Integrated Pipeline Project
The Integrated Pipeline (IPL) is a regional partnership for water supply between Tarrant Regional Water
District (TRWD) and the City of Dallas Water Utilities (DWU). This vital project exhibits a commitment
by two of the region’s largest water providers to meet water demands for an increasing population in
the Dallas/Fort Worth metroplex.
When completed, the IPL will extend approximately 150 miles from Lake Palestine to Lake Benbrook
interconnecting Cedar Creek and Richland Chambers reservoirs. Raw water delivery capabilities for both
agencies will increase by a combined 350 million gallons per day (MGD), providing operational
flexibility, energy efficiency, and construction cost savings to the more than 5 million existing residents.
Fair Opportunity Purchasing and Contracting
Policy
TRWD and DWU are committed to promoting the
utilization of Minority/Women Owned Business
Enterprises
(M/WBE)
and
Historically
Underutilized Business (HUB). In a concerted
effort, the IPL Fair Opportunity Purchasing and
Contracting (FOPC) Policy was developed to
encourage procurement of goods, equipment
and services through M/WBE|HUB Contractors
and vendors.
The FOPC policy establishes the following
primary program goals:
• A 25% g o o d f a i t h e f f o r t for all phases of
the project;
• Develop opportunities for M/WBE|HUB
companies;
• Create networking opportunities to
encourage prime and sub-contractors
teaming agreements;
• Sponsor or identify training programs or
events to increase firm capabilities and
services;
• Assist eligible firms in obtaining certifications
through identified registration authorities;
• Coordinate efforts between TRWD and DWU,
as well as local chambers, advocacy groups,
local trade organizations and other small
business enterprise assistance agencies in
order to increase local business utilization.
Public Outreach Program
A list of programs currently in effect with a brief
description is provided below:
Consultant Liaison Program
On a monthly basis, a representative of the
Public Outreach staff contacts M/WBE firms
currently under contract for the IPL Project. The
primary objective of the Liaison Program is to
ensure that M/WBE firms are having a good
experience with the IPL. The Liaison Team
provides assistance or training for these subconsultants. Another focus of the Liaison
Program is to provide a connection to the IPL
Project team and to encourage identification of
needs that sub-contractors may have in regard to
the IPL.
Networking Program
Networking events are planned to create
opportunities for M/WBE|HUB firms to maximize
potential teaming opportunities. Similar events
sponsored by local agencies are identified and
attended to increase IPL opportunities within the
local community.
Public Outreach Pre-Screening Program
As the IPL Project team prepares for
construction, the pre-screening program identifies
sub-contractors that have specific capabilities
and/or services required for large pipeline and
pump station construction. The information for
this will be available for potential prime
contractors in order to better match project
needs with firm capabilities to further encourage
M/WBE|HUB firm utilization.
M/WBE|HUB Program Report
Public Outreach Pre-Screening Program Statistics
• 109 total pre-screened vendors to date;
• Of the 1 0 9 vendors, roughly 45 are
professional services and the remaining 58
are contractors and suppliers;
• 3 joint ventures prepared to bid on Section
15-1;
• M/WBE vendor was apparent low bidder on
the valves
IPL PROGRESS UPDATE
Below is a summary of completed or planned
effort or design, construction and/or supporting
services specific to the Integrated Pipeline
project.
Major Activities, Milestones or Deadlines for Last
Quarter
• IPL outreach event held at the Latino Cultural
Center with more than 100 in attendance;
• Kathy Berek spoke to Society for Marketing
Professional Services association, more than
50 attended;
• IPL Pre-Bid meeting for Section 15-1 held on
January 16, 2014 at the Ruthie Jackson
Center in Grand Prairie, with more than 20 in
attendance;
• IPL Construction Material Testing and
Resident Rep Services Discussion Meeting at
the Ruthie Jackson Center in Grand Prairie;
• Pre-Proposal for Package 04 and Package 05
- Butterfly Valves;
• Pre Proposal for Procurement Package 03 Gate Valves.
