Val Vista Water Transmission Main Rehabilitation Rural Road to

CITY OF PHOENIX WATER SERVICES DEPARTMENT
Val Vista Water Transmission Main Rehabilitation
Rural Road to River Drive on Rio Salado Parkway
Project Overview
The City of Phoenix Water Services
Department and Kiewit Infrastructure
West Co. is rehabilitating the Val Vista
Water Transmission Main along Rio
Salado Parkway between Rural Road and
River Drive, just west of Loop 101. The
rehabilitation involves installing steel pipe
liners into the existing pipeline.
To gain access into the pipeline, Kiewit will
use three access pits locations along Rio
Salado Parkway (see map below).
Overnight hours will take place between 5
p.m. and 5 a.m. within the pipe for welding.
Traffic Restrictions
Part of the median in Rio Salado Parkway
between Perry Lane and Smith Road around
Pit #7 will be temporarily removed and
paved in order to maintain traffic flow with
minimal queue time. This will provide two
lanes westbound and one lane eastbound.
Keeping traffic on the north side of the
median on Rio Salado Parkway will provide
the safest conditions to both travelers and
construction workers during construction.
What to Expect
The tentative construction dates for each
pit are the following:
Pit 7: mid-September to mid-January 2015
Pits 4 & 5: early January 2015 to late June
We are committed to
open communication
and working together
with the community
during construction.
Ric Traeger
Brown and Caldwell
David Markert
Kiewit Infrastructure
West Co.
Rio Salado Pkwy
Price Rd
3rd St
We are committed to
a highly reliable water
system and water
supply. Proactive
inspection programs
minimize disruption
and improve quality
of life for Phoenix
residents.
Mario Brown, P.E.
City of Phoenix Water
Services Department
Loop 101
Pit
#7
River Rd
Karsten Golf Course
Tempe Marketplace
Smith Rd
Pit
#5
We are committed
to wisely using our
water resources
and protecting and
enhancing community
health and our natural
environment.
Project Personnel
Loop 202
Perry Ln
Pit
#4
McClintock Rd
Rural Rd
Work will take place Monday - Friday with
daytime work hours between 5 a.m. and 5
p.m.
The median near Tempe Marketplace will
be restored after construction of Pit #7.
Traffic during construction of Pit #5 will be
temporarily re-routed north of the median.
There are no expected traffic restrictions for
Pit #4 as it will be out of the roadway.
We are committed to
proactive planning
for the needs of our
community
5th St
University Dr
Legend
Project Hotline: (602) 235-2896
Project No. WS85500424
081214
Access Pit Location
Lane Restrictions
NOTICE OF ROAD RESTRICTIONS
Rio Salado Pkwy between River Road and Rural Road
Early September 2014 – Late June 2015
More Information Inside Flyer