Ref: No. 63447083/41300109 Dated 12.09.2014 SUPPLY ORDER To M/s. Cummins India Limited 35A/1/2 , Erandawana , Pune , 411 038 Maharastra Fax No: 020-25439490 PCC: By Speed Post VENDOR CODE: C0288 Sub: Limited Tender No. NCL/SGR/MMD/Sec-IV/41300109/39 dt 03/01/2014, Opened on 11/02/2014 for procurement 1No. QSK-19C Model Engine for BE1000 Hydraulic Excavator as a float Ref: (i) Your Offer No. AO/SGR/SL-23-Q/ dated 08/02/2014 (ii) Your Letter No. AO/SGR/SL-23-Q/3581 dated 20/02/2014 (iii) Your Letter No. AO/SGR/SL-23-Q/3606 dated 19/03/2014 (iv) Your Letter No. AO/SGR/SL-23-Q/3618 dated 29/03/2014 (v) Your Letter No. AO/SGR/SL-23-Q/ dated 21/05/2014 (vi) Your Letter No.AO/SGR/SL-23-Q/ dated 14/08/2014 Dear Sirs, With reference to the above, we hereby place our Supply Order on you for supply of the following material(s). The supply shall be governed by the specification, prices, terms & conditions mentioned hereunder and also unless otherwise specified as per General Terms & Conditions enclosed with the NIT. SCOPE OF SUPPLY: Sl. No. 1 Description of Item Qty. (Nos.) 01 Basic Price / Unit Extn. Value (Rs.) (Rs.) Rs. 59,56,999.00 Rs. 59,56,999.00 Cummins Model QSK19C Engine for BE 1000 Hydraulic Excavator, Part No./Model No. QSK19C ( other technical details as per enclosed Annexure-A) Add Excise Duty & Edu.Cess @ 10.30 % Add CST @2% against form “C” Sub Total Add Freight Charges @ Rs.48000/Engine Add Insurance Charges @ 0.0125 % on (Basic + ED & Cess) Purchase Value(FOR Destination) Add Entry Tax @ 1% on Landed Value Total Purchase Value (FOR Destination) incl. Entry tax Rs. 6,13,570.90 Rs. 1,31,411.40 Rs. 67,01,981.29 Rs. 48,000.00 Rs. 821.32 Rs. 67,50,802.62 Rs. 67,508.03 Rs. 68,18,310.64 TOTAL LANDED VALUE : Rs. 68,18,310.64 (Rupees Sixty Eight Lakhs Eighteen Thousand Three Hundred and Ten and Paisa Sixty Four only) Ref: No. 63447083/41300109 Dated 12.09.2014 TERMS & CONDITIONS: 1. BASIS OF PRICE: Prices are on Firm & on FOR Destination basis inclusive of Packing & Forwarding Charges and any other charges up to destination. The prices shall remain firm till completion of supplies. 2. PACKING & FORWARDING CHARGES: Nil, to be borne by you. 3. EXCISE DUTY & EDU. CESS. : Extra as applicable at the time of supply. Present rate of Excise Duty is 10.30 % on Basic Price. Firm will provide Cenvatable Invoice along with supplies to avail NCL benefit of Cenvat Credit. 4. CST: Extra as applicable. Present rate is 2 % against form “C”. 5. FREIGHT & INSURANCE CHARGE: Extra, to be reimbursed @ Rs. 48000/- per Engine. 6. INSURANCE CHARGE: Extra, to be reimbursed @ 0.0125% of Basic + Excise Duty & Edu Cess i.e. Rs. 821.32 per Engine. Safe arrival of materials at destination will be the responsibility of the supplier. 7. ENTRY TAX : Extra @ 1% to be paid by Consignee/Paying Authority directly to Sales tax authorities. 8. DELIVERY PERIOD: Within 06 months from the date of placement of supply order. 9. PAYMENT TERM: 100% payment including all taxes and duties shall be made within 21 days of receipt and acceptance of materials at site or submission of bill(s) whichever is later. The payment shall be made by “Electronic Fund Transfer” (EFT) or e-payment. Suppliers will be requested to indicate EFT No. and other relevant details in their bill(s). 10. CONSIGNEE: Depot Officer , Regional Stores, Central Workshop , Jayant Northern Coalfields Limited 11. PAYING AUTHORITY: The Area Finance Manager, CWS, Jayant, NCL , (MP) 12. BANKER’S NAME: State Bank of India , Morwa Branch , Singrauli , Current A/c No.: 10773219155. 13.. SUBMISSION OF BILLS: The Invoice/Bill for 100% amount with taxes & duties stamped and pre-receipted shall be submitted in triplicate to the Paying Authority with the following documents: (i) Receipted Challan (ii) Pre-despatch Inspection Certificate, if any. (iii) Guarantee/Warranty Certificate (iv) Maker’s test –cum- Inspection Certificate (v) Any other document required as per order duly authenticated. A set of above documents should be submitted to the consignee and to this office as well. 2 Ref: No. 63447083/41300109 Dated 12.09.2014 14. PACKING: Consignment should be securely packed & marked as per standard practices/ BIS Norms to withstand the rigorous of transport to prevent any loss/damage or pilferage in transit and ensure safe arrival at destination. 