•
•
•
IPLProject.com
IPLProject.com was created in 2013 under
ongoing and continuous revisions and updates in
order to better inform those interested in the IPL
Project.
This site includes the following:
• General overview, timeline and map of the
IPL Project.
• Program management information, including
design components
• Relevant and pertinent news articles
pertaining to the IPL.
• An informative ‘Contracting’ tab with links to
our vendor database and pre-screening
questionnaire, as well as the highly
anticipated ‘Bid Opportunities’ information.
• Frequently asked questions with answers to
some of the most commonly received
questions from our ‘Contact Us’ database.
IPLProject.com Google Analytic Statistics
•
•
Major Activities, Milestones or Deadlines for
Next Quarter
• Proposals due for JB3R Suction Reservoir;
• Proposals due for Procurement Package 04
and Package 05 - Butterfly Valves;
• Proposal due for Procurement Package 03 –
Gate Valves.
Proposals due for Procurement Package 05 Butterfly Valves 04 and 05;
Proposals due for Procurement Package 06 Multiple Orifice Valves;
IPL outreach event in Ellis County;
•
To date, the site has received 3,521 visits with
72.82% of these visits falling in the new visitor
category.
27% of the total visits are considered returning
visitors to the site.
The average number of pages viewed during
one site visit totals 3.57 pages, more than half
of the sites total content.
M/WBE|HUB Program Report
INTEGRATED PIPELINE PROJECT
FINAL ALIGNMENT
PROJECTED SCHEDULE
M/WBE|HUB Program Report
March
Contracts Awarded
Total contracts awarded through March 31, 2014 program wide total $368,710,819.
Total Contracts Awarded to Date VS.
M/WBE|HUB Contracts Awarded to Date
$67,084,340 $301,626,479 Invoiced Amounts
Invoices through March 31, 2014 total $202,078,302.01.
Other Invoices to Date VS
M/WBE|HUB Invoices to Date
$46,835,142.52 $155,243,159 M/WBE|HUB Program Report
Local vs. Non-local Contracts Awarded
A firm is considered local with an office in the following counties: Tarrant, Dallas, Anderson, Collin,
Denton, Ellis, Freestone, Henderson, Jack, Johnson, Kaufman, Navarro, Parker, Rockwall or Wise.
Total contracts, both local and non-local, awarded to date total $46,835,142.00.
Local Contracts Awarded to Date VS
Non-Local Contracts Awarded to Date
$6,288,733 L
$40,546,408.97 Outreach Activities and Events for Last Quarter:
IPL staff met with several local firms to discuss potential business opportunities on behalf of the IPL
Project, including:
• Ron Smith, Dikita Enterprises
• Pat Acker, Halff
• NTC Water Summit
• Becky Johnson, TCU – SMU Study
• Spandana Tummuri. Freese and Nichols
• Stephen Mason, Mas-Tek
• Lamb Star – IPL Sec 12 & 13 Field Recon Kick-Off Meeting
• Edward Andrews, Project Management Associates
• CMAA NTX February 2014 Meeting
• Stephen Mason – Mas-Tek
• Lisa Mead, Toeroek
• Chula Ellepola, Kleinfelder
• Baker Ashiwaya, KBR
• Marvin Williams, Hope & Williams
• Sandy Troyano, Toeroek Associates
• Doug Smith, Jacobs Engineering
• Telfryn John, Gorrondona & Associates
• Daniel Lewis, Aconex
• Dawn Anderson, CP& Y
M/WBE|HUB Program Report
•
•
•
•
•
•
•
•
Michael Arrambide, BAR Constructors
Selling to the City – IPL Project – Bill J Priest
COD Construction A/E Roundtable – Panel for IPL City Hall Auditorium
Rudy Barron – Barron Constructors – Hauling
Kevin Draper – CP Construction
Hard Hat – Eddie Dean’s
GSWBCC Doing Business with the City – IPL Lancaster
GSWBCC Chamber Luncheon – Duncanville
The IPL Outreach Team actively participates in community events and M/WBE|HUB networking
activities, by partnering with local M/WBE|HUB organizations.
