Pamela Gomez, FAA

NextGen:
Modernization of the National Airspace System
2014 ICG NxtLink Conference
September 10, 2014
Presented by
Pamela Gomez
NextGen Performance & Outreach Office
Edward
Bolton
Federal
Aviation
Administration
Assistant Administrator, NextGen
Federal Aviation Administration
1
Air Traffic Management Today
2
From Beacon to Satellite
Procedural-based control
based on pilot-location reports
via radio
•
•
•
Landmark navigation
Radio beacons
Position reports
1930s
Surveillance-based
control
Trajectory-based control
based on precision GPS location
based on radar location
•
•
•
•
•
VOR/DME
Radar
1950s
RNP
ADS-B
Data Comm
Now
3
Delivering NextGen Improvements
Legacy System
NextGen
Radar
Inefficient Routes
Voice Communications
Disparate Information
Fragmented Weather Forecasting
Weather Restricted Visibility
Forensic Safety Systems
Nationwide Focus
Satellite
Performance Based Navigation (fuel savings)
Voice & Digital Communications
Automated Decision Support Tools
Integrated Weather Information
Improved Access in Low Visibility
Prognostic Safety Systems
Focus on Congested Metroplexes
4
Delivering NextGen
En Route Automation Modernization
Constrained Automation
Flexible Automation, Decision- Support Tools
Automation platform for NextGen operations in high-altitude airspace
• Seamless info sharing
• Flexible routing
• Automatic flight coordination
• Enables NextGen capabilities
• In place nationwide 2015
Foundational Program
5
En Route Automation
As of: July 2014
6
ORD
Cont Ops
IOC
Pre-IOC
15 of 20
16 of 20
19 of 20
1 of 20
Delivering NextGen
Automatic Dependent Surveillance - Broadcast
Radar Surveillance
Satellite-Based Surveillance
Satellite-Based Surveillance
• Precision position updates
• Cockpit traffic and weather
• Safer flights
• Reduced separation
• Oceanic altitude changes
• Ground infrastructure in place
nationwide (March 2014)
Transformational Program
7
ADS-B Coverage and
En Route Integration
As of July 2014
Service Delivery Points for ATC
Separation Services
En Route
Terminal
Surface (Advisory)
17 of 24 (No Change)
60 of 159 (+1)
32 of 44 (No change)
Rule-Driven ADS-B Out Avionics
Equipage: 5,598 (+232)
ADS-B In Avionics Equipage: 4,643
(+509)
Changes from Previous Month:
634 Radios Installed Across CONUS
En Route IOCs: No Change
Terminal IOC: Wichita (10 July 14)
Surface IOC: No Change
Automatic Dependent Surveillance–Broadcast
8
Delivering NextGen
Performance Based Navigation
(PBN)
Ground-Based Navigation
Performance-Based Navigation
Precision routes
• Reduced flight time and fuel
• Flexible weather reroutes
• Integrated traffic flow
• End-to-end PBN network
• Airspace deconfliction
9
RNAV and RNP Implementation in the NAS
2009
RNAV SIDs/STAR: 275+
RNAV En route (T/Q/AR): 90+
RNAV / RNP approaches: 2300+
10
RNAV and RNP Implementation in the NAS
2010
RNAV SIDs/STAR: 275+
RNAV En route (T/Q/AR): 90+
RNAV / RNP approaches: 2300+
11
RNAV and RNP Implementation in the NAS
2011
RNAV SIDs/STAR: 275+
RNAV En route (T/Q/AR): 90+
RNAV / RNP approaches: 2300+
12
RNAV and RNP Implementation in the NAS
2012
RNAV SIDs/STAR: 275+
RNAV En route (T/Q/AR): 90+
RNAV / RNP approaches: 2300+
13
RNAV and RNP Implementation in the NAS
2013
RNAV SIDs/STAR: 275+
RNAV En route (T/Q/AR): 90+
RNAV / RNP approaches: 2300+
14
