ㓄
ࣛ࢖ࢭࣥࢫ
ዎ⣙
ἲே⛯
‫ݱ‬
‫ݱ‬
‫ݱ‬
ୖᒙࡢ㈤ᩱ
‫ݱ‬
‫ݱ‬
‫ݱ‬
ᅜ⛯ཬࡧᆅ᪉⛯
‫ݱ‬
‫ݱ‬
‫ݱ‬
ᇶᮏࣟ࢖ࣖࣝࢸ࢕
‫ݱ‬
‫ݱ‬
‫ݱ‬
Signature ࣮࣎ࢼࢫ
x
x
‫ݱ‬
‫ݱ‬
㸦⌧≀⤥௜㸧
‫ݱ‬
㸦⌧㔠㸧
‫ݱ‬
㸦⌧㔠㸧
‫ݱ‬/x
‫ݱ‬
x
‫ݱ‬
‫ݱ‬
‫ݱ‬
⤒῭ኚᩘ
㸦ᅜ࡬ࡢᨭᡶ㸧
ࢥࢫࢺᅇ཰
ㄪᩚ࣓࢝ࢽࢬ࣒
௜୚ࡉࢀࡿኚᩘࡣ⤒῭ⓗᛶ᱁ࢆ᭷ࡋࠊᅜᐙࡢṓධࢆ᭱኱໬ࡍࡿࡇ࡜࡜࡞
௜୚ࡉࢀࡿኚᩘࡣ⤒῭ⓗᛶ᱁ࢆ᭷ࡋ
ᅜᐙࡢṓධࢆ᭱኱໬ࡍࡿࡇ࡜࡜࡞
ࡿࠋ
13
FISCAL ELEMENTS BY CONTRACT TYPE
Awarding
A
di variables
i bl will
ill h
have an economic
i nature,
t
tto maximize
i i th
the St
State’s
t ’
revenue.
14
ROUND ZERO & FARM OUTS
•
On August 13, 2014, the Ministry of Energy published a list of the exploration
areas and producing fields that will continue to be developed by Pemex:
a. 120 assignments to Pemex, consisting of 71 percent of the company's current oil production
and 73 percent of the company's
company s current natural gas production;
b. 12.45 million barrels oil equivalent of proven reserves, which are almost all reserves that
Pemex requested;
c. 20.6 million barrels oil equivalent of prospective resources, which is 67 percent of the
reserves that Pemex requested.
requested
•
Pemex announced the “Farm – Out” of a number of the blocks that were assigned to it in Round
Zero.
ࣛ࢘ࣥࢻ࣭ࢮࣟ & ࣇ࢓࣮࣒࣭࢔࢘ࢺ
•
2014ᖺ8᭶13᪥ࠊ࢚ࢿࣝࢠ࣮┬ࡣࠊPemex࡟ࡼࡗ࡚㛤Ⓨࡀ⥅⥆ࡋ࡚࡞ࡉࢀࡿ
ࡇ࡜࡜࡞ࡿ᥈㖔༊⏬ཬࡧ⏕⏘༊⏬ࡢࣜࢫࢺࢆබ⾲ࡋࡓࠋ
a. Pemex࡟๭ᙜ࡚ࡽࢀࡓ120ࡢ༊⏬ࠋᙜヱ఍♫ࡢ⌧ᅾࡢ▼Ἔ⏕⏘ࡢ71㸣ཬࡧኳ↛࢞ࢫ⏕⏘ࡢ
73㸣ࢆᵓᡂ
b. 12.45ⓒ୓ࣂࣞࣝ┦ᙜࡢ▼Ἔྍ᥇㈨※ࠋPemexࡀせồࡋ࡚࠸ࡓ㈨※ࡢ࡯࡜ࢇ࡝඲࡚
c. 20.6ⓒ୓ࣂࣞࣝ┦ᙜࡢ▼Ἔ᝿ᐃ㈨※ࠋPemexࡀせồࡋ࡚࠸ࡓ㈨※ࡢ67㸣
•
Pemexࡣࠊࣛ࢘ࣥࢻࢮࣟ࡟࠾࠸࡚๭ᙜ࡚ࡽࢀࡓከࡃࡢ༊⏬࡟ࡘ࠸࡚
Pemexࡣ
ࣛ࢘ࣥࢻࢮࣟ࡟࠾࠸࡚๭ᙜ࡚ࡽࢀࡓከࡃࡢ༊⏬࡟ࡘ࠸࡚“ࣇ࢓࣮࣒࣭࢔࢘ࢺ”
ࣇ࢓ ࣒࣭࢔࢘ࢺ ࢆⓎ⾲ࡋ
ࡓࠋ
16
ROUND ONE – SHALLOW WATERS •
On December 11, 2014, the CNH announced the first call for bids to participate in
the Round One auction of oil and gas properties in Mexico.
•
Round One will offer 169 blocks for auction, of which 109 will be exploration projects and 60 will
b d
be
development
l
projects.
j
Th
The first
fi blocks
bl k to b
be offered
ff d ffor auction
i are 14 shallow
h ll
water bl
blocks.
k
•
Mexican and foreign companies (including state productive companies) may participate,
individually or in consortium and may submit bids for multiple blocks . However, no member of
th consortium
the
ti
may have
h
e a greater
t participation
ti i ti percentage
t
than
th the
th Operator,
O
t no Company
C
may take part in more than one consortium and Large-Scale Oil Companies may not associate
with other Large-Scale Oil Companies.
•
Companies or consortia may submit Bids for up to five blocks in the Bidding Process
Process.
