FY 2015 – 2024 WORK PROGRAM
FY 2015
ANNUAL WORK PROGRAM
FY 2016 – 2017
SHORT RANGE ELEMENT
FY 2018 – 2024
LONG RANGE ELEMENT
Douglas
Proposed Highway Projects For Plan Fiscal Years : 2015 - 2024
County: Douglas
Map Location Location / Project Description - Fund Source
Total Amount
XS20140004-15
Holbrook Junction, HAR Installation. Installation of 5 state furnished HAR at
Hawthorne, Holbrook Jct, Schurz, Wellington, and Yerington. State Forces
DO20140001-15
Southern extension of Ironwood Drive to the south side of the Chichester Ponds
south of Gilman Avenue (Douglas County), Shared Use Path, Local Match, TAP
Statewide - Flex
NV20120008-15
Douglas Area Rural Transit (DART) in Douglas County & Carson City, Operating,
Administrative Expenses for a Deviated Fixed Route and Demand Response Transit
Service, FTA Section 5311 Small Urban & Rural Public Transportation
$641,444
DO20090009-16
US 395 at Airport Rd, Johnson Ln and Stephanie Ln DO 27.96 to 28.97
Construct acceleration lane. Highway Safety Improvement Program (HSIP), State
Match - Nevada
$750,000
DO20140005-16
US 395, at Holbrook Junction. DO 2.50 to 3.00, Deployment of CCTV and flow
detectors. District Contract
$248,000
DO20130020-16
SR 206 Genoa Ln at Carson River DO 13.04 to 13.04, Scour Countermeasures and
Rehabilitation B-1239, STP Statewide
$300,000
DO20140002-16
SR 756 Centerville Rd DO 3.68 Bike/Ped Improvements, Bridge #287 and
adjacent sidewalks, TAP Statewide - Flex
$600,000
DO20140009-16
County Rd (in Minden), from 8th St to 10th St
TAP Statewide - Flex
$314,198
NV20120008-16
Douglas Area Rural Transit (DART) in Douglas County & Carson City, Operating,
Administrative Expenses for a Deviated Fixed Route and Demand Response Transit
Service, FTA Section 5311 Small Urban & Rural Public Transportation
$641,444
DO20140001-16
Martin Slough Shared-Use Path, Southern extension of Ironwood Dr to S side of the
Chichester Ponds S of Gilman Ave. TAP Statewide - Flex
$800,238
DO20140003-17
US 395 Sidewalk Improvements adjacent to Kings Lane (Gardnerville) DO 20.85 to
21.57, Bike/Ped Bridge, Local Match, TAP Population over 5,000 to 200,000, TAP
Statewide - Flex
$467,237
DO20130017-17
SR 757 (Muller Lane) @ Carson River MP DO 0.34 (Structure B-474) DO 0.34 to
0.34, Replacement (Off System) - State Owned. Advanced Construction Payment,
STP Off-System Bridge / On/Off Exempt
$1,200,000
DO20130018-17
SR 88 Woodfords Rd; Structures B-553, B-575, B-580, B-576, and B-627. DO 0.00 to
7.33, Seismic retrofit, scour contermeasures and rehabilitation, On System, National
Highway Performance Program (NHPP)
$4,000,000
Pedestrian Improvements (sidewalk).
Information presented is subject to revision. Doc Date: October 1, 2014
$150,000
$25,000
Proposed Highway Projects For Plan Fiscal Years : 2015 - 2024
County: Douglas
Map Location Location / Project Description - Fund Source
Total Amount
NV20120008-17
Douglas Area Rural Transit (DART) in Douglas County & Carson City, Operating,
Administrative Expenses for a Deviated Fixed Route and Demand Response Transit
Service, FTA Section 5311 Small Urban & Rural Public Transportation
$641,444
NV20120008-18
Douglas Area Rural Transit (DART) in Douglas County & Carson City, Operating,
Administrative Expenses for a Deviated Fixed Route and Demand Response Transit
Service, FTA Section 5311 Small Urban & Rural Public Transportation
$641,444
Project Identified from 2007 Corridor Study: US 395 from the Jct of Muller Ln to the
DO20080021-LRE Jct of Johnson Ln. DO 24.00 to 28.00, Build four lane freeway, with one lane one way
frontage roads on each side, overpass and interchange., Unknown
$73,000,000
Project Identified from 2007 Corridor Study: US 395 from the Jct of Palomino Ln to
DO20080023-LRE the Jct of Pinenut Rd. DO 16.00 to 19.00, Widen to four lanes with center left turn
lane. Unknown
$29,000,000
DO20080029-LRE
US 395 from Church St to Mill St. DO 21.12 to 22.00, Replace existing sidewalk area
and driveways. Unknown
DO20080022-LRE
US 395 from SR 88 Woodfords Rd to the Jct of Muller Ln. DO 23.00 to 24.00, Build
six lane arterial., Unknown
$126,000,000
DO20080024-LRE
ByPass to connect US 395 S of Genoa Ln to SR 88 N or Waterloo Lane. Build four
lane road (West side bypass). Unknown
$46,000,000
Project Identified from 2007 Corridor Study: SR 756 from 0.01 M E of the Jct of
DO20080028-LRE Dresslerville & Drayton to the Jct of Waterloo Ln. DO 2.00 to 3.00, Widen to 4 lanes.
Unknown
DO20080025-LRE
Project Identified from 2007 Corridor Study: SR 88 Woodfords from County Rd to
Kimmerling Rd. Widen from 2 to 4 lanes. Unknown
DO20120013-LRE Centerville Rd at 1.7 M W of Jct SR 88. Culvert Replacement, Unknown
$1,280,000
$11,000,000
$25,000,000
$302,373
DO20080012-LRE
SR 756 Centerville Rd at 0.25 M E of the Jct of Waterloo Ln (Structure B-1601). DO
3.00 to 3.00, Bridge Railing Replacement. Unknown
$150,000
DO20080015-LRE
SR 757 Mottsville Lane at 2.10 M E of Jct of SR 206 (Structure B-1330). DO 2.00 to
2.00, Bridge Repair. Unknown
$150,000
DO20080026-LRE
Project Identified from 2007 Corridor Study: Dressler Rd from SR 88 to US 395.
Build 3 miles of new road (Dressler Lane extension). Unknown
DO20080027-LRE
Project Identified from 2007 Corridor Study: New road south of Pinenut Rd to the
Carson City Freeway. Build 20 miles of new 4 lane road (East side bypass). Unknown
$268,000,000
Total Proposed Expenditure:
$637,302,822
Information presented is subject to revision. Doc Date: October 1, 2014