This page is intentionally left blank. DRAFT NDOT FY 2015 – 2024 WORK PROGRAM FY 2015 ANNUAL WORK PROGRAM FY 2016 – 2017 SHORT RANGE ELEMENT FY 2018 – 2024 LONG RANGE ELEMENT Douglas Proposed Highway Projects For Plan Fiscal Years : 2015 - 2024 County: Douglas Map Location Location / Project Description - Fund Source Total Amount XS20140004-15 Holbrook Junction, HAR Installation. Installation of 5 state furnished HAR at Hawthorne, Holbrook Jct, Schurz, Wellington, and Yerington. State Forces DO20140001-15 Southern extension of Ironwood Drive to the south side of the Chichester Ponds south of Gilman Avenue (Douglas County), Shared Use Path, Local Match, TAP Statewide - Flex NV20120008-15 Douglas Area Rural Transit (DART) in Douglas County & Carson City, Operating, Administrative Expenses for a Deviated Fixed Route and Demand Response Transit Service, FTA Section 5311 Small Urban & Rural Public Transportation $641,444 DO20090009-16 US 395 at Airport Rd, Johnson Ln and Stephanie Ln DO 27.96 to 28.97 Construct acceleration lane. Highway Safety Improvement Program (HSIP), State Match - Nevada $750,000 DO20140005-16 US 395, at Holbrook Junction. DO 2.50 to 3.00, Deployment of CCTV and flow detectors. District Contract $248,000 DO20130020-16 SR 206 Genoa Ln at Carson River DO 13.04 to 13.04, Scour Countermeasures and Rehabilitation B-1239, STP Statewide $300,000 DO20140002-16 SR 756 Centerville Rd DO 3.68 Bike/Ped Improvements, Bridge #287 and adjacent sidewalks, TAP Statewide - Flex $600,000 DO20140009-16 County Rd (in Minden), from 8th St to 10th St TAP Statewide - Flex $314,198 NV20120008-16 Douglas Area Rural Transit (DART) in Douglas County & Carson City, Operating, Administrative Expenses for a Deviated Fixed Route and Demand Response Transit Service, FTA Section 5311 Small Urban & Rural Public Transportation $641,444 DO20140001-16 Martin Slough Shared-Use Path, Southern extension of Ironwood Dr to S side of the Chichester Ponds S of Gilman Ave. TAP Statewide - Flex $800,238 DO20140003-17 US 395 Sidewalk Improvements adjacent to Kings Lane (Gardnerville) DO 20.85 to 21.57, Bike/Ped Bridge, Local Match, TAP Population over 5,000 to 200,000, TAP Statewide - Flex $467,237 DO20130017-17 SR 757 (Muller Lane) @ Carson River MP DO 0.34 (Structure B-474) DO 0.34 to 0.34, Replacement (Off System) - State Owned. Advanced Construction Payment, STP Off-System Bridge / On/Off Exempt $1,200,000 DO20130018-17 SR 88 Woodfords Rd; Structures B-553, B-575, B-580, B-576, and B-627. DO 0.00 to 7.33, Seismic retrofit, scour contermeasures and rehabilitation, On System, National Highway Performance Program (NHPP) $4,000,000 Pedestrian Improvements (sidewalk). Information presented is subject to revision. Doc Date: October 1, 2014 $150,000 $25,000 Proposed Highway Projects For Plan Fiscal Years : 2015 - 2024 County: Douglas Map Location Location / Project Description - Fund Source Total Amount NV20120008-17 Douglas Area Rural Transit (DART) in Douglas County & Carson City, Operating, Administrative Expenses for a Deviated Fixed Route and Demand Response Transit Service, FTA Section 5311 Small Urban & Rural Public Transportation $641,444 NV20120008-18 Douglas Area Rural Transit (DART) in Douglas County & Carson City, Operating, Administrative Expenses for a Deviated Fixed Route and Demand Response Transit Service, FTA Section 5311 Small Urban & Rural Public Transportation $641,444 Project Identified from 2007 Corridor Study: US 395 from the Jct of Muller Ln to the DO20080021-LRE Jct of Johnson Ln. DO 24.00 to 28.00, Build four lane freeway, with one lane one way frontage roads on each side, overpass and interchange., Unknown $73,000,000 Project Identified from 2007 Corridor Study: US 395 from the Jct of Palomino Ln to DO20080023-LRE the Jct of Pinenut Rd. DO 16.00 to 19.00, Widen to four lanes with center left turn lane. Unknown $29,000,000 DO20080029-LRE US 395 from Church St to Mill St. DO 21.12 to 22.00, Replace existing sidewalk area and driveways. Unknown DO20080022-LRE US 395 from SR 88 Woodfords Rd to the Jct of Muller Ln. DO 23.00 to 24.00, Build six lane arterial., Unknown $126,000,000 DO20080024-LRE ByPass to connect US 395 S of Genoa Ln to SR 88 N or Waterloo Lane. Build four lane road (West side bypass). Unknown $46,000,000 Project Identified from 2007 Corridor Study: SR 756 from 0.01 M E of the Jct of DO20080028-LRE Dresslerville & Drayton to the Jct of Waterloo Ln. DO 2.00 to 3.00, Widen to 4 lanes. Unknown DO20080025-LRE Project Identified from 2007 Corridor Study: SR 88 Woodfords from County Rd to Kimmerling Rd. Widen from 2 to 4 lanes. Unknown DO20120013-LRE Centerville Rd at 1.7 M W of Jct SR 88. Culvert Replacement, Unknown $1,280,000 $11,000,000 $25,000,000 $302,373 DO20080012-LRE SR 756 Centerville Rd at 0.25 M E of the Jct of Waterloo Ln (Structure B-1601). DO 3.00 to 3.00, Bridge Railing Replacement. Unknown $150,000 DO20080015-LRE SR 757 Mottsville Lane at 2.10 M E of Jct of SR 206 (Structure B-1330). DO 2.00 to 2.00, Bridge Repair. Unknown $150,000 DO20080026-LRE Project Identified from 2007 Corridor Study: Dressler Rd from SR 88 to US 395. Build 3 miles of new road (Dressler Lane extension). Unknown DO20080027-LRE Project Identified from 2007 Corridor Study: New road south of Pinenut Rd to the Carson City Freeway. Build 20 miles of new 4 lane road (East side bypass). Unknown $268,000,000 Total Proposed Expenditure: $637,302,822 Information presented is subject to revision. Doc Date: October 1, 2014 $46,000,000
© Copyright 2024 ExpyDoc