•
Interested Party must pay the following fees:
a) 5,300,000.00 pesos to access the Data Room
b) 280
280,000.00
000 00 pesos for Registration
ࣛ࢘ࣥࢻ࣭࣡ࣥ – ὸᾏᇦ •
2014ᖺ12᭶11᪥ࠊCNHࡣ࣓࢟ࢩࢥ࡟࠾ࡅࡿ▼Ἔཬࡧ࢞ࢫࡢࣛ࢘ࣥࢻ࣭࣡ࣥࡢ
ࡧ࢞
ࢻ
࣮࢜ࢡࢩࣙࣥ࡟ཧຍࡍࡿࡓࡵࡢ᭱ึࡢධᮐ࡟ࡘ࠸࡚Ⓨ⾲ࢆ⾜ࡗࡓࠋ
•
ࣛ࢘ࣥࢻ࣭࡛࣡ࣥࡣࠊ169༊⏬ࡀ࣮࢜ࢡࢩࣙࣥ࡟౪ࡉࢀࡿࡇ࡜࡜࡞ࡾࠊࡑࡢෆࡢ109༊⏬ࡀ᥈㖔
ࣉ ࢪ ࢡࢺ ࠶ࡾ ṧ ࡾ60ࡀ㛤Ⓨࣉࣟࢪ࢙ࢡࢺ࡛࠶ࡿࠋ᭱ึࡢ࣮࢜ࢡࢩࣙࣥ࡟౪ࡉࢀࡿ༊⏬
ࣉࣟࢪ࢙ࢡࢺ࡛࠶ࡾࠊṧ
ࡾ60ࡀ㛤Ⓨࣉ ࢪ ࢡࢺ ࠶ࡿ ᭱ึࡢ࢜ ࢡࢩ
࡟౪ࡉࢀࡿ༊⏬
ࡣ14 ὸᾏᇦ࡛࠶ࡿࠋ
•
࣓࢟ࢩࢥࡢ఍♫ཬࡧእᅜ఍♫ (ᅜႠ⏕⏘఍♫ࢆྵࡴࠋ) ࡣࠊ༢⊂ཪࡣඹྠ࡛ཧຍࡍࡿࡇ࡜ࡀ࡛ࡁࠊ
」ᩘࡢ༊⏬࡟ࡘ࠸࡚ධᮐࢆ⾜࠺ࡇ࡜ࡀ࡛ࡁࡿ ణࡋ
」ᩘࡢ༊⏬࡟ࡘ࠸࡚ධᮐࢆ⾜࠺ࡇ࡜ࡀ࡛ࡁࡿࠋణࡋࠊࢥࣥࢯ࣮ࢩ࢔࣒ࡢྛ஦ᴗ⪅ࡢᣢศ๭ྜࡣ࢜
ࣥࢯ ࢩ࢔࣒ࡢྛ஦ᴗ⪅ࡢᣢศ๭ྜࡣ࢜
࣮࣌ࣞࢱ࣮ࡢᣢศࢆ㉸࠼࡞࠸ࡇ࡜ࠊ」ᩘࡢࢥࣥࢯ࣮ࢩ࢔࣒࡬ࡣཧຍࡋ࡞࠸ࡇ࡜ࠊཬࡧ኱つᶍ▼Ἔ
఍♫ࡣ௚ࡢ኱つᶍ▼Ἔ఍♫࡜ࡢඹྠ஦ᴗࢆ⾜ࢃ࡞࠸ࡇ࡜ࡀᚲせ࡛࠶ࡿࠋ
•
఍♫ཪࡣඹྠ஦ᴗ⪅ࡣධᮐᡭ⥆࡛5༊⏬ࡲ࡛ධᮐࢆ⾜࠺ࡇ࡜ࡀ࡛ࡁࡿ
఍♫ཪࡣඹྠ஦ᴗ⪅ࡣධᮐᡭ⥆࡛5༊⏬ࡲ࡛ධᮐࢆ⾜࠺ࡇ࡜ࡀ࡛ࡁࡿࠋ
•
ᙜ஦⪅ࡣࠊ௨ୗࡢ㈝⏝ࢆᨭᡶࢃ࡞ࡅࢀࡤ࡞ࡽ࡞࠸ࠋ
a)
ࢹ࣮ࢱ࣭࣮࣒ࣝ࡬ࡢ࢔ࢡࢭࢫ
5,300,000.00 ࣌ࢯ
b)
Ⓩ㘓
280,000.00 ࣌ࢯ
ROUND ONE – PREQUALIFICATION
Technical Capabilities
1. Verifiable experience as Operator during the period 2010-2014, regardless of whether the project
started before or ended within this period:
a) At least three Exploration & Production (E&P) projects,
projects or
b) Capital investments, in E&P projects of at least one billion dollars in the aggregate.
2. Demonstrate it has been the operator in at least one offshore exploration and extraction project or
has participated, as partner, in at least two offshore E&P projects in the past five years.
3. Proposed personnel for key management positions has at least 10 years of experience in managing
offshore E&Pprojects.
4. Must demonstrate it has experience in the areas of industrial safety and environmental protection
d i th
during
the pastt fi
five years.
Financial Capabilities
1. Prove a net worth of at least one billion dollars or prove that it has: total assets of at least ten billion
dollars, and an investment-grade credit rating according to any major rating agency.
