Mondaspekte - Deutung für den August 2015

Mining Developments
in the Northern Territory
December 2014
This document contains a summary of likely new mining developments in the Northern Territory over the next 1-4 years. It is
not intended to be comprehensive and does not contain a number of projects that are at various stages of feasibility study.
All information should be confirmed with the proponent Company. For further information on mining developments, contact
the Director Mining Development of the NT Department of Mines and Energy or visit the website at www.minerals.nt.gov.au
or email to [email protected]
MINING DEVELOPMENTS SUMMARY – DECEMBER 2014 UPDATE
1. Recent (Past 24 months)
Company
Project
Location
Product
Development
Gemco
Matilda Zircon
(MZI Resources)
Crocodile Gold
Western Desert Res*
Xstrata
Aust Ilmenite Res *
GEEP2
Lethbridge
South
Cosmo Deeps
Roper Bar
McArthur River
SILL80
Groote Eylandt
Tiwi Islands
Manganese
Zircon
Plant upgrade
New deposit
Pine Creek
Roper River
Gulf
Roper River
Gold
Iron Ore
Zinc & Lead
Ilmenite (Ti, V)
Underground
New mine
Phase 3 Expansion
New mine
*indicates companies in Administration and/or Receivership
2. Pending (Next 12 months)
Company
Project
Location
Product
Development
AAM
Aard Metals
ABM Resources
ERA Ltd
Primary Gold
TNG Limited
Spinifex Bore
Warrego Tails
Twin Bonanza
Ranger 3 Deeps
Toms Gully
Mt Peake
Alice Springs
Tennant
Tanami
Jabiru
Darwin
Alice Springs
Garnet sands
Magnetite, Gold
Gold
Uranium
Gold
V, Ti, Fe
New mine
Reprocessing
New mine
U/G Expansion
Reopen mine
New mine
3. Potential (Next 12-48 months)
Company
Project
Location
Product
Development
Arafura Resources
Crocodile Gold
Crossland
Energy Metals
Gemco (BHPBiliton)
KGL Res (Kentor)
Metals X (Westgold)
Minemakers
MZI Resources
Rum Jungle Res
Sherwin Iron*
Territory Iron
Thor Mining
Tellus Holdings
Vista Gold
Nolans
Maud Creek
Charlie Creek
Bigrlyi
Eastern Leases
Jervois
Rover
Wonarah
Kilimiraka
Ammaroo
Sherwin Creek
Frances Creek
Molyhil
Chandler
Mt Todd
Alice Springs
Katherine
Alice Springs
Alice Region
Groote Eylandt
Alice Springs
Tennant
Tennant
Bathurst Island
Tennant
Roper River
Pine Creek
Alice Springs
Alice Springs
Katherine
Rare Earths
Gold
Rare Earths
U, V
Manganese
Copper, Silver
Gold, Copper
Phosphate
Zircon
Phosphate
Iron ore
Iron ore
Mo, W
Salt
Gold
New mine
New mine
New mine
New mine
Mine Expansion
Reopen mine
New mine
New mine
New mine
New mine
New mine
Mine Extension
Reopen mine
New mine
Reopen mine
Northern Territory Department of Mines and Energy
Page 2 of 11
PENDING MINE DEVELOPMENTS – NEXT 12 MONTHS
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource (uncut)
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
SPINIFEX BORE
Australian Abrasive Minerals Pty Ltd
Robert Brand – Director & Project Manager
Phone: (08) 9315 2177
Email: [email protected]
Approx 170 kms north east of Alice Springs
New open cut mine strip mining. Onsite processing wet screening plant to
produce concentrate and dry magnetic & electrostatic separation. Final
product trucked to Alice Springs for road/rail to Darwin or Adelaide.
Garnet sands
800,000 tonnes
25 years
Environmental – August 2011
Mining – pending
Construction – Dec 2014
Production – Q2 2015
Construction – 20 to 30
Production – 16 to 20
$14.4M
WARREGO TAILINGS PROJECT
Aard Metals Limited
Myles Fang – Executive Director
Phone: (02) 9235 3188
Email: [email protected]
48 kms west of Tennant Creek
Reprocessing of old tailings dams to extract magnetite (gravity and magnetic
separation) and possibly gold and copper.
Magnetite (potential gold & copper)
7.8 Mt of tailings to produce 2.92 Mt of Magnetite @ 67.1% Fe. (JORC).
The inferred resource also contains 119,000 ozs gold and 16,500 t copper.
Approx 6 years
Environmental – Nov 2011
Mining – pending
Development subject to finance. Pre-development MMP in place Jan 2013.
Construction – Q2 2015
Production – Q1 2016
Construction – 30 to 50
Production – 20 to 30
$20M
TWIN BONANZA
ABM Resources NL
Darren Holden – Managing Director
Phone: (08) 9423 9777
Email: [email protected]
630 kms northwest of Alice Springs
New mine. Stage 1 was 10,000t bulk sample in 2013. Stage 2 is open pit
mining with ore treated at the leased Coyote Processing Plant in WA, subject
to conditions precedent. Stage 3 will be dependent on ore-body performance
and includes potential underground operations.
