PLANNING APPLICATION: 14/00679/PPP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports on Applications The Proposal This application seeks planning permission in principle for the erection of 3 detached houses along the northern edge of Portgordon, to the north of Gordon Street. This application forms one of three applications submitted by the same applicant for groups of three houses (9 houses in total) along this northern edge of Portgordon. The reference numbers of the other applications are 14/00677/PPP and 14/00678/PPP and have also been referred to this committee meeting for determination. A separate access for each plot is proposed via the existing road which runs immediately to the south of the proposed sites. Indicative site layouts have been provided, which indicate two car parking spaces, waste storage area, drying area within each site and a small area of open garden ground per house. In terms of plot size, Plot 1 measures approx 270 square metres, Plot 2, 230 square metres and plot 3, 210 square metres. Indicative house designs have also been provided which show 1 and ¾ storey dwellinghouses with traditional proportions and features such as skew tabling, chimneys and sash windows with vertical proportion. The houses are to be finished in harl on the walls and roof covering of natural slate or red pan tile to match existing neighbouring properties. The houses are to be served via public water and sewage system and a SUDs scheme provided in association with any detailed application. The Site The house sites are bounded to the south by the existing private road, with the houses at 24 to 46 Gordon Street beyond. The separation distances between the site boundaries and the boundaries neighbouring properties is consistently approx 8 metres for each application. Window to window separation distances vary from between 18m and 30m. The site lies within the settlement boundary on land with no specific designation within the Local Plan. For the avoidance of doubt no part of the sites extends into the Coastal Protection Zone (CPZ). The sites consist of open areas of green space, which are presently utilised by neighbouring properties as drying greens and car parking. The sites are bounded to the east and west by existing garages utilised by neighbours, with further garages again used by a neighbouring properties separating plots 1 and 2 with open coastal (CPZ) grassland to the north and the Moray Firth beyond. Policy / Objections-Representations / Consultations - See Appendix History 13/01292/PPP - Change of use of land for garages storesheds and drying greens to form 9 new house plots on land at Portgordon East, to rear of Gordon Street Portgordon. Application withdrawn on 27 August 2013. 12/01842/PE - Pre application enquiry, advice offered amongst other things in relation to housing on the proposed sites, identified that the details submitted as part of the enquiry would depart from Local Plan policy, 27 November 2012 To the north west of the site 13/01712/PPP - Re-establish boatyard and slipway on previous site with new boathouse and cable ducting to shoreline at land at Portgordon east, to rear of Gordon Street, Portgordon. Planning permission granted 27 March 2014. Site lies approx 90m north west of the proposed houses. To the west of the site 11/01460/APP - Erection of a village hall and associated infrastructure - planning permission granted 11 November 2011. Site lies approx 161m to the west of the proposed houses. Advertisement The application has been advertised under neighbour notification procedures and as a potential departure from the development plan. Observations Section 25 of the 1997 Act as amended requires applications to be determined in accordance with the development plan i.e. the approved Moray Structure Plan 2007 and the adopted Moray Local Plan 2008 unless material considerations indicated otherwise. In this case the main planning issues are considered below. Impact on character of settlement (H3 and IMP1) In terms of layout, the applicants have outlined that "the development has been designed to take respectful cognisance of the shape and form of the existing townscape. The layout of the new houses takes referencing from both the grid-iron pattern of the 19th century planned village and the more informal topography of the raised beach and the existing track road network. The houses themselves are intended to be similar in scale and character to existing properties, without necessarily being pastiche in execution, and have been carefully positioned with due respect to the amenity of existing community. Akin to many residential properties found along the Moray coast, the houses will have minimal garden areas and freedom of access around them." In response the sites consist of open areas of green space, which are presently utilised by neighbouring properties as drying greens and car parking. This narrow strip of land between the existing houses of Portgordon and the grassland/foreshore area to the north, acts as a low density transition between the settlement and the wider landscape. The drying greens and garaging with open space surrounding, that permits public access throughout and fronts onto the foreshore, is a relatively unique settlement characteristic associated with traditional fishing villages along the Moray and Aberdeenshire coastline. This is considered to be a key feature in defining the character of the settlement of Portgordon. The ground covered by the sites was only ever incorporated