2. Additional Criterion in the case of Consortiums:
a) Consortium must prove a net worth of at least one billion dollars, this amount must be achieved
with equity of no more than three members of the Consortium
b) Operator must prove a net worth of at least 600 million dollars, and must own at least one third of
the economic interests in the Consortium
19
ࣛ࢘ࣥࢻ࣭࣡ࣥ – ஦๓㈨᱁ᑂᰝ
ᢏ⾡ⓗ⬟ຊ
1. 2010ᖺ࠿ࡽ2014ᖺࡲ࡛ࡢ㛫࡟࠾ࡅࡿ࣮࢜࣌ࣞࢱ࣮࡜ࡋ࡚ࡢ❧ドྍ⬟࡞⤒㦂ࠋࣉࣟࢪ࢙ࢡࢺࡀᙜヱ
ᮇ㛫ࡢ๓࡟㛤ጞཪࡣᮇ㛫୰࡟⤊஢ࡋࡓ࠿ࡣၥࢃ࡞࠸ࠋ
a) ᑡ࡞ࡃ࡜ࡶ3௳ࡢ ᥈ᰝ
᥈ᰝ࣭⏕⏘㸦E&P㸧
⏕⏘㸦E&P㸧 ࣉࣟࢪ࢙ࢡࢺࠊཪࡣ
ࣉࣟࢪ࢙ࢡࢺ ཪࡣ
b) ⥲ィ10൨ࢻࣝ௨ୖࡢ E&P ࣉࣟࢪ࢙ࢡࢺ࡬ࡢᢞ㈨
2. 㐣ཤ5ᖺ㛫ࠊ᭱ప1௳ࡢᾏὒ᥈ᰝ࣭᥇᥀ࣉࣟࢪ࢙ࢡࢺ࡛࣮࢜࣌ࣞࢱ࣮ࢆົࡵࡓࡇ࡜ࠊཪࡣ᭱ప2௳ࡢ
ᾏὒ E&P ࣉࣟࢪ࢙ࢡࢺ࡛ࣃ࣮ࢺࢼ࣮࡜ࡋ࡚ཧຍࡋ࡚࠸ࡓࡇ࡜ࢆ❧ドࡍࡿࡇ࡜ࠋ
3. 㔜せ࡞⟶⌮࣏ࢪࢩࣙࣥ࡟ࡘࡃணᐃࡢᢸᙜ⪅ࡣࠊᾏὒ E&P ࣉࣟࢪ࢙ࢡࢺࡢ⟶⌮⤒㦂ࢆ᭱ప10ᖺ௨ୖ
᭷ࡍࡿࡇ࡜ࠋ
4. ୖグࡢ⪅ࡀࠊ㐣ཤ5ᖺ㛫࡟⏘ᴗᏳ඲ཬࡧ⎔ቃಖㆤ࡟㛵ࡍࡿᐇົ⤒㦂ࢆ᭷ࡍࡿࡇ࡜ࢆ❧ドࡍࡿࡇ࡜ࠋ
㈈ົ⬟ຊ
1. ᭱ప10൨ࢻࣝࡢ⣧㈨⏘ࠊཪࡣࠊ᭱ప100൨ࢻࣝࡢ⥲㈨⏘ཬࡧ୺せ࡞᱁௜ᶵ㛵࡟ࡼࡿᢞ㈨㐺᱁᱁௜ࢆ
᭷ࡍࡿࡇ࡜ࡢド᫂
2. ࢥࣥࢯ࣮ࢩ࢔࣒ࡢሙྜ࡟࠾ࡅࡿ㏣ຍⓗࢡࣛ࢖ࢸࣜ࢔
a) ࢥࣥࢯ࣮ࢩ࢔࣒ࡢ⣧㈨⏘ࡣ᭱ప10൨ࢻ࡛ࣝ࠶ࡿࡇ࡜ࢆ❧ドࡋ࡞ࡅࢀࡤ࡞ࡽࡎࠊᙜヱ㢠ࡣࢥࣥࢯ࣮
ࢩ࢔࣒ࡢ࠺ࡕ࡛᭱኱3♫ࡢᣢศ࡟ࡼࡗ࡚㐩ᡂࡉࢀ࡞ࡅࢀࡤ࡞ࡽ࡞࠸ࠋ
b) ࣮࢜࣌ࣞࢱ࣮ࡣ᭱ప6൨ࢻࣝࡢ⣧㈨⏘ࢆ᭷ࡋࠊ࠿ࡘࠊࢥࣥࢯ࣮ࢩ࢔࣒ࡢ⤒῭ⓗᣢศࡢ᭱ప3ศࡢ1
ࢆ᭷ࡋ࡚࠸࡞ࡅࢀࡤ࡞ࡽ࡞࠸ࠋ
20
ROUND ONE – BIDDING PROCESS-
21
ࣛ࢘ࣥࢻ࣭࣡ࣥ – ධᮐᡭ⥆-
22
ROUND ONE – THE PRODUCTION SHARING E & P CONTRACT •
P fi allocation:
Profit
ll
i
•
State
Consideration
•
•
Contractor
Consideration
•
•
Contractual Fee during the Exploratory Phase
(1,150 pesos /km2 during the first 60 months and 2,750 pesos /km2 for the subsequent
months);
th )
Royalties
(rate for each type of Hydrocarbon produced during the Month), and
____% of the Operating Profit for such Month.
Recoverable Costs Reimbursement (that may not be grater than 60% of the Contractual
Value of the Hydrocarbons in said Month), and
___ % off th
the O
Operating
ti P
Profit
fit ffor such
hM
Month.
th
The Mexican Petroleum Fund for Stabilization and Development shall determine the State
Consideration
C
id ti and
d th
the C
Contractor
t t C
Consideration
id ti ffor each
hM
Month
th b
based
d on th
the iinformation
f
ti
relating to production, quality and other data it receives from the Contractor and CNH.
•
Contractor will carry out exploration and extraction at its own risk and will begin receiving payments
only
l when
h production
d ti starts.
t t
•
Contract establishes minimum percentage of local content as well as the work program that needs to
be fulfilled on a yearly basis.