Gold
Global Resource of 1.7Mt @ 11.7g/t gold for 640,000 ozs (Old Pirate)
Stage 2 is approx. 2 years & Stage 3 is estimated at 4 years.
Environmental – May 2014
Mining – MMP approval pending
Stage 1 complete in 2013. Stage 2 mining scheduled in Q1 2015, subject to
condition precedent on Coyote Processing Plant lease and mining approvals.
Construction – 20-40
Production – 68
Stage 2 – approx. $5M
Northern Territory Department of Mines and Energy
Page 3 of 11
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
RANGER 3 DEEPS
Energy Resources of Australia Ltd (ERA)
Andrea Sutton – Chief Executive
Phone: (08) 89243500 Email: [email protected]
Approx 260 kms east of Darwin
Exploration decline and underground exploration drilling of Ranger 3 Deeps
($120M) for resource definition to be completed in Q4 2014. The PreFeasibility Study (PFS) ($57M) is expected to be complete by end 2014 for
consideration by ERA Board in early 2015. Ore from proposed underground
mining operations to be processed in existing facilities.
Uranium (U3O8)
Estimated 12.2 Mt @ 0.285% U3O8 equating to 34,761 t of uranium oxide.
Until Jan 2021
Development proposals submitted on 16 January 2013. Draft Environmental
Impact Statement submitted 3 Oct 2014 and on display for public comment
until 12 Dec 2014. Mining approvals subject to environmental approvals.
Construction – Q2 2015
Production – Q4 2015
Construction – 100-150
Production – TBA
Includes $120M for exploration decline and $57M for PFS
TOMS GULLY
Primary Gold Limited
Clay Gordon – Managing Director
Phone: (08) 9364 9009 Email: [email protected]
Approx 90 kms east of Darwin
Reopen the underground Toms Gully Mine and refurbishment of the onsite
processing plant. Feasibility Study completed and assessing financial options
for immediate start to refurbishment to enable production in Dec 2015.
Gold
1.1 Mt @ 9.0g/t for 315,000 ozs. Reserve 775,000 tonnes at 6.9g/t Au
3 years +
Development proposals submitted in Dec 2013. EIS in preparation.
Construction – June 2015
Production – Dec 2015
Construction – TBA
Production – approx. 100
$26M
MOUNT PEAKE
TNG Limited
Paul Burton – Managing Director
Phone: (08) 9327 0900 Email: [email protected]
235 kms north of Alice Springs
Open pit mining & production of magnetite concentrate with potential
integrated onsite processing to produce high purity iron, vanadium and
titanium products. New processing technology developed. Pre-Feasibility
Study released in July 2012. Definitive Feasibility Study due Mar/Apr 2015.
High purity Vanadium (99% V2O5), Titanium (55% TiO2) & Iron (99.9% Fe2O3)
160Mt @ 0.3% V2O5, 5% TiO2, 23% Fe (120Mt Measured JORC)
Approx 20 years
Development proposals submitted July 2013. EIS in preparation.
Construction – Q4 2015
Production – Q4 2016
Construction – up to 350
Production – 175 - 250
Estimated $421M (Stage 1 – Direct Costs) from PFS
Northern Territory Department of Mines and Energy
Page 4 of 11
POTENTIAL MINE DEVELOPMENTS – NEXT 12 - 48 MONTHS
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
NOLANS BORE
Arafura Resources Limited
Brian Fowler – General Manager Northern Territory & Sustainability
Phone: (08) 8947 5588
Email: [email protected]
135 km northwest of Alice Springs
New mine. Open cut mining, beneficiation to a mineral concentrate and
subsequent chemical processing to produce rare earth intermediate product,
which will be shipped from Nolans to an international refining facility.
Rare earths with opportunity for phosphate and minor uranium products.
47 Mt containing 2.6% REO, 11% P205 (0.414 lb/t U3O8)
22 years based on current reserve
Environmental – EIS in preparation. Mining – subject to environmental
Feasibility study in progress. EIS in preparation. Investment decision in early
2015. Construction period up to 36 months starting in Q1 2016.
Construction – approx 500+ Operations – approx. 350+
Currently under revision. Targeting A$1.0-1.5 billion
MAUD CREEK
Crocodile Gold Corp
Jason Morin – General Manager NT
Phone: (08) 8982 4444 Email: [email protected]
Approx 285 kms SSE of Darwin and 20 kms E of Katherine
Possible open cut and/or underground mining operation. Ore likely to be
transported offsite for processing, probably to Union Reefs processing site.
Gold
Indicated 7.7Mt @ 3.5 g/t gold & Inferred 4.2Mt @ 2.55 g/t gold
Undetermined
Scoping Study completed in Q4 2012. Updated resource reported in 2013.
