MTA - NEW YORK CITY TRANSIT 2 BROADWAY NEW YORK, NY 10004 DIVISION OF MATERIEL web.mta.info/nyct/procure/nyctproc.htm [email protected] 0000060883 NOTICE -OFADDENDUM ADDENDUM # 1 BID OPENING/DUE DATE: 04/30/2014 2 Broadway New York, NY 10004 • Carmen Bianco President New York City Transit April 18, 2014 ADDENDUM NO.1 Contract No. IFB 60883 Maintenance & Repair of Carbon Monoxide Monitors TO ALL PROSPECTIVE BIDDERS: The Bid Opening Date has been postponedfrom April 24, 2014 to April 30, 2014. The following question was received and is being answered in this Addendum No.1, which becomes part of the Contract: Question: How were the estimated quantities calculated for the calibration and maintenance for the first three years ofthe Contract (650 times)? Answer: Calibration and maintenance services are performed once a month, each month, at all Authority locations with functional paint booths and carbon monoxide monitors. All bus depots with paint booths should have been included in the technical specification, but the following three depots were inadvertently omitted: Mother Clara Hale (NYC Transit Depot), Spring Creek and JFK (MTA Bus Depots.) Please see attached revised technical specification. In total, seventeen depots should be included resulting in an estimated 612 times a Contractor will need to service all carbon monoxide monitors for the first three years of the Contract (17 depots* 12 (once per month) *3 years.) The price schedule includes 38 extra hours in case paint booths are added to any other bus depot throughout the life of the Contract. Reminder: Be sure to acknowledge this Addendum in the place provided in the bid. Failure to do so may result in rejection of your bid. Sincerely, 11! lJ~k~ Miriam Davidovich Contract Specialist, Procurement MTA New York City Transit is an agency of the Metropolitan Transportation Authority, State of New York Addendum No.1 MAINTENANCE AND REPAIR OF CARBON MONOXIDE MONITORS: GFG RAM 50 & GFG RAM 4021 (Respiratory Air Monitors) TECHNICAL SPECIFICATIONS GENERAL The Contractor shall provide on-site monthly calibration/maintenance services and (as needed) repair services for the Carbon Monoxide monitors (Units), as indicated herein and in accordance with the Contract Documents. DESCRIPTION The Work activity for calibration/maintenance services shall include, but not be limited to, the overall decontamination of Carbon Monoxide (CO) gas monitors by aerosol spray cleaning agents, vacuum process and/or ultrasonic cleaning methods. The decontamination shall include cleaning and refurbishing of electrical contacts, connectors and components, condition assessment, fault analysis, and furnishing and installing replacement parts. The complete function checkout and calibration of the Unit shall be performed using certified reference standards for physical measurement quantities, such as various mixtures and concentrations of gases, and electrical parameters, comparisons with instruments known calibration, endurance burn in periods and other procedures as recommended by the Original Equipment Manufacturer(OEM). The Contractor shall perform all applicable tests to ensure the proper performance, integrity and reliability of all the Units being serviced. II II Prior to performing Work on any Unit, the Contractor shall ascertain the status of the OEM warranty provisions to afford the possibility of rendering services under warranty agreements in effect, if any, during the duration of the Contract. All Work shall be performed by factory qualified and OEM-authorized service technicians. All materials and equipment utilized in the repair and calibration services shall be of the highest quality and shall satisfy the OEM specifications. APPLICABLE STANDARDS All Unit calibration, inspection, maintenance and repair procedures shall comply with applicable Federal, New York State, New York City and other governing association codes, practices, rules, regulations, statutes, whichever is the most stringent, including but not limited to the following: 1. OSHA confined Space standard 29 CFR 1910.146 Appendix E. 2. OSHA respiratory protection standard 29 CFR 1910.134 3. ANSI Standard 2540.1, general requirements for Calibration and Testing Laboratories. 