23
ࣛ࢘ࣥࢻ࣭࣡ࣥ – ⏕⏘ศ୚E & Pዎ⣙ •
฼┈ศ㓄
฼┈ศ㓄:
•
•
ᅜ࡬ࡢ
ᑐ౯
•
ዎ⣙ᙜ஦⪅ࡢ
ᑐ౯
•
•
ዎ⣙ሗ㓘 ᥈㖔ࣇ࢙࣮ࢬࡢ㛫
(᭱ึࡢ60࢝᭶ 1,150࣌ࢯ /ᖹ᪉࢟ࣟ ཬࡧ ࡑࡢᚋࡢ᭶㢠 2,750࣌ࢯ /ᖹ᪉࢟ࣟ);
ࣟ࢖ࣖࣝࢸ࢕࣮
࢖ࣖ ࢸ
(᭶ẖ࡟⏕⏘ࡋࡓⅣ໬Ỉ⣲ࡢࡑࢀࡒࢀࡢࢱ࢖ࣉ࡟ᛂࡌࡓ࣮ࣞࢺ)
ᙜヱ᭶࡟࠾ࡅࡿႠᴗ฼┈ࡢ____%
ᅇ཰ྍ⬟ཎ౯ࡢൾ㑏 ( ణࡋࠊᙜヱ᭶࡟࠾ࡅࡿⅣ໬Ỉ⣲ࡢዎ⣙ୖࡢホ౯㢠ࡢ60%ࢆୖᅇࡽ
࡞࠸ࡇ࡜)
ᙜヱ᭶࡟࠾ࡅࡿႠᴗ฼┈ࡢ___㸣
Mexican Petroleum Fund for Stabilization and Developmentࡀࠊዎ⣙ᙜ஦⪅ཬࡧCNH࠿ࡽධ
ᡭࡋࡓ⏕⏘ࠊᛶ㉁ࡑࡢ௚ࡢࢹ࣮ࢱ࡟ᇶ࡙ࡁࠊẖ᭶ࡢᅜ࡬ࡢᑐ౯ཬࡧዎ⣙ᙜ஦⪅࡬ࡢᑐ౯ࢆỴ
ᐃࡍࡿࡇ࡜࡜࡞ࡿࠋ
ᐃࡍࡿࡇ࡜࡜࡞ࡿ
•
ዎ⣙ᙜ஦⪅ࡣ⮬ᕫࡢ㈐௵࡟࡚᥈㖔ཬࡧᢳฟࢆ⾜࠸ࠊ⏕⏘άືࢆ㛤ጞࡋࡓሙྜ࡟ࡢࡳᨭᡶࢆཷ㡿ࡍࡿ
ࡇ࡜ࡀ࡛ࡁࡿࠋ
•
ዎ⣙࡟ࡣࠊ⌧ᆅㄪ㐩⋡ࡢ᭱ప㝈ᗘཬࡧᖺ㛫࣮࣋ࢫ࡛㐩ᡂࡍࡿࡇ࡜ࡀᚲせ࡞࣮࣡ࢡ࣭ࣉࣟࢢ࣒ࣛࢆつ
ᐃࡍࡿࠋ
24
ROUND ONE – THE PRODUCTION SHARING E & P CONTRACT -
25
ࣛ࢘ࣥࢻ࣭࣡ࣥ –⏕⏘ศ୚E & Pዎ⣙ -
࣭3ᖺࡢᮇ㝈ࠊ2ᖺࢆୖ㝈࡟
ᘏ㛗ྍ⬟
࣭᥈⣴ᮇ㛫
ၟᴗⓗ࡞Ⓨぢࡀ☜ㄆࡉࢀࡓሙ
ྜ㸸
࣭㛤Ⓨࣉࣛࣥ
‫ݱ‬᭱ప࣮࣡ࢡ࣭ࢥ࣑ࢵࢺ࣓ࣥ
ࢺ
‫ݱ‬ᐇ⾜ࡉࢀࡿ࡭ࡁάື
‫ݱ‬ᢏ⾡⛣㌿ࣉ ࢢ࣒ࣛ
‫ݱ‬ᢏ⾡⛣㌿ࣉࣟࢢ࣒ࣛ
‫ݱ‬ᢏ⾡⛣㌿ࣉ ࢢ࣒ࣛ
‫ݱ‬ᢏ⾡⛣㌿ࣉࣟࢢ࣒ࣛ
‫࣭ࢺ࣓ࣥࢪࢿ࣐࣭ࢡࢫࣜݱ‬
ࣉࣟࢢ࣒ࣛ
‫ݱ‬ᣑᙇࡉࢀࡓᅇ཰
ࣉࣟࢢ࣒ࣛ
࣭ᖺ㛫࣮࣡ࢡ࣭ࣉࣟࢢ࣒ࣛ
ᆅ㉁Ꮫⓗ࡞Ⓨぢࡀ☜ㄆࡉࢀࡓሙ
ྜࠊ2ࡘࡢホ౯ࣉࣟࢢ࣒ࣛ㸦12
࢝᭶ẖ㸧
‫࣭ࢺ࣓ࣥࢪࢿ࣐࣭ࢡࢫࣜݱ‬
ࣉࣟࢢ࣒ࣛ
࣭ᖺ㛫࣮࣡ࢡ࣭ࣉࣟࢢ࣒ࣛ
26
༊⏬ࡢᡂ⇍ᗘ
࡟ẚ౛ࡋࡓ
᪂つࡢᣑᙇࡉ
ࢀࡓᅇ཰ࣉࣟ
ࢢ࣒ࣛ
᪂つࡢᣑᙇࡉ
ࢀࡓᅇ཰ࣉࣟ
ࢢ࣒ࣛ࡟㛵ࡍ
ࡿ࢖ࣥ࣋ࢫࢺ
࣓ࣥࢺ࣭ࢥ
࣑ࢵࢺ࣓ࣥࢺ
ࡢ㏣ຍ
MIDSTREAM
27
࣑ࢵࢻࢫࢺࣜ ࣒
࣑ࢵࢻࢫࢺ࣮࣒ࣜ
28
REMEMBERING THE REGULATION
•
A Permit from the CRE is required for the transportation
transportation, storage,
storage distribution
distribution,
compression, liquefaction, and decompression of hydrocarbons, petroleum
resources, petrochemicals, and gas.
•
Permit holders who render transport and distribution services by means of pipelines to
third parties, as well as storage not for self use shall have the obligation to provide open
access, subject to the existence of available capacity in their systems in exchange for a
consideration regulated by the CRE.
•
The capacity reserves that are not contracted or used shall be put at the markets
disposition by means of an open season process.
•
Transport permit holders for natural gas through pipelines may not commercialize the
hydrocarbon.