within the settlement boundary of Portgordon in recognition of the presence of existing low density, low impact uses and not to encourage the development of the site for housing. The proposed housing (3 plots on 710 sq) would result in a cramped, overdeveloped appearance, which when viewed approaching from the east would be prominent and result in a stark contrast between the developed settlement line and wider grassland/foreshore at odds with the existing established character and settlement characteristics. The development would result in the loss of an important area of green space to the detriment character of the settlement as a whole and as such is not considered to comply with policies H3 and IMP1. As mentioned previously in this report, this application comprises one of three submitted by the same applicant for a total of nine houses within this narrow strip of land to the north but all within the settlement boundary of Portgordon. Each application assessed individually is not considered to comply with Local Plan policy as discussed above, however, for the avoidance of doubt any adverse impact on the character of the settlement identified in relation to the individual applications would only be exacerbated by the approval of multiple applications which would effectively form an additional high density, modern street to the north of this area of Portgordon eroding the historic character of this area of the settlement. The applicants have outlined that following the approval of the community hall and boatshed to the west and north of the site respectively (see history section) the principle of development to the north of Portgordon has already been established. In response each application should be considered on its own merits and given the considerable differences between the types of development concerned and the development plan policies applicable to each application, it makes it very difficult to draw any comparisons between the proposals. The indicative designs submitted show 1 and ¾ storey houses with traditional proportions, features and material finish are considered in general terms to be in keeping with the design of existing houses in the area, however, the acceptability of the designs proposed does not overcome the issues in relation to the principle of the development. The applicants have suggested a pre-determined ‘design code’ could be applied to each of the plots to ensure that the designs and materials used are in keeping with the village, but such matters would be more appropriately dealt with at or prior to any further application stage if the current applications were approved. No ‘design code’ would mitigate against the potential overdevelopment as mentioned above. In terms of the indicative designs submitted, it is important to remember that this application is for planning permission in principle only and design does not form part of the consideration of this application. However, it is worth noting that given the constraints in terms of site size, it is likely that any houses proposed would need to be developed over two floors, to achieve a reasonable level of accommodation. 1 and ¾ storey properties on these sites would emphasise the overdeveloped and cramped nature of the proposed sites and would also exacerbate the overall adverse impact on the character of this area within the settlement. The proposal therefore departs from the design, amenity and siting requirements of the above policies. Drainage and flood risk (2 i & j, EP5, EP7, H3 and IMP1) Following consultation with SEPA and Moray Flood Risk Management (MFRM), SEPA have confirmed that they have no objection to the development subject to a condition stipulating a minimal finished floor level of the houses. MFRM have confirmed that the application site is not shown to be at coastal flood risk, however the coastal food risk map only considers still water level and does not include storm surge or wave action. Therefore this site may be at flood risk. On this basis the applicant should provide information to demonstrate the site specific flood risk and incorporate any mitigation measures (as required). At the time of writing this report the applicant had yet to submit this additional information and therefore this issue forms an additional reason for refusal due to lack of information to fully assess this aspect of the development. MFRM have also identified that if approved a condition should be applied to the consent to ensure SUDs details be submitted and incorporated into any future detailed application for the site. Access and parking (T2, T5, H3 and IMP1) Following initial consultation with the Transportation Service clarification and additional information was sought from the applicants in relation to the indicative layout design submitted. At the time of writing this report this additional information was yet to be received and Transportation were asked to finalise their views based on the information submitted to date. With this in mind it was identified that there were some shortcomings with the indicative layout submitted such as, the private access track servicing the sites would need to be upgraded to a minimum of 3m wide with clear space for pedestrians to step out of the way of oncoming traffic and to provide space for utilities for the house plots. No information has been submitted regarding the upgrading of existing access onto the A940 at east end of site, which is currently steep, or with regard to the provision of the required