SunInvest AG

The
sun pays off –
Emissionsbroschüre
Investment
in the energy
SUNinvest Anleihe
generation of the future
Ausgabe 2011
2 | SUNinvest
PHOTOVOLTAICS | 3
25 years of photovoltaic experience
for attractive returns
SUNinvest –
Swiss financing company for large
photovoltaic plants
Photovoltaic power plants:
Maximum yield security thanks to engineering competence and first-rate products
Photovoltaics:
Energy of the future
Investment in a future-oriented
technology
Our energy of tomorrow will be
regenerative
Photovoltaic systems are technically innovative and
Solar power is on its way to become a supporting pil-
SUNinvest finances, builds and operates select photo-
Technical excellence, attractive returns, solid guaran-
sustainable at the same time. Since, moreover, solar
lar of future energy supplies. In some countries, solar
voltaic plants directly or through operative subsidiar-
tees and securities. Those are the principles accord-
power is profitable, photovoltaic systems as invest-
power systems already cover more than four percent
ies in Switzerland and neighbouring EU countries as
ing to which SUNinvest selects, plans and realizes its
ment objects are continuously gaining in attractive-
of the power demand. Also, in 2013, Switzerland
well as in select international photovoltaic markets.
projects.
ness. Solar systems are sustainable plant products
reached the one-percent level, nearly double the so-
successfully combining economy and ecology.
lar power share of the previous year.
SUNinvest offers high-quality and interesting photo-
Prime credo in this respect is long-term highest qual-
voltaic systems; investors are provided with profitable
ity: Exclusively used are products from manufacturers
investment possibilities in the future-oriented photo-
who comply with strict SUNinvest quality and instal-
voltaic technology.
lation requirements, configured and designed by en-
Why are solar systems profitable?
gineers with many years of photovoltaic experience.
Currently, there are the state feed-in tariffs which
To this end, SUNinvest can rely on over 25 years of
SUNinvest projects thus ensure, over the long run, the
have been fixed for 20 to 25 years in most European
experience of its photovoltaic project partner TRITEC.
return on these investments.
countries, in Switzerland the cost-covering savings
SUNinvest products include photovoltaic plants or
compensation (KEV), which render investments in so-
major plant complexes (as share deals) for direct
lar systems safe and profitable. Since with regard to
acquisition, shareholding interests, long-term loans
locations, solar irradiation is also relatively constant,
and debenture loans.
the investor can expect stable yields with solar sys-
Rapidly increasing percentage of photovoltaics in global energy generation
4.70%
0.60%
tems. Moreover, the increasing professionalization in
SUNinvest promotes the generation of solar power
manufacturing the photovoltaic system components
in Switzerland and internationally through the design,
reduces procurement costs; at the same time, the
installation and operation of photovoltaic systems.
energy costs of conventional energies are increasing.
16.50%
In the medium term, photovoltaic systems will thereIn the year 2000, SUNinvest AG was founded as a
fore be automatically profitable even without any
stock corporation by the graduate electrical engineer
government incentive programs – and that is already
Giorgio Hefti (Dipl. El. Ing. – FH) and KMU (HSG).
the case in countries with high costs of conventional
SUNinvest AG has its headquarters at Herrenweg 60,
energy.
CH-4123 Allschwil.
78.20%
Fossil and nuclear
Hydroelectric power
Other renewable energies
Photovoltaics
Source: IEA International Energy Agency, Trend Reports 2013
4 | REFERENCE PROJECTS
PROJECTS FOR DIRECT ACQUISITION | 5
Technical excellence, attractive returns,
solid guarantees and securities
Within the selected photovoltaic investment projects,
nical excellence, attractive returns and a complete
SUNinvest AG is focused on project development,
guarantee and security portfolio are the basic princi-
project support, financing, construction and operation
ples in the evaluation and selection of the SUNinvest
of own and third-party photovoltaic systems. Tech-
projects.