•
Reduction of the State concentration in the commercialization market and pipeline
p
y to 50%
% in 5 yyears and 20%
% in 10 yyears.
capacity
•
A special permit scheme is established for the following activities:
Comisión Reguladora de Energía
(Energy Regulatory Commission)
Ministry of Energy
• Sale to the public of gasoline and
diesel.
• Transport, storage and distribution of
oil, natural gas, oil derivatives and
petrochemicals
h i l through
h
h pipelines.
i li
• Transport, storage and distribution of
LP gas by means of pipelines.
•
•
•
•
Sale to the public of LP gas.
Treatment and refinery of oil.
Processing natural gas.
Transport, storage and distribution of
LP gas through
h
h means other
h than
h
pipelines.
• Import and export of hydrocarbons.
29
ࣞࢠ࣮ࣗࣞࢩࣙࣥ࡟ࡘ࠸࡚
•
Ⅳ໬Ỉ⣲ࠊ▼Ἔ㈨※ࠊ▼Ἔ໬Ꮫ〇ရཬࡧ࢞ࢫࡢ㍺㏦ࠊ㈓ⶶࠊὶ㏻ࠊᅽ⦰ࠊ
Ⅳ໬Ỉ⣲
▼Ἔ㈨※ ▼Ἔ໬Ꮫ〇ရཬࡧ࢞ࢫࡢ㍺㏦ ㈓ⶶ ὶ㏻ ᅽ⦰
ᾮ໬ཬࡧ᚟ඖࢆ⾜࠺ࡓࡵ࡟ࡣࠊCREࡢチྍࡀᚲせ࡛࠶ࡿࠋ
•
ࣃ࢖ࣉࣛ࢖ࣥ࡟ࡼࡗ࡚➨୕⪅࡟㍺㏦࣭ὶ㏻ࢧ࣮ࣅࢫࢆᥦ౪ࡋࠊࡲࡓ㈓ⶶ㸦⮬ᕫ౑⏝ࡢࡓ
ࡵࡢࡶࡢࢆ㝖ࡃ 㸧ࢆ⾜࠺チྍಖ᭷⪅ࡣ ⮬⏤࡞࢔ࢡࢭࢫࢆᥦ౪ࡍࡿ⩏ົࢆ㈇࠺ ࡞࠾
ࡵࡢࡶࡢࢆ㝖ࡃࠋ㸧ࢆ⾜࠺チྍಖ᭷⪅ࡣࠊ⮬⏤࡞࢔ࢡࢭࢫࢆᥦ౪ࡍࡿ⩏ົࢆ㈇࠺ࠋ࡞࠾ࠊ
ࡑࢀࡽࡢࢩࢫࢸ࣒࡟฼⏝ྍ⬟࡞ᐜ㔞ࡀᏑᅾࡍࡿࡇ࡜ࡀ๓ᥦ࡜࡞ࡾࠊࡲࡓᑐ౯࡟ࡘ࠸࡚ࡣ
CRE࡟ࡼࡗ࡚つไࡉࢀࡿࠋ
•
ዎ⣙ཪࡣ౑⏝ࡢᑐ㇟࡜࡞ࡗ࡚࠸࡞࠸ணഛ㈨※ࡣࠊ࢜
ዎ⣙ཪࡣ౑⏝ࡢᑐ㇟࡜࡞ࡗ࡚࠸࡞࠸ணഛ㈨※ࡣ
࣮࢜ࣉ࣭ࣥࢩ࣮ࢬ࣭ࣥࣉࣟࢭࢫ࡟ࡼࡗ
ࣉࣥ ࢩ ࢬࣥ ࣉࣟࢭࢫ࡟ࡼࡗ
࡚ᕷሙ࡛ฎศࡉࢀࡿࠋ
•
ኳ↛࢞ࢫࡢࣃ࢖ࣉࣛ࢖ࣥ࡟ࡼࡿ㍺㏦ᴗチྍࡢಖ᭷⪅ࡣࠊⅣ໬Ỉ⣲ࢆྲྀᘬࡍࡿࡇ࡜ࡀ࡛ࡁ
࡞࠸ࠋ
•
ྲྀᘬᕷሙཬࡧࣃ࢖ࣉࣛ࢖ࣥᐜ㔞࡟࠾ࡅࡿᅜࡢ༨᭷⋡ࢆ5ᖺ࡛50㸣࡟ࠊ10ᖺ࡛20㸣࡟ῶᑡ
•
௨ୗࡢάື࡟ࡘ࠸࡚≉ู࡞チྍࢫ࣮࣒࢟ࡀタࡅࡽࢀࡿࠋ
Comisión Reguladora de Energía
㸦࢚ࢿࣝࢠ࣮つไጤဨ఍㸧
࢚ࢿࣝࢠ࣮┬
•࢞ࢯࣜࣥཬࡧࢹ࢕࣮ࢮࣝࡢᑠ኎ࡾ
•ࣃ࢖ࣉࣛ࢖ࣥ࡟ࡼࡿ▼Ἔࠊኳ↛࢞ࢫࠊ▼Ἔ
๪⏘ရࠊ▼Ἔ໬Ꮫ〇ရࡢ㍺㏦ࠊ㈓ⶶཬࡧὶ
㏻
•ࣃ࢖ࣉࣛ࢖ࣥ࡟ࡼࡿLP࢞ࢫࡢ㍺㏦ࠊ㈓ⶶཬ
ࡧὶ㏻
30
•LP࢞ࢫࡢᑠ኎ࡾ
•▼Ἔࡢฎ⌮ཬࡧ⢭〇
•ኳ↛࢞ࢫࡢฎ⌮
•ࣃ࢖ࣉࣛ࢖ࣥ௨እࡢᡭẁ࡟ࡼࡿLP࢞ࢫࡢ
㍺㏦ࠊ㈓ⶶཬࡧὶ㏻
Ⅳ໬Ỉ⣲ࡢ㍺ฟධ
•Ⅳ໬Ỉ⣲ࡢ㍺ฟධ
NATURAL GAS RELATED CONTRACTS CURRENTLY IN EFFECT
•
Contracts currently in effect entered into by Private Entities with Pemex, where Pemex is the majority
stakeholder, shall be transferred to CENAGAS (National Center for Gas Control).