Data Communications
Departure Clearance Tower Service
As of: July 2014
Key
- Trials Sites
- Tower DCL Sites
(57
sites)
Will deploy En Route
Services to all 20
ARTCCS
Complete DCL Tower
Trials January 2016
Data Communications (Data Comm)
15
NAS Voice System
As of: July 2014
Flexible operational
voice capability
1 ARTCC
1 TRACON
1 ATCT
(Air Traffic Facilities are
simulated and linked
over FTI national test
bed)
NAS Voice System (NVS)
16
Terminal Automation
As of: July 2014
17
Terminal Flight Data Manager
As of: July 2014
•
•
•
•
Inefficient traffic coordination
Inefficient inter-facility coordination
Surface delays and congestion
•
•
Shared surface situational awareness
displays
Interface to Flight Operator Systems
Tower and airport configuration
management
TFMS, SWIM,
FTI/LAN,
AOCNET/
CDMNET,
DataComm
TFDM Early Implementation Capability
– Surface Visualization Tool
• SCT – IOC in 4/2/2014 (actual)
• ATCSCC & NCT – site visits and
coordination are currently underway,
with IOC planned for Summer 2014
18
TBFM, TFMS,
SWIM, FTI/LAN,
ERAM, STARS,
ASDE-X
Delivering NextGen
System Wide Information Management (SWIM)
Inconsistent Data from Multiple Sources
Common Shared Data
Data-sharing platform
• Identical information for NAS users
• Flexible and secure information
management architecture
• Enables data exchange and
interoperability across systems
• Supports exchange of NAS data:
surface, weather, flight, etc.
Transformational Program
19
NextGen Priorities
Delivering Operational Capabilities in the next 3 years
•
FAA and Industry have worked together for the past 6 months to
focus in on some top priorities
1.
2.
3.
4.
Closely Spaced Parallel Runway Operations
Performance Based Navigation Operations
Surface Operations
Data Communications Service Delivery in the Terminal Areas
•
We have unprecedented cooperation inside the agency and with our
aviation industry colleagues
•
The result of this collaboration will be reflected in an executable joint
implementation plan that will be delivered to Congress on October
17th, 2014
•
The plan will provide specific FAA commitments as well as Industry
commitments and ensure implementation and associated delivery of
measurable benefits of these priority capabilities
Find Out More About NextGen
www.faa.gov/nextgen
21
BACKUP
22
NextGen Timeline As of July 2014
2000
Multi
Agency
Planning
Major
Program
Execution
2005
2003: JPDO
Established
Vision 100
2010
2015
2020
2025
2009: FAA Mid2007:
CONOPS Term CONOPS
v2 JPDO
2006:
CONOPS v1
JPDO
ADS-B
2005: Program
Established JRC
2007: CA
2014: Ground
Infrastructure
2010: Out
Mandate Start
2015: En Route IOC
2020: Terminal IOC
Mandate Out Finish
SWIM
2008:Program
Start
2009: JRC
Seg. 1
2012: JRC
Seg. 2A
2015: JRC
Seg. 2B
Data Comm
2008:Program
Start
2014: JRC
Seg. 1,
Phase 2
En Route
2012: JRC Seg. 1,
Phase 1 Tower,
and CA
2016: IOC
Tower
Services
2019: IOC En Route
Services
NAS Voice System
2007: Program
Start
JRC – Joint Resource Council
CA – Contract Award
IOC – Initial Operational Capability
IID – Initial Investment Decision
FID – Final Investment Decision
Seg. – Segment
23
2014: JRC FID Seg. 2
NAS Qualification
2012: JRC
Seg. 1,
and CA
2017: JRC FID Seg. 2
Deployment Approval
TFDM
2013: Program
Start
23
2014:
JRC
IID
2015: JRC FID,
and CA
2017: Complete
Key Site IOC