4. ANSI- S12.13 Performance requirements, Combustible Gas Detectors. 5. ANSI/UL 2034 Standard for Carbon Monoxide Alarm. 576968 Contract No. IFB 60883- ATTACHMENT 1 1 Addendum No.1 GFG RAM 50 & GFG RAM 4021 (Respiratory Air Monitors) SPECIFICATIONS 1. The Contractor shall perform monthly calibration/maintenance services, which includes inspection and calibration of all Carbon Monoxide gas monitors, per the OEM's most recent technical specifications at the locations listed in Item No 2. In addition as part of these monthly calibration/maintenance services, the Contractor shall inspect, clean and/or replace the instrument regulators and filters, as needed, for proper instrument performance. 2. The depot locations are as follows (the Project Manager may include additional locations within this Contract): FLATBUSH 4901 Fillmore Avenue Brooklyn, NY 11234 (347)643-5714/5715 COLLEGE POINT TH 128-15 28 AVE Flushing, NY 11354 (718) 445-3100 ULMER PARK 2449 Harway Avenue Brooklyn,NY 11214 (718)265-3215/3216/3217 FRESH POND 66-99 Fresh Pond Road Brooklyn, NY 11385 (718)334-8642/8643 KINGSBRIDGE 4065 Tenth Avenue New York, NY 10034 (212)544-3423/3456/3430 YUKON 40 Yukon Avenue Staten Island, NY 10314 (718)494-5615/5651 GRAND AVENUE (DEPOT & CMF) 48-05 Grand Avenue Maspeth, NY 11378 MANHAITANVILLE 666 West 133rd Street New York, NY 10027 (212)712-4381 ZEREGACMF 750 Zerega Avenue Bronx, NY 10443 (347)643-5147/5152/5153 GUN HILL 1910 Bartow Avenue Bronx, NY 10469 (718)430-4841/4843 MICHAEL J. QUILL 525 Eleventh Avenue New York, NY 10018 (212)712-5030/5031/5033 EASTCHESTER DEPOT 3320 Hutchinson Avenue Bronx, New York 10475 (718)994-5500 JACKIE GLEASON 845 Fifth Avenue Brooklyn, NY 11232 (718)851-5852/5853/5883 QUEENS VILLAGE nd 97-11 222 Street Queens Village, NY 11428 (718)217-4763 MOTHER C. HALE DEPOT SPRING CREEK DEPOT 12755 Flatlands Avenue Brooklyn, New York 11208-5531 (718) 277-8100 721 Lenox Avenue New York, NY 10039 JFKDEPOT 165-25 147th Ave Jamaica, New York 11434 (718) 995-4700 3. Prior to award, the Contractor shall provide a list of OEM-certified technicians who will be performing services under this Contract. The Project Manager also reserves the right to request certification documents of each technician. 4. All calibration Work shall be performed according to the most recent procedures established by the OEM. The Contractor shall confirm the consistency of the calibration work by rechecking the same calibration Work per the manufacturer's recommendations. 576968 Contract No. IFB 60883- ATTACHMENT 1 2 Addendum No.1 6. Upon completion of the service work, whether maintenance or repair, the Contractor shall affix a tag on the carbon monoxide monitors to specify the repair date and the name of the technicians that performed the service. QUALITY ASSURANCES The Contractor shall be responsible for quality assurances therefore assuring that all Work conforms to the specifications. The Contractor shall maintain an effective and economical quality control program, planned and developed in conjunction with other Contractor functions necessary to satisfy the Contract requirements. The quality control program shall establish and implement procedures to ensure that only acceptable Work is presented to the Project Manager and shall demonstrate both, recognition of quality requirements of the Contract and an organized approach to satisfy these requirements. The program shall ensure that quality requirements are determined and satisfied throughout all phases of Contract performance, including as applicable, purchasing, fabrication, processing, assembly, testing, packaging, delivery and storage and shall provide for the early and prompt detection of actual or potential deficiencies, trends, or conditions which would result in unsatisfactory quality. The Contractor must be prepared to demonstrate to the Project Manager's satisfaction that the quality control program is effective and in operation. 576968 Contract No. IFB 60883- ATTACHMENT 1 3
© Copyright 2024 ExpyDoc