•
In those Companies where Pemex participates as a minority stakeholder, Pemex participation interest will
be transferred to CENAGAS.
CENAGAS
•
Private Entities with a permit in effect prior to the new Hydrocarbons Law, will require to exchange the
permit for a new one in terms of the new Hydrocarbon Law, by December 31, 2015.
•
N
New
permits
it will
ill regulate
l t the
th Open
O
Season
S
framework
f
k as wellll as other
th ttechnical
h i l and
d economical
i l
requirements. Prior to such date, they may continue rendering the services for which they have a permit.
31
⌧ᅾຠຊࢆ᭷ࡍࡿኳ↛࢞ࢫ㛵㐃ዎ⣙
•
Pemexࡀ࣐ࢪࣙࣜࢸ࢕ฟ㈨⪅࡜࡞ࡗ࡚࠸ࡿࠊPemex࡜Ẹ㛫஦ᴗ⪅࡜ࡢ㛫࡛⥾⤖ࡉࢀࡓ⌧ᅾ᭷ຠ࡞ዎ⣙ࡣࠊ
CENAGAS (National Center for Gas Control)࡟⛣㌿ࡉࢀࡿࠋ
•
Pemexࡀ࣐࢖ࣀࣜࢸ࢕ฟ㈨⪅࡜ࡋ࡚ཧධࡋ࡚࠸ࡿ఍♫࡟ࡘ࠸࡚ࡣࠊPemexࡢᣢศࡣ CENAGAS࡟⛣㌿ࡍࡿࠋ
•
᪂Ⅳ໬Ỉ⣲ἲࡼࡾ๓࡟ຠຊࢆ᭷ࡍࡿチྍࢆ᭷ࡍࡿẸ㛫஦ᴗ⪅ࡣࠊᙜヱチྍ࡜᪂ἲ࡟ᇶ࡙ࡃ᪂ࡓ࡞チྍ࡜ࢆ
2015ᖺ12᭶31᪥ࡲ࡛࡟஺᥮ࡍࡿࡇ࡜ࢆồࡵࡽࢀࡿࠋ
•
᪂ࡓ࡞チྍࡣࠊࡑࡢ௚ࡢᢏ⾡ୖཬࡧ⤒῭ୖࡢせ௳ࡢ௚ࠊ࣮࢜ࣉ࣭ࣥࢩ࣮ࢬ࣭ࣥࣇ࣮࣒࣮ࣞ࣡ࢡࢆつไࡍࡿ
ࡶࡢ࡛࠶ࡿ ᙜヱ᪥๓ࡲ࡛ࡣ Ẹ㛫஦ᴗ⪅ࡣ ⌧≧᭷ࡋ࡚࠸ࡿチྍ࡟ᇶ࡙ࡃࢧ ࣅࢫࢆᥦ౪ࡋ⥆ࡅࡿࡇ࡜
ࡶࡢ࡛࠶ࡿࠋᙜヱ᪥๓ࡲ࡛ࡣࠊẸ㛫஦ᴗ⪅ࡣࠊ⌧≧᭷ࡋ࡚࠸ࡿチྍ࡟ᇶ࡙ࡃࢧ࣮ࣅࢫࢆᥦ౪ࡋ⥆ࡅࡿࡇ࡜
ࡀ࡛ࡁࡿࠋ
32
Projects announced by CFE
CFE࡟ࡼࡗ࡚බ⾲ࡉࢀࡓࣉࣟࢪ࢙ࢡࢺ
DOWNSTREAM
35
ࢲ࢘ࣥࢫࢺࣜ ࣒
ࢲ࢘ࣥࢫࢺ࣮࣒ࣜ
36
REMEMBERING THE REGULATION
•
Permission is not required for the commercialization of hydrocarbons, liquefied
petroleum gas,
gas petroleum resources,
resources and petrochemicals
petrochemicals, including the sale of
gasoline and diesel fuel. Nevertheless, prices shall be regulated by the SHCP
through 2020.
•
Permission for selling gasoline and diesel fuel to the public may be granted by
the CRE after January 1, 2017. After this date, PEMEX may not subject the
supply of gasoline and diesel fuel to the condition of entering into franchise
agreements.
•
Until December 31, 2018, permission to import gasoline and diesel fuel shall
be granted only to PEMEX. On and after January 1, 2019, permission may be
granted to anyone capable of fulfilling the requirements established by the
Hydrocarbons Law.