visibility splays. A passing place would also be required on the access to the east between the A940 (public road) and Plot 3. However, notwithstanding the details shown on the indicative layout, in principle transportation have no objection to the development subject to conditions to ensure adequate information is submitted at the detailed application stage and that the access/parking arrangements are constructed to an acceptable standard. The issues raised can all be addressed as part of any detailed application submitted and therefore the access constraints identified do not justify refusal of this application for planning permission in principle. Developer Contributions (IMP3, IMP1 and H3) The Developer Contributions team have been consulted in relation to the development and confirmed that contributions would be sought in relation to "community, recreational elements and library facilities". The applicants have confirmed that they would be happy to make these contributions. Affordable Housing (H9) The applicants have indicated that the plots if approved will be marketed at an affordable level and that the development could contribute towards the Council's overall targets for affordable housing provision. This matter has been discussed with the Council's Housing service, who has confirmed that Portgordon is not a priority settlement for affordable housing provision and that the service would not wish to promote the site for affordable housing at this stage. On this basis, no mechanism was discussed or agreed with the applicant as the plots do not meet the criteria for provision of affordable housing and the proposal should be considered on the basis that they are for the mainstream housing market. Conclusions and Recommendation: Based on the above, the proposal is considered to be contrary to the provisions of the development plan and is recommended for refusal. Author/Contact Officer: Iain T Drummond Planning Officer Beverly Smith Manager (Development Management) Ext: 01343 563607 APPENDIX POLICY Moray Structure Plan 2007 and/or Moray Local Plan 2008 Policy 1: Development and Community The policy set out below identifies the strategic community development requirements for the delivery of the structure plan strategyThe Moray Structure Plan Strategy will be supported by: a) the identification within the local plan of the business and industrial land allowances set out in Schedule 1 and the provision of strategic business locations at Elgin and Forres Enterprise Park and business park opportunities at Buckie, Keith and Lossiemouth; b) the encouragement of tourism development opportunities; c) the identification within the Local Plan of the housing allowances set out within Schedule 2; d) the provision of affordable housing in association with new housing development where a demand is identified in the Local Housing Strategy; e) the encouragement of low impact, well-designed development in the countryside to support local communities and rural businesses; f) sustaining the vitality and viability of town centres through the support of opportunities and proposals for retail and commercial development in accordance with the sequential approach; g) promotion of the strategic transport links as set out in Proposal 2; h) the protection and enhancement and new provision of facilities for community use, healthcare, sport and recreation; i) the inclusion within Local Plans of a policy requiring appropriate developer contributions towards healthcare and other community facilities. Policy 2: Environment and Resources The Moray Structure Plan Strategy will be supported by: a) protecting international, national and local nature conservation and scenic designations from inappropriate development; b) protecting the wider natural environment and local biodiversity from inappropriate development and promote opportunities for environmental enhancement and restoration where possible; c) working in partnership with the Cairngorms National Park Authority and other interested parties to implement the objectives of the National Park; d) restricting development within coastal areas outwith settlements to only that in which social and economic benefits outweigh environmental impact; e) providing protection from development to the countryside around the towns of Elgin, Buckie, Keith, Forres and Lossiemouth; f) conserving and enhancing the areas built heritage resources and their settings; g) supporting proposals aimed at regenerating the area’s natural and built environment including good design; h) providing waste management facilities to deliver Area Waste Plan and National Waste Plan objectives and ensuring that new development is designed to facilitate waste management practices and promotes the minimisation of waste; i) promoting sustainable urban drainage systems (SUDS) in all new developments; j) promoting schemes to alleviate flooding in a sustainable and sensitive way using natural ecosystems and features where possible and also restricting development within flood risk areas following the guidance set out in the Risk Framework in SPP7: ‘Planning and Flooding’ and promoting flood risk management schemes to tackle flooding that threatens existing development and considering development proposals against the Flood Risk Framework set out in Table 5; k) safeguarding the area from pollution and contamination; l) promoting opportunities for the sensitive development of renewable energy and promoting renewable energy in new development; m) safeguarding