15. MODE OF DESPATCH & ROAD PERMIT: Road transportation on Door Delivery basis at your risk. As per present rules of UP State Govt, Road Permit is required to be accompanied with each supply in case of Road Transportation. the same may be obtained from the consignee before dispatch of material. 16. LOWEST PRICE CERTIFICATE: You shall certify on the body of each bill that the “prices charged are the lowest and is the same as applicable to other Government departments / Undertakings including CIL and its subsidiaries”. 17. INSPECTION: Final Inspection: Final Inspection shall be carried out by SO(Excv) of the area or the authorized representative of GM(Excv.) as the case may be and the same shall be final. The stores found defective or not in accordance with the supply order specification will be rejected and intimated for free replacement within 30 (thirty) days from the date of intimation. 18. RISK PURCHASE: In the event of failure to deliver or dispatch the stores within the stipulated date / period of the supply order, or in the event of breach of any of the terms and conditions mentioned in the supply order, Northern Coalfields Limited have the right to purchase the stores from elsewhere after due notice to you at your risk and cost. It is mentioned clearly that in the event of your failure as detailed above, the cost as per risk purchase exercise may be recovered from the bills against any other supplies pending at NCL and also in any other Subsidiary Company/Coal India Ltd. 19. LIQUIDATED DAMAGE CLAUSE: In the event of failure to deliver or dispatch the stores within the stipulated date/period in accordance with the specifications mentioned in the supply order and in the event of breach of any of the terms and conditions mentioned in the supply order, NCL should have the right:a) To recover from you as agreed liquidated damages, a sum not less than 0.5 % (half percent) of the price of any stores which you have not been able to supply as aforesaid for each week or part of a week during which the delivery of such stores may be in arrears limited to 10% (Ten percent). Wherever felt necessary, the limit of 10% can be increased to 15% at the discretion of Head of the Materials management Division of NCL. b) To purchase elsewhere, after due notice to you on the account and at the risk of the defaulting supplier the stores not supplied or others of a similar description without canceling the supply order in respect of the consignment not yet due for supply or, c) To cancel the supply order or a portion thereof and if so desired to purchase the stores at the risk and cost of the defaulting supplier and also, d) To extend the period of delivery with or without penalty as may be considered fit and proper, the penalty, if imposed shall not be more than the agreed liquidated damages referred to in clause (a) above. e) Whenever, under this contract, a sum of money is recoverable from and payable by the supplier, NCL shall be entitled to recover such sum by appropriating in part or in whole by deducting any sum or which at any time thereafter may become due to you in this or any other contract. Should this sum be not sufficient to cover the full amount recoverable, you shall pay NCL on demand the remaining balance. The supplier shall not be entitled to any gain on any such purchase. 3 Ref: No. 63447083/41300109 Dated 12.09.2014 20. FORCE MAJEURE: If the execution of the contract/supply order is delayed beyond the period stipulated in the contract/supply order as a result of outbreak of hostilities, declaration of an embargo or blockage or fire, flood, acts of nature or any other contingency beyond the supplier’s control due to act of God, then the NCL may allow such additional time by extending the delivery period as it considers to be justified by the circumstances of the case and its decision in this regard shall be final. If and when additional time is granted by the purchaser, the contract/supply order shall be read and understood as if it had contained