•
Transition period for price deregulation, which will extend until January 10,
2020. As explained in the following slide.
37
ࣞࢠ࣮ࣗࣞࢩࣙࣥ࡟ࡘ࠸࡚
•
࢞ࢯࣜࣥཬࡧࢹ࢕࣮ࢮࣝ⇞ᩱࡢ㈍኎ࢆྵࡴࠊⅣ໬Ỉ⣲ࠊᾮ໬▼Ἔ࢞ࢫࠊ▼Ἔ
㈨※ཬࡧ▼Ἔ໬Ꮫ〇ရࡢၟᴗ໬࡟ࡣチྍࡣせồࡉࢀ࡚࠸࡞࠸ࠋ ణࡋࠊ౯᱁࡟
㈨※ཬࡧ▼Ἔ໬Ꮫ〇ရࡢၟᴗ໬࡟ࡣチྍࡣせồࡉࢀ࡚࠸࡞࠸
ణࡋ ౯᱁࡟
ࡘ࠸࡚ࡣSHCP࡟ࡼࡗ࡚2020ᖺࡲ࡛つไࡀ࡞ࡉࢀࡿࠋ
•
࢞ࢯࣜࣥཬࡧࢹ࢕࣮ࢮࣝ⇞ᩱࡢᑠ኎チྍࡣࠊ2017ᖺ1᭶1᪥௨㝆ࠊCRE࡟ࡼࡗ
࡚୚࠼ࡽࢀࡿࡇ࡜࡜࡞ࡿࠋࡇࡢ᪥௨㝆ࠊPEMEXࡣࠊ࢞ࢯࣜࣥཬࡧࢹ࢕࣮ࢮࣝ
࡚୚࠼ࡽࢀࡿࡇ࡜࡜࡞ࡿࠋࡇࡢ᪥௨㝆ࠊPEMEXࡣࠊ࢞ࢯࣜࣥཬࡧࢹ࢕
ࢮࣝ
⇞ᩱࡢ౪⤥ࢆࣇࣛࣥࢳࣕ࢖ࢬዎ⣙⥾⤖ࡢ᮲௳࡜ࡉࡏࡿࡇ࡜ࡀ࡛ࡁ࡞ࡃ࡞ࡿࠋ
•
2018ᖺ12᭶31᪥ࡲ࡛ࠊ࢞ࢯࣜࣥཬࡧࢹ࢕࣮ࢮࣝ⇞ᩱࡢ㍺ධチྍࡣPEMEXࡢ
ࡳ࡟ᑐࡋ࡚୚࠼ࡽࢀࡿࠋ2019ᖺ1᭶1᪥௨㝆ࠊチྍࡣⅣ໬Ỉ⣲ἲ࡟つᐃࡉࢀࡓ
᮲௳ࢆ‶ࡓࡍ඲࡚ࡢ⪅࡟ᑐࡋ࡚୚࠼ࡽࢀࡿࡇ࡜࡟࡞ࡿࠋ
•
౯᱁⮬⏤໬ࡢ⛣⾜ᮇ㛫ࡣ2020ᖺ1᭶10᪥ࡲ࡛ᘏ㛗ࡉࢀࡿࠋḟࡢࢫࣛ࢖ࢻ࡟࡚ㄝ
᫂ࡍࡿ㏻ࡾࠋ
38
GRADUAL TRANSITION IN FUELS AND DIESEL
Maximumgasolineanddieselprices anditsincrease
pursuanttoinflation.
Controlled
PriceIncrease:
• 9centsforMagnaGasoline.
• 11centsforPremium
FreePrice
whichwill
reflectthe
market
conditions.
2019:FreeImports
Gasoline.
• 11centsfordiesel.
S l t th P bli diff
SaletothePublic:differentbrandstoPEMEX
t b d t PEMEX
2017onwards
I
Import:ReservedexclusivelytoPEMEX
t R
d
l i l t PEMEX
2014Ͳ2018
39
⇞ᩱཬࡧࢹ࢕࣮ࢮࣝࡢ₞㐍ⓗ⛣⾜
౯᱁ᘬୖࡆࡢ
࢞ࢯࣜࣥཬࡧࢹ࢕࣮ࢮࣝࡢ᭱
᭱㧗౯᱁୪ࡧ࡟࢖ࣥࣇ
࣮ࣞࢩࣙࣥ࡟ࡼࡿ౯᱁ୖ᪼
ᕷሙ≧ἣࢆ཯
౯᱁ࡢ
ᫎࡋࡓ౯
⮬⏤໬
ไ㝈 :
•
࣐ࢢࢼ࣭࢞ࢯࣜࣥ㸸9ࢭࣥࢺ
•
ࣉ࣑ࣞ࢔࣒࣭࢞ࢯࣜࣥ㸸11ࢭ
2019:㍺ධ⮬⏤໬
ࣥࢺ
•
ࢹ࢕࣮ࢮࣝ㸸11ࢭࣥࢺ
ᑠ኎ࡾ:PEMEX࡜ࡣ␗࡞ࡿࣈࣛࣥࢻ
2017௨㝆
㍺ධ PEMEXࡀ⊂༨ⓗ࡟ᶒ฼ࢆ᭷ࡍࡿ
㍺ධ:PEMEXࡀ⊂༨ⓗ࡟ᶒ฼ࢆ᭷ࡍࡿࠋ
2014Ͳ2018
40
ELECTRIC POWER
41
㟁
ຊ
42
REMEMBERING THE REGULATION
•
M i
Mexican
government will
ill maintain
i i the
h exclusivity
l i i off the
h national
i
l electric
l
i
transmission system, ensuring access for all electric power producers
•
Planning and control of the national electricity system, and the transmission and
distribution of electricity as a public service, will continue to be governed by the
state.
•
The State maintains exclusivity over nuclear power production.
•
Generation and commercialization of electric power open to private investment.
•
Creation of a Wholesale Electricity Market for the commercialization of:
a) Electricity,
Electricity
b) Related services,
c) Potency or any other product that guarantees the sufficiency of resources to
satisfy
ti f demand
d
d ffor electricity,
l t i it
d) Import or export of the above mentioned products,
e) Financial rights regarding transmission,
f)
Clean energy certificates, and
g) Any other products required for the operation of the national electric system.