resources for the production of minerals, preferred forestry areas, and prime agricultural land. H3: New Housing in Built-Up Areas New housing within settlement boundaries will be acceptable if: a. it does not adversely impact on the surrounding environment, and b. adequate servicing and infrastructure is available, or can be made available. Policy H9: Affordable and Special Needs Housing Proposals for new housing developments of 10 houses or more on designated or undesignated sites, will be expected to provide an "affordable housing" element. The specific contribution will be assessed at the time of the planning application, and will be informed by Moray Council’s Supplementary Guidance on Affordable Housing and the most recent Housing Needs Assessment. The preparation or revision of Supplementary Guidance will be subject of stakeholder consultation prior to adoption. There are various forms in which the affordable housing contribution can be provided (such as social rented; homestake; and others as listed in PAN74, para 11). Where the developer can demonstrate that there are exceptional site development costs, the requirement for affordable housing may be reduced, to ensure the cumulative burden on the overall development does not make the development unviable. Whilst the preference will be to locate affordable housing within the site of the related development, other options may include off site contributions, or through the provision of commuted payments. Policy T2: Provision of Road Access The Council will require that a suitable and safe road access from the public highway is provided to serve new development and where appropriate any necessary modifications to the existing road network to mitigate the impact of development traffic, and the provision of appropriate facilities for public transport, cycling, and pedestrians. Access proposals that have a significant adverse impact on the surrounding landscape and environment that cannot be mitigated will be refused. SPP17 details that there will be a presumption against new accesses onto a trunk road, and that the Scottish Executive will consider the case for such junctions where nationally significant economic growth or regeneration benefits can be demonstrated. T5: Parking Standards Proposals for development must conform with the Council’s policy on parking standards. T7: Cycling, Walking and Equestrian Networks The Council will promote the improvement of the cycling, walking, equestrian and motorised sport path networks within Moray. It will give priority to the path networks and to long distance routes including the Aberdeen to Inverness National Cycle Route and the Speyside Way. Development proposals that adversely impact on the routes and cannot be adequately mitigated will not be acceptable. Dependant on funding the Council will examine the possibility of an extension of the Elgin to Lhanbryde footpath network. E8: Coastal Protection Zone Development proposals within the Coastal Protection Zone (CPZ) as identified on the proposals map will be refused except: a. where there is an existing use, b. it is an appropriate extension or change of use to existing buildings, or replacement of existing buildings, c. for low intensity recreational or tourist use e.g. golf courses, driving ranges, sports fields, d. for uses directly related to agriculture, forestry and fishing. Proposals that are appropriate within the policy must not prejudice the objectives of the CPZ or adversely affect the ecological, geomorphological or landscape importance of the area. Development will not be permitted on any parts of the coast that are identified as being at risk from flooding or erosion. E9: Settlement Boundaries Settlement Boundaries are drawn around each of the towns, villages and rural communities representing the limit to which these settlements can expand during the Local Plan period. Development proposals immediately outwith the boundaries of these settlements will not be acceptable, unless the proposal is a designated "LONG" term development site which is being released for development under the terms of policy H2. EP5: Surface Water Drainage: Sustainable Urban Drainage Systems (SUDS) Surface water from development should be dealt with in a sustainable manner that avoids flooding and pollution and promotes habitat enhancement and amenity. All sites should be drained by a SUDS system or equivalent. A Drainage Assessment will be required for developments of 10 houses, or greater than 100 sq metres for non residential proposals. Applicants must agree provisions for long term maintenance to the satisfaction of the Council, SEPA and Scottish Water. EP7: Control of Development in Flood Risk Areas Proposals for development in areas considered to be at risk from flooding will only be permitted where a flood risk assessment to comply with the recommendations of National Guidance and be satisfactory to both SEPA and the Council is provided by the applicant. The assessment must demonstrate that any risk from flooding can be satisfactorily mitigated without increasing flood risk elsewhere. New development should not take place if it would be at significant risk of flooding from any source or would materially increase the possibility of flooding elsewhere. Due to continuing changes in climatic patterns, the precautionary principle will apply when reviewing any application for an area at risk from inundation by floodwater. The following limitations on development will also be applied to take into account