-
Outreach Activities and Events for Next Quarter:
Public outreach event scheduled in Ellis County;
Continue to inform local firms about the pre-screening program and encourage good faith effort
The Public Outreach Coordinator will continue to meet with 10 M/WBE|HUB firms
The Liaison Program will interface with IPL M/WBE firms to provide resources for a positive
growth experience.
M/WBE|HUB Program Report
Certification Assistance
Firms interested in the IPL Project request assistance and guidance in becoming certified as an
M/WBE/HUB. The IPL PROJECT MHL Business Coordination Team has assisted 3 firms with
certification this quarter, and continues to meet with additional firms to help them get their certification.
Validation of Certification
In order for a firm to be counted towards the overall M/WBE/HUB participation goal, the M/WBE/HUB
firm must maintain a valid and up-to-date M/WBE/HUB certification. To date, the IPL Project Team has
successfully awarded 65 contracts certified M/WBE|HUB firms shown in the list below:
COMPAN
Y
AERIAL DATA SERVICE, INC.
ALPHAGRAPHICS #83
AMATERRA ENVIRONMENTAL, INC.
APM & ASSOCIATES, INC.
ARRENDONDO, ZEPEDA, & BRUNZ
BDS TECHNOLOGIES, INC.
CAS CONSULTING & SERVICES, INC.
CHESTER ENGINEERING
Contract Services
Photographers,
Photographic Supplies
Printers/ Graphics,
Typesetters
Cultural Resources
Investigations
Utility Coordination
Engineers - Civil,
Consulting, Architects
Environmental Site
Assessment
Engineers - Civil,
Consulting, Architects
Engineers - Civil,
Environmental, Mechanical
& Consulting
NCTRCA/HUB
Certification
County
WFWB58167N0714
Other
WFWB57513N0514 Tarrant
WFWB57852N0614 Travis
BMMB57524Y0514
Dallas
HMDB57530Y0514
Dallas
BMDB56499Y0214
Dallas
PMMB54808N0913
Dallas
BMMB57543Y0514
Dallas
Erath
COLLIER CONSULTING, INC.
Geophysical Consultation
WFWB54617N0813
CON-REAL, LP
Right Of Way Professional
Services
BMMB55545Y1113 Tarrant
COURTHOUSE RESEARCH
SPECIALISTS
COX-MCLAIN
Right Of Entry Research
HMMB57453N0514 Dallas
Environmental Permitting
WFWB56858N0314
Other
CP&Y, INC.
Material Testing
PMMB55826Y1213
Dallas
CRESPO CONSULTING SERVICES INC.
N/A
HMMB54102N0713
Other
CRIADO & ASSOCIATES, INC.
Engineers - Civil,
Consulting, Architects
HFDB57963Y0714
Dallas
DAL-TECH ENGINEERING, INC.
Traffic Control Plans
WFWB55313Y1013 Dallas
EBG ENGINEERING, LLC
GIS Graphics Support
WFWB54182N0713 Dallas
EPB ASSOCIATES, INC.
Engineers - Structural
HMDB57117Y0414
Dallas
FOSTER CM GROUP
Constructability Review
BMMB55448N1113
Dallas
M/WBE|HUB Program Report
Geotechnical Research
HMDB58399Y0814 Tarrant
GORRONDONA & ASSOCIATES, INC.
Surveyors
HMMB57531Y0514 Tarrant
GUPTA & ASSOCIATES
Value Engineering
PMMB57943Y0714
Dallas
HELP AT THE HELM (HATH)
Value Engineering
WFWB54803N0913
Other
HOPE & WILLIAMS, INC.
Program Management
BMMB55052N1013 Tarrant
HVJ ASSOCIATES, INC.
Geotechnical Research
BMMB57382N0514
Dallas
HFDB56642Y0214
Dallas
BMDB55932Y0114
Dallas
IBARRA CONSULTING ENGINEERS,
INC.