Further projects upon request or at www.suninvest.ch
SUNinvest
photovoltaic reference projects
Photovoltaic System
Mutina
Location
Mutina, Italy
Type of project
On-roof photovoltaic systems
on 4 garages
Basel Trade Fair
Basel, Switzerland
On-roof photovoltaic system
grid connection
Realization
April 2011
Nov./Dez. 2013
SUNinvest
photovoltaic projects for direct acquisition
Feldschlösschen
Rheinfelden, Switzerland
On-roof photovoltaic systems
grid connection on 2 roof surfaces
(total of 23,000 m2)
Nov./Dez. 2013
XXL-Box 1
XXL-Box 2
XXL-Box 3
Ecuvillens, Switzerland Ecuvillens, Switzerland Matran, Switzerland
August 2014
August 2014
Juni 2014
2070 kWp
1,900,000 kWh/year
1,235 tons/year
490 kWp
513,000 kWh/year
333 tons/year
150 kWp
157,250 kWh/year
102 tons/year
707 kWp
742,560 kWh/year
483 tons/year
XXL-Box 4
Epagny, Switzerland
XXL-Box 5
Epagny, Switzerland
XXL-Box 6
St. Aubin, Switzerland
Juni 2014
Juni 2014
August 2014
144 kWp
143,500 kWh/year
93 tons/year
157 kWp
169,300 kWh/year
110 tons/year
183 kWp
182,500 kWh/year
119 tons/year
On-roof photovoltaic system, grid connection
Technical data Size of photovoltaic system
950 kWp
Energy yield/year
1,026,000 kWh/year
CO2 savings
607 tons/year
Photovoltaic products used
Quality products
from the TRITEC product portfolio
Delivery, planning and design,
installation
TRITEC Group
Solar Ebner
Financial data
Project costs, total
2.79 m EUR
Project cash flow 20 years (80/20)
5.92 m EUR
IRR Project
8.37%
Securities
Irradiation values 1,300 kWh/m2
Incentive contribution guarantees
Land / building use guarantees
3.76 m CHF
7.5 m CHF
> 6%
3.9 m CHF
7.7 m CHF
> 6%
1,161 kWh/m2
1,161 kWh/m2
SUNinvest AG
Roof usage contract over
25 years
Roof usage contract over
20 years
20/25 years performance guarantee for solar modules
5 –10 years product guarantee for all photovoltaic components
TRITEC AG Schweiz
20 years
Swiss savings compensation
(KEv) as of 2014
Quality products from the TRITEC product portfolio
TRITEC Group
20 years
Swiss savings compensation
(KEv) and incentives bridging
by IWB Basel
Maintenance and service guaranteesSUNinvest AG
Depreciation
TRITEC Group
20 years Conto Energia
(0.335 €/kWp)
Performance guarantees, products
Insurances
1289 kWp
1,080,000 kWh/year
702 tons/year
TRITEC AG Schweiz
TRITEC AG Schweiz
922 k CHF
1.58 m CHF
4.5%
275 k CHF
475 k CHF
4.6%
1.228 m CHF
2.32 m CHF
5.5%
252 k CHF
446 k CHF
4.8%
273 k CHF
528 k CHF
5.7%
326 k CHF
565 k CHF
4.6%
1157 kWh/m2
20 years incentive contribution guarantee by means of the Swiss feed-in tariff (KEv) as of 2019
Incentives bridging until KEv start through local utility company
Roof usage contract over 20 years
20/25 years
performance guarantee
for solar modules; 5 to 10 years product guarantee for all photovoltaic components
Service and maintenance by TRITEC AG Switzerland
insurance, including yield loss insurance
Comprehensive
Comprehensive insurance, including yield loss insurance
20 years, linear
20 years, linear
6 | SUNinvest PRODUCTS
SUNinvest YIELD SECURITY | 7
The sun pays off –
Investment in the energy generation of the future
The sun is always shining –
SUNinvest offers additional yield security with high
quality and performance requirements
Further SUNinvest products
Long-term highest quality
4. Participations in the form of fixed interest
SUNinvest offers photovoltaic projects in different siz-
securities (loan / debenture)
Stable irradiation conditions are the naturally given
es and stages of development. Investors are provided
with profitable investment possibilities in the future-
System volume: CHF 2 million
basic requirement of a high-yield photovoltaic sys-
oriented photovoltaic technology. In addition to pho-
Denomination: Nominal amount CHF 5,000
tem. Solid returns are ensured if this photovoltaic
Minimum investment CHF 5,000
system moreover has an acceptance and incentives
tovoltaic plants or major plant complexes (as share
deals) for direct acquisition, we also offer sharehold-
Interest rate: 3% – 4.5%
guarantee for over 20 or 25 years. For all photovoltaic
ing interests, long-term loans and debenture loans.
Term: 8 – 20 years
projects, SUNinvest offers additional yield security
due to many years of photovoltaic know-how and
the exclusive use of brand name photovoltaic prod-
Return structure and term
SUNinvest products
System volume:
starting at CHF 250,000
IRR project: 4 – 8%
Term: 20 years
vestment requirements.
Project return
SunInvest Products
1. Direct acquisition photovoltaic systems
ucts which meet the rigid SUNinvest quality and in-
(with or without voting rights)
to be defined
Return: 6 – 9%
Term: 5 – 10 years
System volume: 1. Direct acquisition photovoltaic systems
4 – 6%
Term: 5 – 10 years
every project and comprises the annual function and
struction project and provide maintenance on the
yield control of the photovoltaic system.
experience.
6%
5%
Yield loss insurance
All SUNinvest photovoltaic projects are insured for
unforeseen and suddenly occurring failures, damages,
3. Participation as lender
destructions or losses of the installed photovoltaic
Performance guarantees SUNinvest
products
4. Participations in the form of fixed interest
system, which are not covered by the SUNinvest
warranty, the performance guarantee or the building
insurance.
2%
20/25 years performance guarantee for solar modules;
1%
5 to 10 years product guarantee for all photovoltaic
components.
to be defined
Loan interest: ence conceive, plan and design, supervise the con-
is able to present over 25 years of photovoltaic
3%
(long-term individual loans)
The maintenance contract is a fixed integral part of
of photovoltaic expertise. The project partner TRITEC
4%
3. Participation as lender
Engineers with many years of photovoltaic experi­-
ners have high technical know-how and many years
2. Shareholding interests
8%
7%
System volume: Maintenance and service guarantees
selected photovoltaic systems. All photovoltaic part-
9%
2. Shareholding interests
Many years of photovoltaic experience
2014
2024
2034
Terms
SunInvest Products
Land / building use guarantees
All offered projects have the required land / building
and roof use contracts.
SUNinvest AG
Herrenweg 60
CH-4123 Allschwil / Basel
T +41 61 699 35 35
[email protected]
www.suninvest.ch