the degree of flooding as detailed in National Guidance; a. in areas of little of no risk (less than 0.1%) there will be no general constraint to development. b. areas of low to medium risk (0.1% to 0.5%) will be considered suitable for most development. However, these areas will generally not be suitable for essential civil infrastructure such as hospitals, fire stations, emergency depots etc. Where such infrastructure has to be located in these areas or is being substantially extended, they must be capable of remaining operational and accessible during extreme flooding events. c. in areas of medium to high risk (0.5% or above) i. in built up areas most development may be acceptable if flood prevention measures exist, are under construction, or are planned. ii. essential civil infrastructure will generally not be permitted. iii. undeveloped and sparsely developed areas are generally not suitable for additional development. Exceptions may arise if a location is essential for operational reasons. EP9: Contaminated Land Development proposals on potentially contaminated land will be approved if: a. site specific risk assessments are undertaken by the applicant to identify any actual or possible significant risk to human health or safety, or to the environment and that any previous historic uses are not continuing to cause significant pollution to the water environment, and b. effective remediation measures are agreed to ensure the site is made suitable for any new use granted consent, and c. appropriate measures for the disposal of any contaminated material is agreed with the Council. The Council will consult SEPA in respect of pollution of controlled waters and licensing issues arising from remediation works. EP10: Foul Drainage All development within or close to settlements (as defined in the Local Plan) of more than 2,000 population equivalent will require to connect to the public sewerage system unless connection to the public sewer is not permitted due to lack of capacity. In such circumstances, temporary provision of private sewerage systems may be allowed provided Scottish Water has confirmed that investment to address this constraint has been specifically allocated within its current Quality and Standards Investment programme and the following requirements apply: i. systems shall not have an adverse impact on the water environment; ii. systems must be designed and built to a standard which will allow adoption by Scottish Water; iii. systems must be designed such that they can be easily connected to a public sewer in the future. Typically this will mean providing a drainage line up to a likely point of connection. All development within or close to settlements (as identified in the Local Plan) of less than 2,000 population equivalent will require to connect to the public sewerage system except where a compelling case is made otherwise. Factors to be considered in such a case will include the size and dispersal of the settlement, the size of the proposed development, whether the development would jeopardise delivery of public sewerage infrastructure and existing drainage problems within the area. Where a compelling case is made, a private system may be acceptable provided it does not pose or add to a risk of detrimental effect, including cumulative, to the natural and built environment, surrounding uses or the amenity of the general area. Consultation with SEPA will be undertaken in these cases. Where a private system is deemed to be acceptable (within settlements as above or small-scale development in the countryside) a discharge to land (either full soakaway or raised mound soakaway) compatible with the Technical Handbooks (which set out guidance on how proposals may meet the Building Standards set out in the Building (Scotland) Regulations 2004) should be explored prior to considering a discharge to surface waters. IMP1: Development Requirements New development will require to be sensitively sited, designed and serviced appropriate to the amenity of the surrounding area. It must meet the following criteria: a. the scale, density and character must be appropriate to the surrounding area, b. the development must be integrated into the surrounding landscape, c. adequate roads, public transport, and cycling and footpath provision must be available, at a level appropriate to the development, d. adequate water, drainage and power provision must be made, e. sustainable urban drainage systems should be used where appropriate, in all new developments f. there must be adequate availability of social, educational, healthcare and community facilities, g. the development should, where appropriate, demonstrate how it will incorporate renewable energy systems and sustainable design and construction. Supplementary Guidance will be produced to expand upon some of these criteria, h. provision for the long term maintenance of public landscape and amenity areas must be made, i. conservation of natural and built environment resources must be demonstrated, j. appropriate provision to deal with flood related issues must be made, including the possibility of coastal flooding from rising sea levels and coastal erosion, k. pollution, including ground water must be avoided, l. appropriate provision to deal with contamination issues must be made, and m. the development must not sterilise significant workable reserves of minerals, prime quality agricultural land, or preferred areas for forestry planting. n. where appropriate, arrangements for waste