MOC Structural Foundation Repairs, BD 2014

City of Glenwood Springs
Purchasing Department
th
101 West 8 Street
Glenwood Springs, Colorado 81601
ADDENDUM NUMBER TWO FOR
MUNICIPAL OPERATIONS CENTER STRUCTURAL
FOUNDATION REPAIRS, RE-BID
BID NUMBER BD 2014-012
THIS ADDENDUM MUST BE ACKNOWLEDGED.
THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION.
The following information is being added as a part of the bid specifications:
MOC Structural Foundation Repairs, BD 2014-012
Question: There is no asphalt specification in the documents that I can find. The only
thing I see is an Asphalt Paving Section detail and an Asphalt Patch Detail on sheet
CD2.0. The asphalt paving detail calls for PG 64-28 (a modified asphalt). Can you
change this to our typical everyday mix for this area PG 58-28 or PG 64-22? This will
save some money and should work just fine.
Answer: The asphalt mix spec can be changed. The City does not have an asphalt mix
specification. We usually use what the local supplier has and the CDOT Specification for
this region.
Question: Well we are trying to find out who will be responsible for relocating/ removing
utilities around the building specifically at the South east corner of the building the
transformer that sits on a small concrete slab appears to be right in the excavation area.
Answer: The transformer is the main power feed to the MOC, RFTA, and the commercial
complex on Midland where the Habitat Restore is located. The contractor will be
responsible for placing the conduit. The City will relocate the transformer, electrical
City of Glenwood Springs, Purchasing Department, 101 W. 8th Street, Glenwood Springs, Colorado 81601
970-384-6445, 970-945-4388 (fax)
lines, and fiber optic to the south side of the drive isle. There should be no connections to
water or sewer mains, so these utilities will need coordination with City of Glenwood
Springs. The contractor will be responsible for coordinating with gas, telephone and
other utilities.
Question: I have just completed my takeoff and I come up with 29,227 square feet in
phase 1 for asphalt paving. That equals 730 tons at 4” depth. The bid schedule is calling
for 1150 tons. Could you guys double check that quantity and clarify?
Answer: Here is the answer on the quantities. The design team accidently included
Phase 1 and Phase 2 in the asphalt quantities. Kevin is in agreement with the contractor
on his quantity for the asphalt.
Question: Dave mentioned that you are only bidding Phase 1 of the documents. Can you
please confirm this?
Answer: We will only be constructing phase 1.
This addendum must be acknowledged.
This Addendum may be faxed to 970-945-4388.
PRINT OR TYPE YOUR INFORMATION
Name of Company: ____________________________________________
Fax: _____________
Address: ________________________
City/State: ________________
Zip: ______________
Contact Person: ___________________
Title: _____________________
Phone: ___________
Authorized Representative’s Signature: ____________________________
Phone: ___________
Printed Name: ____________________
Date: _____________
Title: _____________________
City of Glenwood Springs, Purchasing Department, 101 W. 8th Street, Glenwood Springs, Colorado 81601
970-384-6445, 970-945-4388 (fax)