from its inception the delivery date as extended. Power failure will not be considered as a force majure conditions. (a) You will advise, in the event of your having to resort to this clause, by a registered letter, duly certified by the local chamber of commerce, or statutory authorities, the beginning and end of the causes of the delay, within 15 days of the occurrence and cession of such force majeure conditions. In the event of delay last out of force majeure, NCL will reserve the right to cancel the contract, and provisions governing termination of contract as stated in the bid documents will apply. (b) For delay arising out of Force Majeure, you will not claim the extension in completion date for a period exceeding the period of delay attributable to the causes of force majeure and neither NCL nor you shall be liable to pay extra cost provided it is mutually established that the force majeure conditions did actually exist. 21. PRICE FALL CLAUSE: The price charged for the stores supplied against this order by you shall in no event exceed the lowest price at which you sell or offer to sell the stores of identical description to any other organization during the period of contract. If you at any time during the period of contract reduces the sale price, sells or offers to sell such stores to any other organization at a price lower than the priced chargeable under this contract, you shall forthwith notify such reduction of sale price to the undersigned and the price payable under the contract for stores supplied after the date of coming in force of such reduction in sale price shall stand correspondingly reduce 22. WARRANTY GUARANTEE You shall give guarantee/warrantee for satisfactory performance of the Engine for a period of 24 months or 6000 working hours from the date of commissioning or 30 months from the date of receipt & acceptance of materials at consignee’s end whichever is earlier. If any defect is found / occurs due to faulty material, design or workmanship, you shall remedy such defects at your own cost. If it becomes so necessary for you to replace or to renew any defective part, such replacement or renewal shall be made by you 100% free of cost without any extra cost to Northern Coalfields Limited. The new goods should be supplied on FOR Destination basis free of cost. Warranty replacement should be completed within a reasonable period maximum within one month from the date of claim based on joint inspection for Indigenous goods and within three months from the date of claim for Imported goods free of cost up to ultimate Consignee’s end. All cases of warranty replacements will be decided on the basis of joint inspection of the failed items held between the user's representative and the supplier's representative. 4 Ref: No. 63447083/41300109 Dated 12.09.2014 23. IDENTIFICATION MARK:- The word “NCL” along with Manufacturer’s distinctive identification mark / symbol as also the part no. must be clearly embossed / punched / engraved on each and every item, as far as practicable, at a visible place, which is not subjected to normal wear and tear, for convenience of identification any time. Apart from this a tag may be attached in each part / item giving identification mark, part no. description. However, for high precision items where embossing / engraving /punching is not possible shall be packed separately & packing cover / box / case shall be tagged with the Identical Mark or Identification Mark be put by Metal Marker. OEM/OES of Equipment, OM of any tendered items or their authorized distributors are exempted from putting “NCL” Identification Mark. 24. INTERCHANGEABILITY OF PARTS: In case of spares, if against any item, it becomes necessary to supply the spare parts bearing a Part No. other than specified in the Supply Order, you will furnish the following certificate to the consignee before arranging supply of spares bearing different Part Number under advice to this office. “The changed part nos. are exact replacement of the parts ordered and are suitable for and will fit in the machinery in the existing fittings for which they are intended.” This order is also governed by the General Terms & Conditions of supply of stores enclosed with the NIT and all the terms & conditions thereof will be applicable unless otherwise specified in this order. You shall warrant that the item(s) supplied under this contract / supply order: (a) Is new, unused and or current design not likely to be discontinued or become obsolete in near future. (b) Is in accordance with the Contract Specifications (c) Shall have no defects arising out of design, materials and workmanship. 