management should be provided. Policy IMP3: Developer Contributions Contributions will be sought from developers in cases where, in the Council’s view, a development would have a measurable adverse or negative impact on existing infrastructure, community facilities or amenity, and those contributions would have to be appropriate to reduce, eliminate or compensate for that impact. Where the necessary contributions can be secured satisfactorily by means of planning conditions attached to a planning permission, this should be done, and only where this cannot be achieved, for whatever reason, the required contributions should be secured through a planning agreement. T1 Speyside Way and Coastal Footpath The routes of the Speyside Way Long Distance Footpath and the Moray Coast Trail through Portgordon will be safeguarded and protected from development. T2 Sustrans Cycle Route The route of the SUSTRANS long distance cycle route through Portgordon will be safeguarded and protected from development. OBJECTIONS-REPRESENTATIONS 53 letters of representation were received from the following people listed below, 14 were in support of the development and 39 objected to the proposals: Mrs Maureen Burrows of 2 Garden Lane Portgordon Buckie AB56 5SF Mrs Liz Knight of Sunnybrae Slackend Portgordon AB56 5BS Mr Andy Logan of 12 Duke Street Portgordon Buckie AB56 5RH Mr Robert Wheeler of 13 Gordon Street Portgordon AB565QR Mr Jeremy Burrows of 2 Garden Lane Portgordon Buckie AB56 5SF Mr William Fitzsimmons of 19 Gordon Street Portgordon AB56 5QR Mrs M Donaldson of 28 Richmond Place Portgordon Buckie AB56 5QX Mr Paul Brinton of 5 West High St Portgordon Buckie AB56 5QS Mrs Elaine Wilson of 14 Lennox Place Portgordon Buckie AB56 5Y Mr Gordon Bowie of 8 Richmond Terrace Portgordon AB56 5RA Mrs Sandra Anderson of 40 Gordon Street Portgordon Buckie Moray AB56 5QR Mrs Carol Mason-Corkery of 36 Gordon Street Portgordon Buckie Moray AB56 5QR Mr Graeme Smith of 32 Gordon Street Portgordon Buckie Moray AB56 5QR James and Carolyn MacKenzie of 28 Gordon Street Portgordon Buckie Moray AB56 5QR Mr Frank Knight of Sunnybrae Slackend Portgordon AB56 5BS Mr Stuart Farquhar of Cressfield St Abbs Road Coldingham TD14 5NR Mrs Christine Crammond of 4B Stewart Street Portgordon Buckie Moray AB56 5QT Gill Lacamp of 44 Gordon Street Portgordon Buckie Moray AB56 5QR Mr A Cairns of 45 Gordon Street Portgordon Buckie Moray AB56 5QR Mr Stuart McGuigan of 32 Allan Street Aberdeen AB10 6HD Mrs Alison Farquhar of 6 Cathcart Street Portgordon AB565RU Mrs Doreen Smith of 32 Gordon Street Portgordon Buckie AB56 5QR Mr Garry Farquhar of 6 Cathcart Street Portgordon AB56 5RU Mr Ross Ackroyd of 13 Thwaites Avenue Ilkley LS29 8EH Mr Duncan Rumbles of 15 Richmond Place Portgordon Buckie AB56 5QX Mr Douglas Wilson of 14 Lennox Place Portgordon AB56 5RY Mrs Sonia Lawrance of 39 Gordon Street Portgordon Moray AB56 5QR Mr Michael George of 2 Shore Street Portgordon Buckie AB56 5RW Mr Tim Coffey of The Grove Cabragh Thurles County Tipperary Ireland Mr Jake Burrows of 2 Garden Lane Portgordon Buckie AB565SF Mrs Barbara Coffey of The Grove, Cabragh Thurles County Tipperary Ireland Mrs Caroline Edwards of 9 Richmond Place Portgordon Buckie AB56 5QX Mrs Ella Kingaby of 19 Hillview Drive Lively Ontario Canada P3Y 1H4 Mrs Ella Kingaby of 6 Cathcart Street Portgordon ab15 4ty Ms Lorraine Hall of 4 Shore Street Portgordon AB56 5RW Mr Daniel Farquhar of 10 Gairnshiel Place Aberdeen AB165NB Mrs Alison Proudfoot of 4 Shore Street Portgordon AB56 5RW Mr David Lawrance of 39 Gordon Street Portgordon Moray AB56 5QR Corinna Schwarz of NO ADDRESS GIVEN Mr Joe Reid of C/o Karine Suller Suller and Clark Planning Consultants Scoutbog Steading Oldmeldrum Aberdeenshire AB51 0BH Mrs Deborah Westover of 4 Saunders Tunbridge Wells TN4 8LB Mr Martin Bain of 7 Maple Court Coldwater Ontario Canada I0K 1E0 Mr David Webster of 70 Merkland Lane Aberdeen AB24 5RN Mr Paul Hay of 2 Reid Terrace Portgordon AB56 5RB Mr Ben Farquhar of 15 Gean Court Balmedie Aberdeenshire AB23 8ST Mr Sean Edwards of 9 Richmond Place Portgordon AB56 5QX Mr Kevin Bain of 8 Park Worthington, Ontario, Canada, P3Y 1H4 Mrs Jan Bayly of 107 Kantola Road Lively P3Y 1H4 Mrs Pringle George of 2 Shore Street Portgordon Buckie Ab56 5RW Mr Keith Hall of 5 Richmond Terrace Portgordon Buckie AB56 5RA Mr Rod Farquhar of West Cookney Netherley Stonehaven AB39 3SA Miss Denise Robson of 25 Gordon Street Portgordon Buckie AB56 5QR A summary of the main grounds of objection are provided below: Ground stability and damage to third party property The existing ground conditions are unstable as the sites lies on a shingle beach. The houses will not be able to withstand the force of storms Any construction work on this unstable ground will cause damage to objector's properties as they have no foundations. Comments (PO): Issues relating to the structural design of the proposed houses are matters that will be addressed as part of any future building warrant application and should not be taken into account in the determination of this application. Any damage to neighbouring properties as a result of the development is a private matter for any developer to address and is not a matter that can be taken into account in the determination of planning applications. Having said this, given the substantial works carried out in this area previously to install the Scottish water infrastructure which did not result in damage to neighbouring properties it is anticipated that the proposed houses