43
ࣞࢠ࣮ࣗࣞࢩࣙࣥ࡟ࡘ࠸࡚
•
࣓࢟ࢩࢥᨻᗓࡣࠊ඲࡚ࡢⓎ㟁஦ᴗ⪅ࡢ࢔ࢡࢭࢫࢆ☜ಖࡍࡿࡓࡵࠊᅜ᭷㟁㏦ࢩࢫࢸ࣒
࣓࢟ࢩ
ᨻᗓࡣ ඲ ࡢⓎ㟁஦ᴗ⪅ࡢ ࢡࢭ ࢆ☜ಖࡍࡿࡓࡵ ᅜ᭷㟁㏦ࢩ ࢸ࣒
ࡢ⊂༨ᶒࢆ᭷ࡍࡿࠋ
•
ᅜ᭷㟁ຊࢩࢫࢸ࣒ࡢ௻⏬࣭⟶⌮ཬࡧබඹ஦ᴗ࡜ࡋ࡚ࡢ㏦㟁ࡣࠊᘬࡁ⥆ࡁᅜ࡟ࡼࡗ࡚
⟶⌮ࡉࢀࡿࡇ࡜࡜࡞ࡿࠋ
⟶⌮ࡉࢀࡿࡇ࡜࡜࡞ࡿ
•
ᅜࡣཎᏊຊⓎ㟁࡟ࡘ࠸࡚ࡶ⊂༨ᶒࢆ᭷ࡋ࡚࠸ࡿࠋ
•
㟁ຊࡢ⏕⏘ཬࡧၟᴗ໬࡟ࡘ࠸࡚ࡣẸ㛫஦ᴗ⪅࡟ᕷሙࡀ㛤࠿ࢀ࡚࠸ࡿࠋ
•
ၟᴗ໬ࢆ┠ⓗ࡜ࡋࡓࠊ௨ୗࡢ㟁ຊ༺኎ᕷሙࡢ๰タ
a) 㟁ຊ
b) 㛵㐃ࢧ
㛵㐃ࢧ࣮ࣅࢫ
ࣅࢫ
c) 㟁ຊ㟂せࢆ‶ࡓࡍࡓࡵ࡟༑ศ࡞㈨※ࢆ☜ಖࡍࡿࡓࡵࡢ㟁ຊཪࡣࡑࡢ௚ࡢ〇ရ
d) ୖグ〇ရࡢ㍺ฟධ
e) ㏦㟁࡟㛵ࡍࡿ㈈ົୖࡢᶒ฼
f)
ࢡ࣮࣭࢚ࣜࣥࢿࣝࢠ࣮ド᫂᭩, ཬࡧ
g) ᅜ᭷㟁ຊࢩࢫࢸ࣒ࡢ㐠Ⴀ࡟㝿ࡋ࡚せồࡉࢀࡿࡑࡢ௚ࡢ〇ရ
44
Projects announced by CFE
45
CFE࡟ࡼࡗ࡚බ⾲ࡉࢀࡓࣉࣟࢪ࢙ࢡࢺ
46
Projects announced by CFE
CFE࡟ࡼࡗ࡚බ⾲ࡉࢀࡓࣉࣟࢪ࢙ࢡࢺ
48
Thank You!
If you have any question, please contact:
Scott Schwind
Jones Day - Houston
[email protected]
1.832.239.3710
Alberto de la Parra
Jones Day - Mexico City
d l
@j
d
[email protected]
52.55.3000.4087
Stephen J. DeCosse
Jones Day - Tokyo
[email protected]
81.3.6800.1819
Disclaimer
The views expressed by a speaker at the seminar or contained in this presentation material are those of such individual’s own, and do not
reflect the views of the Firm.
Firm This presentation material is prepared for the sole purpose of explanation of the subject matters of this seminar,
seminar and
is not intended to provide, and should not be deemed to constitute, legal advice on any specific facts or circumstances. This presentation material
is protected by the copyright law, and may not duplicated, quoted, modified, translated or distributed without the prior consent of the Firm.
©2015 JONES DAY, All Rights Reserved.
49
㐃⤡ඛ
䝇䝁䝑䝖䞉䝅䝳䜴䜱䞁䝗
䝆䝵䞊䞁䝈䞉䝕䜲 䝠䝳䞊䝇䝖䞁
䜰䝹䝧䝹䝖䞉䝕䞉䝷䞉䝟䞊䝷
䝆䝵䞊䞁䝈䞉䝕䜲 䝯䜻䝅䝁䝅䝔䜱
[email protected]
sschwind@jonesday
com
1.832.239.3710
[email protected]
52.55.3000.4087
䝇䝔䞊䝤䞁䞉䝕䝁䝉
䝆䝵䞊䞁䝈䞉䝕䜲ᮾி
[email protected]
@j
y
81.3.6800.1819
ࡈὀព
ᮏ㈨ᩱ୰ࠊᮏࢭ࣑ࢼ࣮࡛ࡢⓎゝ࠾ࡼࡧᮏ㈨ᩱ୰ࡢពぢ࡟ࢃࡓࡿ㒊ศࡣࠊㅮ₇⪅ࡢಶேⓗぢゎ࡛࠶ࡾࠊᙜ஦ົᡤࡢពぢࢆ௦⾲ࡍࡿࡶࡢ
࡛ࡣ࠶ࡾࡲࡏࢇࠋ ᮏ㈨ᩱࡣࠊᮏࢭ࣑ࢼ࣮ࡢࢸ࣮࣐࡟ࡘ࠸࡚ࡢㄝ᫂⏝࡟సᡂࡉࢀࡓࡶࡢ࡛࠶ࡾࠊ≉ᐃࡢ஦ᐇࡸ஦᝟࡟㛵ࡍࡿᘚㆤኈࡢἲⓗ࡞
࢔ࢻࣂ࢖ࢫ࡜ࡣ࡞ࡾࡲࡏࢇ ᮏ㈨ᩱࡣⴭసᶒ࡟ࡼࡿಖㆤࡢᑐ㇟࡜࡞ࡾࡲࡍ ᙜ஦ົᡤࡢ஦๓ࡢチྍ࡞ࡃ 」〇 ㌿㍕ ኚ᭦ ⩻᱌ ⩻ヂ ෌
࢔ࢻࣂ࢖ࢫ࡜ࡣ࡞ࡾࡲࡏࢇࠋᮏ㈨ᩱࡣⴭసᶒ࡟ࡼࡿಖㆤࡢᑐ㇟࡜࡞ࡾࡲࡍࠋᙜ஦ົᡤࡢ஦๓ࡢチྍ࡞ࡃࠊ」〇ࠊ㌿㍕ࠊኚ᭦ࠊ⩻᱌ࠊ⩻ヂࠊ෌
㓄ᕸ➼ࢆࡍࡿࡇ࡜ࡣ࡛ࡁࡲࡏࢇࡢ࡛ࠊࡈὀពࡃࡔࡉ࠸ࠋ