25. FITMENT CERTIFICATE: You should certify that the offered products are exact replacement/fully interchangeable to the original parts and will fit on the equipment for which these are intended for one- to- one basis against replacement of respective items without any modification to the existing system of the equipment. You should also certify that items to be supplied shall function properly in the said equipment. 26. TECHNICAL SUPPORT & SERVICE: You are to render technical support & Services to ensure proper usage, maintenance and satisfactory performance of supplied spares and to ensure quarterly visit of your service personnel for smooth functioning of the supplied items. 27. You must enclose Manufacturer’s Test cum Inspection Certificate along with supplied Engine You are requested to kindly acknowledge receipt and acceptance of order within 10 (ten) days of issue of order. In case no reply is received, it will be presumed that the order has been accepted by you. Yours faithfully, (R.Kumar) CM(MM) (D.K.Das) CM(MM)-I 5 Ref: No. 63447083/41300109 Dated 12.09.2014 Encl : Detailed technical specification- Annexure-A Copy forwarded to: 1. Consignee : The Depot Officer, CWS, Jayant , NCL 2. Paying Authority : The Area Finance Manager, CWS, Jayant , NCL 3. DT(O) Secretariat , NCL , Singrauli 4. GM: (Excv),/(Fin.), NCL , HQ, Singrauli 5. GM, CWS, Jayant 6. CVO, NCL, HQ 7. CGM, NCL Desk Office, 15,Second Floor, Gariahat Road, Kolkata-700019 8. GM(MM), CCL/BCCL/ ECL/SECL/ WCL/ MCL/Incharge –NEC Indent No.: CPR/000129/13-14 dated 28.05.2013 Sanction No. & Date : EX/SGR/353/2013/1414 dated 29.09.2013 Regn. No. 41300109 dated 03.01.2014 B.C.No. NCL/HQ/BC/2014-15/HEMM Spares/Centralised/20 dated 08.09.2014 FC No. NCL/HQ/FC/2014-15/HEMM Spares/Centralised/18 dated 08.09.2014 (R.Kumar) CM(MM) (D.K.Das) CM(MM)-I 6 Ref: No. 63447083/41300109 Dated 12.09.2014 Annexure-A Detailed Technical Specifications: a. Cummins Model QSK 19C, 4 cycle, water cooled, electronic fuel control, turbo charged, after cooled diesel engine developing 600HP @ 1800 rpm. b. The engine characteristics and control system should be fully integrated with the Control System and operational characteristics of BE 1000 Shovel BEML Make, Maximum torque=2644Nm@1300 rpm. c. The engine should be environmentally certified for at least EPA Tier-I Cummins Diesel Engine Model : QSK 19C, 600 HP @ 1800 RPM Application: BE 1000 Hydraulic shovel The rating is guaranteed within 5% limit for site conditions of 150 M altitude , 736 mm Hg dry barometer , 29 degree C intake air t-+emp and 9.6 mm Hg water vapor pressure and has to be de-rated per site conditions. 01- AIR INTAKE SYSTEM: a) AIR INTAKE MANIFOLD 02- ENGINE EXHAUST SYSTEM : a) EXHAUST MANIFOLD DRY TYPE b) TURBOCHRGER 03- ENGINE FUEL SYSTEM : a) FUEL FILTER AND ITS SUTAIBLE PUMPING b) FUEL PUMP 04- ENGINE COLLING SYSTEM: a) THERMOSTAT INSTALLED IN THE ENGINE COOLANT OUTLET b) WATER PUMP-ONE NUMBER , ENGINE MOUNTED 05-ENGINE LUBRICATION OIL SYSTEM : a) LUB OIL SUMP , MOUNTED ON ENGINE b) LUB OIL PUMP, GEAR DRIVEN , MOUNTED ON ENGINE c) LUB OIL COOLER , MOUNTED ON ENGINE d) DIP STICK , MOUNTED ON ENGINE 06- ENGINE STARTING SYTEM: a) ELECTRIC STARTER MOTOR 24VDC b) CHARGING ALTERNATOR, (24V) ENGINE MOUNTED NOTE : BATTERIES AND CABLES ARE NOT IN SCOPE OF SUPPLY 7 Ref: No. 63447083/41300109 Dated 12.09.2014 07- INSTRUMENTS & GAUGES & SENSORS : a) TEMPERATURE SWITCH b) PRESSURE SWITCH c) ECM & ENGINE WIRING HARNESS MOUNTED ON ENGINE 08- OTHER ENGINE PARTS CONSIST : a) FLYWHEEL b) ENGINE MOUNTED AIR COMPRESSOR 09- PARTS NOT MENTIONED ABOVE ARE IN CUSTOMER /OEM SCOPE. (R.Kumar) CM(MM) (D.K.Das) CM(MM)-I 8
© Copyright 2024 ExpyDoc