could be constructed without any adverse impact. Public sewage infrastructure The existing sewage system has insufficient capacity to accommodate the new houses. Comments (PO): Scottish water have been consulted in relation to the development and have no objection to the approval of the application. Impact on amenity and character of surrounding village The proposals represent overdevelopment of the site Two and a half storey houses would not be appropriate for the area. The development will have an adverse impact on the historic character of Portgordon. Loss of view Loss of daylight for neighbouring properties. Impact on privacy of neighbouring properties. The development will have an adverse impact on the character of the Coastal Protection Zone. Although not within the CPZ the development by virtue of its scale and mass will seriously and detrimentally affect the nature of the CPZ and the character of the village and its setting. The drying greens are part of the character and history of the settlement and should be retained and preserved. Comments (PO): Issues relating to overdevelopment of the site and impact on the character of the settlement and surrounding area have been discussed in the observations section of this report where it is concluded that the development has an unacceptable impact and is recommended for refusal on this basis. With regard to loss of daylight and privacy impact this issue would be considered at any further detailed application stage if approved. Loss of view is not a material consideration and cannot be taken into account in the determination of this application. Flood risk and drainage The development is at risk of coastal flooding and run-off from the railway embankment and will increase the risk of flooding elsewhere. If the harbour wall is removed or reduced in size then these properties could be at risk from flooding. Comments (PO): At the time of writing this report the Moray Flood Risk Management Team did not have enough information to fully assess the development in term of coastal flood risk and as such the application has been recommended for refusal on this basis. SEPA have also been consulted and have no objection to the development subject to a condition to ensure the houses are built with a minimum finished floor level. MFRM have also highlighted that if approved a condition should be applied to the consent to ensure appropriate SUDs scheme is provided at the detailed application stage. Affordable Housing Specialist foundations will be required for the ground conditions of the sites, which will make them cost prohibitive and the houses will not be affordable as outlined by the applicants. Comments (PO): The proposed houses have been determined on the basis that they constitute mainstream housing and not affordable housing. Open plan layout The open plan areas around the houses are unlikely to remain as such when owners wish to demark their properties. Comments (PO): If recommended for approval this is a matter which could be controlled via condition. Speyside Way Walkers and cyclists using the Speyside Way which runs through the site will be put at increased risk with increased traffic in the area. Comments (PO): The Council's Access Manager has been consulted and has no objection to the approval of the application. Access and parking The access serving the sites is substandard and its increased use will result in road safety issues. There is inadequate parking provision for the houses. The development will result in a "rat run" along the rear of the existing houses. There is insufficient space for refuse vehicles to serve the proposed houses. Comments (PO): The transportation service has no objections to the principle of the development subject to conditions to ensure a safe access layout and adequate parking provision. They have, however, raised concerns regarding shortcomings of the indicative layout plans provided in support of the application. Noise impact Noise impact as a result of increased activity in and around existing properties. Comments (PO): Environmental Health has been consulted in relation to the development and has no objection to the approval of the application on noise impact grounds. Legal right to develop land Under the Law of Prescription the applicants have no right to develop the land. Comments (PO): Following clarification from the Council's Legal Service this issue is a private legal matter between the objectors and land owner and is not one which should restrict a decision being made on a planning application. Development contrary to emerging Local Development Plan The development is contrary to the requirements of the proposed 2015 Local Development Plan which identifies the site as ENV8. In the new proposed 2015 Local Development Plan this area is to be designated ENV8. This means that the decision to protect this storm beach has already been made. Why let development plans be passed in 2014? What is the point of using resources to devise this important plan for Moray just to ignore it? Comments (PO): The site is identified as an ENV area within the Emerging Local development Plan; however, the Emerging Plan has no material weight and cannot be taken into account in determining current applications. Sites should be considered through the development plan process The lack of housing being developed on other sites in Portgordon does not justify development of this site. The proper way to put forward such a proposal is through a bid to the development plan