PUBLIC MENASOL 2014 DUBAI PREPARING FOR SAUDI ARABIA TRACTEBEL ENGINEERING 07/05/14 CHOOSE EXPERTS, FIND PARTNERS PREPARING FOR SAUDI ARABIA PUBLIC TABLE OF CONTENT • Introduction – Experience in CSP • Tractebel Engineering presentation • Preparing for Saudi Arabia – Solar resources assessment – Water scarcity – Grid integration – Industrial integration 07 05 14 2 INTRODUCTION 07/05/14 PUBLIC INTRODUCTION Experience in CSP • 2004-2005. Detailed Engineering PS-10 Tower Plant for Abengoa • 2007-2011. Consulting engineering for several 50MW Parabolic Trough Plants with Ayesa – Feasibility studies, conceptual and basic engineering – PT testing facilities and R&D projects (plant modelling, TES, hybridization) – Technical advisor for MASEN Noor1 160MW plant in Ouarzazate (Morocco) • 2011-2012. Owners Engineer Project Director for two 50MW Parabolic Trough Plants for FCC Energy & Mitsui • 2012-2013. Renewable Energy Product Manager in Middle East with Tractebel Engineering – Technical advisor for KACARE, ESKOM, ADB, IPP bidders 3 PREPARING FOR SAUDI ARABIA PUBLIC TABLE OF CONTENT • Introduction – Experience in CSP • Tractebel Engineering presentation • Preparing for Saudi Arabia – Solar resources assessment – Water scarcity – Grid integration – Industrial integration 07 05 14 4 5 PUBLIC 5 KEY FIGURES 2012 Turnover: 478 M€, of which 48% is generated outside of Belgium & France 3300 highly skilled people, present in 20 countries BY REGION BY SECTOR 3% 1% 19% 7% 28% 6% 4% 20% 10% 15% 52% 13% 20% 2% Nuclear Thermal Power Hydro Power Renewables Gas Power transmission Infrastructure Belgium/France Rest of Europe Latin America Africa Asia Middle East Rest of the world 6 07/05/14 PUBLIC TRACTEBEL ENGINEERING > … has engineered 7 Nuclear Power Plants > 6,000 MWe over 90 Hydro Power Plants > 40,000 MWe over 20 Coal Fired Power Plants > 6,000 MWe over 40 Combined Cycle Power Plants > 25,000 MWe over 30 Sea Water Desalination Plants > 1,000 MIGD or > 4.5 Mm3/d over 30 Cogeneration Plants > 1,000 MWe over 80 Wind Farms > 5,000 MWe over 30 Biomass Plants > 3,500 MWe over 30 Solar Plants > 250 MWe over 500 Projects for HV Substations, HV Lines and HV Cables over 25 LNG Terminals over 60,000 km of Gas Pipelines over 10 Underground Gas Storage Installations over 30 Gas Compression Stations TRACTEBEL ENGINEERING PUBLIC RENEWABLE ENERGY SERVICES WIND POWER All RE Technologies BIOMASS SOLAR • Small scale • Onshore windfarms • Large scale • Offshore • Coal to biomass windfarms conversion • Concentrated EMERGING • Geothermal for heating and power Solar Power • Solar PV • Solar CPV • Tide, waves, streams • Related studies • Energy storage Whole project lifecycle : Development & Realisation All assignments : OE, EPCM, Consulting 07/05/14 7 7 8 PUBLIC TE’s Solar Energy activity UNITED ARAB EMIRATES MOROCCO SAUDI ARABIA CHILE SOUTH AFRICA INDIA 07/05/14 PREPARING FOR SAUDI ARABIA PUBLIC TABLE OF CONTENT • Introduction – Experience in CSP • Tractebel Engineering presentation • Preparing for Saudi Arabia – Solar resources assessment – Water scarcity – Grid integration – Industrial integration 07 05 14 9 07/05/14 PUBLIC PREPARING FOR SAUDI ARABIA • Solar resources assessment • Water availability • Grid integration • Industrial integration solar field sizing plant water cycle design Thermal Energy Storage sizing Local industry and jobs creation 10 07/05/14 PUBLIC SOLAR RESOURCES ASSESSMENT • High uncertainty - Humidity, dust, sand storms - Forecast from satellite data vs real measured data on site 20% lower in similar weather conditions - Critical impact in the business case - KEY -> on-site meteo station & good resource assessment • Optimized LCOE and plant performance - Solar field optimization according to the available solar resources 11 07/05/14 PUBLIC WATER AVAILABILITY • Middle East - Water scarcity - Power & Water problem coupled • Air cooled condenser - 80% less water consumption • Mirrors washing strategies – Adjust washing cycles to targeted mirrors reflectivity – Reduce washing if energy is dumped (e.g. summer) 12 April-14 WETE X PUBLIC 13 GRID INTEGRATION • Energy demand – 80-90% Cooling • Winter peak – 50% summer peak -> matching with DNI yearly distribution • Summer typical day – Midday peak associated with cooling – Small evening peak associated with lighting – High night temperature - > Night demand similar to day demand • Low REN penetration ~ 10% - Short or mid term TES can help to reach the midday and evening peaks • High REN penetration ~ 50% - CSP must “support” the system - Long term TES match the demand April-14 PUBLIC INDUSTRIAL INTEGRATION • Understand that social goals are important too • Local industry – Existing industry. What can be supplied locally nowadays? – New industry. What can be supplied locally to reduce the cost? • Jobs creation – Knowledge transfer • International & local partnerships is KEY WETE X 14 THANK YOU FOR YOUR ATTENTION www.tractebel-engineering-gdfsuez.com CHOOSE EXPERTS, FIND PARTNERS PUBLIC
© Copyright 2024 ExpyDoc