CITY OF PHOENIX WATER SERVICES DEPARTMENT Val Vista Water Transmission Main Rehabilitation Rural Road to River Drive on Rio Salado Parkway Project Overview The City of Phoenix Water Services Department and Kiewit Infrastructure West Co. is rehabilitating the Val Vista Water Transmission Main along Rio Salado Parkway between Rural Road and River Drive, just west of Loop 101. The rehabilitation involves installing steel pipe liners into the existing pipeline. To gain access into the pipeline, Kiewit will use three access pits locations along Rio Salado Parkway (see map below). Overnight hours will take place between 5 p.m. and 5 a.m. within the pipe for welding. Traffic Restrictions Part of the median in Rio Salado Parkway between Perry Lane and Smith Road around Pit #7 will be temporarily removed and paved in order to maintain traffic flow with minimal queue time. This will provide two lanes westbound and one lane eastbound. Keeping traffic on the north side of the median on Rio Salado Parkway will provide the safest conditions to both travelers and construction workers during construction. What to Expect The tentative construction dates for each pit are the following: Pit 7: mid-September to mid-January 2015 Pits 4 & 5: early January 2015 to late June We are committed to open communication and working together with the community during construction. Ric Traeger Brown and Caldwell David Markert Kiewit Infrastructure West Co. Rio Salado Pkwy Price Rd 3rd St We are committed to a highly reliable water system and water supply. Proactive inspection programs minimize disruption and improve quality of life for Phoenix residents. Mario Brown, P.E. City of Phoenix Water Services Department Loop 101 Pit #7 River Rd Karsten Golf Course Tempe Marketplace Smith Rd Pit #5 We are committed to wisely using our water resources and protecting and enhancing community health and our natural environment. Project Personnel Loop 202 Perry Ln Pit #4 McClintock Rd Rural Rd Work will take place Monday - Friday with daytime work hours between 5 a.m. and 5 p.m. The median near Tempe Marketplace will be restored after construction of Pit #7. Traffic during construction of Pit #5 will be temporarily re-routed north of the median. There are no expected traffic restrictions for Pit #4 as it will be out of the roadway. We are committed to proactive planning for the needs of our community 5th St University Dr Legend Project Hotline: (602) 235-2896 Project No. WS85500424 081214 Access Pit Location Lane Restrictions NOTICE OF ROAD RESTRICTIONS Rio Salado Pkwy between River Road and Rural Road Early September 2014 – Late June 2015 More Information Inside Flyer c/o Central Creative 5025 N. Central Ave., #479 Phoenix, AZ 85012
© Copyright 2025 ExpyDoc