process and it is noted that no such bid was made. Comments (PO): This issue would not be relevant to the determination of the current planning application. Impact on natural environment The development will have a negative impact on protected plant species. The foreshore is a protected area. Major construction works could be harmful to the protected seal colony, which is just 300 m away. Comments (PO): Scottish Natural Heritage has been consulted in relation to the development and has no objection to the approval of the application. The proposed sites lie within the settlement boundary of Portgordon and not within the CPZ designation. Accuracy of plans The objector has outlined that the proposed location plans are inaccurate as it shows the parcel of land in his ownership in the wrong place. Comments (PO): Disputes relating to land ownership boundaries etc is a private legal matter between the applicants and objectors, the applicants have confirmed that the ownership details are correct to the best of their knowledge. This issue has however been highlighted to the applicants and they have reconfirmed the plot sizes to the Council. Garden ground There is a lack of private garden ground associated with the proposed houses which is not in keeping with the surrounding properties. Comments (PO): Many of the properties in the surrounding area have little or no garden ground as is typical of traditional fishing villages, therefore this issue is not considered to merit the refusal of the application Adverse impact on Scottish water infrastructure If you look at the plans from Scottish Water who put in our new sewage system you will see that the sewage piping that comes along the top of the shore cuts right across this planned housing site and enters the pumping station from the west. If any breakages of piping occur the rear of these town houses will be affected, and truly this is not a viable plan. Comments (PO): Scottish Water have been consulted in relation to the development and have no objection to the approval of the application. Comments made in favour of the development Impact on wider community The development will breathe new life into the village which is slowly dying. The development will encourage more families into the village which will in turn support the village school. Comments (PO): The development must be assessed in terms of Moray Development Plan policy any potential benefits to the wider community including school numbers etc does not justify approval of this application. Impact on amenity The proposed houses are far enough back from existing properties to ensure they will not pose a problem in relation to privacy, blocking light etc Comments (PO): With regard to loss of daylight and privacy impact these issues are discussed in the observations section of this report where it is concluded that there is insufficient impact to justify refusal on this basis. Impact on character of the village The development will enhance the appearance of the entrance to the village which is presently untidy. Comments (PO): Issues relating to impact on the character of the settlement and surrounding area have been discussed in the observations section of this report where it is concluded that the development has an unacceptable impact and is recommended for refusal on this basis. Structural stability of houses Building on shingle is a matter for professionals to decide upon and not the local people. If the existing garages can remain standing in storm conditions then it is likely that houses designed for the site can withstand such weather. Comments (PO): Issues relating to the structural design of the proposed houses are matters that will be addressed as part of any future building warrant application and should not be taken into account in the determination of this application. Speyside Way The development will protect the interests of the Speyside Way. Comments (PO): The Council's Access Manager has been consulted and has no objection to the approval of the application. CONSULTATIONS SEPA - No objections, subject to a condition relating to minimal finished floor levels. Moray Flood Risk Management - Requests additional information in order to fully assess the proposal in terms of flooding and recommends conditions in relation to SUDs provision. Scottish Natural Heritage - No objections. Regional Archaeologist - No objections. Lennox Community Council - No objections. Scottish Water - No objections. Transportation - No objections to the principle of the development subject to conditions to ensure a safe access layout and adequate parking provision. Concerns raised regarding shortcomings of the indicative layout plans provided in support of the application. Environmental Health - No objections. Contaminated Land - No objections. Moray Access Manager - No objections. Development Plans - The introduction of housing interspersed between the existing garages and drying areas is at odds with the character of Portgordon. This less developed area of land provides the context and connection between the existing strong building line and the foreshore. The introduction of what in effect would have the appearance of an additional row of houses have a detrimental impact on the character of the village and for this reason this area of land should not be developed for housing. Developer Contributions - Contribution sought towards "community, recreational elements and library facilities". Building Standards - No objections.
© Copyright 2024 ExpyDoc