ICONIC CONSULTING GROUP, INC.
Contract Services
NCTRCA/HUB
Certification
COMPAN
Y
GM ENTERPRISES DRILLING SERVICES
Engineers - Civil,
Environmental, Mechanical
& Consulting
Engineers - Civil,
Environmental, Mechanical
& Consulting
County
IEA, INC.
Corrosion Study
IMDB55279Y1113
Dallas
INTEGRATED ENVIRONMENTAL
SOLUTIONS, LLC
Environmental Site
Assessment
WFDB55148Y1013
Collin
JQ INFRASTRUCTURE (MEHTA WEST)
Engineers - Structural
IMDB58200Y0714
Dallas
K STRATEGIES GROUP, LLC
N/A
BFDB55392Y1113
Dallas
KEVIN SLOAN STUDIO, LLC
Landscape ArchitectsContractors & Design
WFWB54178N0713 Dallas
Geotechnical Research
BMDB56718Y0314 Tarrant
PCCP Pipe Design
BMDB55434Y1113
MAS-TEK ENGINEERING &
ASSOCIATES, INC
MBROH ENGINEERING
Dallas
NATHAN D. MAIER CONSULTING
ENGINEERS, INC.
Printers/ Graphics,
Typesetters
Engineers - Civil, Electrical,
Mechanical, Consulting
Engineers - Civil,
Consulting, Architects
OPEN CHANNELS GROUP, LLC
M/WBE Consulting
BFDB55944Y0114
Tarrant
PACHECO KOCH CONSULTING
ENGINEERS, INC
Surveyors
HMDB50579Y0913
Dallas
Right Of Way Professional
Services
WFDB51352Y1212 Tarrant
Operational Planning
WFWB56571Y0214 Dallas
ROCIP Consulting
BMMB55004N0913
Corrosion Control
WFWB56260N0114 Howard
MS DALLAS REPROGRAPHICS
MULTATECH, INC.
PINNACLE CONSULTING
MANAGEMENT
PRO-OPS, INC.
PROTECTORS INSURANCE &
FINANCIAL SERVICES
RUSSELL CORROSION CONSULTANTS,
INC.
WFWB56940Y0314 Dallas
HMMB58069Y0714 Tarrant
WFWB58329Y0814 Dallas
Other
M/WBE|HUB Program Report
NCTRCA/HUB
Certification
County
Engineers - Civil,
Consulting, Architects
HFMB52251N0113
Dallas
SAM, INC.
Surveyors
BMDB17540N1203
Dallas
SIMPLY FOR YOU
Caterers
WFWB53062N0313 Tarrant
Geotechnical Professional
Services
HFDB56664Y0214
Surveyors
NMDB55362Y1113 Tarrant
COMPAN
Y
SAENZ BURY ENGINEERING, LLC
SOUTHWESTERN TESTING
LABORATORIES
SPOONER & ASSOCIATES
STATESIDE RIGHT OF WAY SERVICES
TECHNICAL ASSOCIATES SERVICES,
INC.
TEXAS MUNICIPAL ENGINEERING
TEXPLOR OF DALLAS
TOEROEK
UNITED STATES RIGHT OF WAY
COMPANY
URBAN ENGINEERS GROUP, INC.
V & A CONSULTING
W. WARE & ASSOCIATES
Contract Services
Right Of Way Professional
Services
Geotechnical Professional
Services
Engineers - Civil,
Consulting, Architects
Geotechnical Research
Document Management
Support
Right Of Way Professional
Services
Engineers - Civil,
Environmental, Mechanical
& Consulting
Corrosion Control
Minority Business
Development Agency
Dallas
WFDB55125Y1013 Tarrant
BMDB57890Y0614
Dallas
HMMB55820Y1213
Dallas
WFDB56695N0214
Dallas
WFWB54651N0813
Other
WFDB57026Y0314 Denton
HFDB58019Y0714
Dallas
HMMB56798N0314
Harris
BFDB57861Y0614
Tarrant