Mining proposal yet to be submitted.
Construction – TBA
Production - TBA
Construction – TBA
Production - TBA
TBA
CHARLEY CREEK
Crossland Strategic Metals Limited
Geoff Eupene – Executive Director/CEO
Phone: (08) 8981 5911
Email: [email protected]
Approx. 95 km WNW of Alice Springs
Potential new mine. Open cut mining & processing through a wet and dry
mineral concentrator to produce a high grade (40%+) TREO concentrate with
further refining to yield a high purity mixed rare earth carbonate product.
Rare earths and zircon
Indicated 387Mt containing 114,050 tonnes TREO & 195,000 tonnes zircon.
Inferred 418Mt containing 121,100 tonnes TREO & 220,000 tonnes zircon.
JORC compliant Scoping Study based on 20 years + (additional potential)
Development proposals yet to be submitted.
JORC compliant Scoping Study and economic appraisal complete. Drilling of
potential high grade areas in 2013. Feasibility Study in 2015 (subject to finance).
150
$156M
Northern Territory Department of Mines and Energy
Page 5 of 11
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
BIGRLYI
Energy Metals Limited
Weidong Xiang – Managing Director
Phone: (08) 9322 6904
Email: [email protected]
Approx 340 kms NW of Alice Springs
Potential open pit and underground mining with on-site processing through
simple acid leach circuit. Results of Pre-Feasibility Study released in June
2011. Feasibility and environmental studies continue.
Uranium
7.5 Mt @ 0.13% U308 for 21.1 M lbs U3O8 & 19.7M lbs V2O5
3.63 Mt @ 0.14% U3O8 for 11.2 Mlbs U3O8 & 15.7 Mlbs V2O5
Pre-Feasibility Study (PFS) based on 8 years
Development proposals yet to be submitted.
Construction – TBA
Production – TBA
Construction – TBA
Production – TBA
$181M (from PFS).
GEMCO – EASTERN LEASES
BHP Billiton Manganese Australia Pty Ltd
Mike Chapman – Study Manager Eastern Leases
Phone: (07) 3237 6574
Email: [email protected]
Approx 650 kms ESE of Darwin
Develop a number of additional quarries on the eastern leases, approx. 2 kms
east of the existing mine. Ore will be trucked to the existing GEMCO mine
facilities for processing and exported by the existing Milner Bay port, with no
changes or upgrades to these facilities.
Manganese
38 Mt of manganese ore
Eastern Leases will extend mine life by 4 years to 2031
Environmental: EIS in preparation Mining: pending environmental
Construction – Q1 2017
Production – Q3 2018
Construction – 90
Production – Existing Workforce
TBA
JERVOIS
KGL Resources (previously Kentor Gold)
Simon Milroy – Managing Director
Phone: (07) 3071 9003
Email: [email protected]
Approx 270 kms north-east of Alice Springs
Reopen old mine based on open cut for first 4 years and underground
operation from years 4 to 7. Sulphide ore processed via a conventional
flotation processing facility to produce a copper concentrate.
Copper concentrate with silver & gold credits plus a separate lead and zinc
concentrate.
23.5Mt @ 1.1% Cu & 22.1g/t Ag (includes 113,000oz gold)
7 years
Development Proposals (NOI) submitted in November 2013. EIS required for
environmental assessment by EPA. Pre-Feasibility Study expected Dec 2014.
Construction – Q2 2016
Production – Q4 2017
Construction – 300
Production – 200
Estimated approx. $192 M
Northern Territory Department of Mines and Energy
Page 6 of 11
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
ROVER PROJECT
Metals X Ltd (Previously Westgold)
Paul Hucker – Chief Operating Officer – Gold Division
Phone: (08) 9220 5700 Email: [email protected]
Approx 1100 kms S of Darwin and 80 kms SW of Tennant Creek
Development of new underground mine and possible new mineral field.
Feasibility studies in progress. Construction of exploration decline approved
for underground definition drilling of resource.
Gold and Copper (IOCG)
6.8Mt @ 5.57 g/t AuEq
Undetermined
Further drilling being undertaken. Feasibility studies in progress. Exploration
decline approved and commenced.
Construction – TBA Production - TBA
Construction – TBA Production - TBA
Estimate $101M (Scoping Study)
WONARAH/ARRUWURRA (STAGE 1)
Minemakers Limited
Neville Bergin – General Manager Projects Development
Phone: (08) 9264 7000
Email: [email protected]
250 kms east of Tennant Creek
Revised development proposal - proposed open cut mine, crushing and desliming of ore, processing on-site using improved hard process (IHP) to
produce super phosphoric acid (SPA) @ 70% P2O5. Phased development with
the first production train producing 181,000 t P2O5 per annum, progressively
increasing to 0.9 Mt per annum over an estimated six year period.
Super phosphoric acid (SPA)
842 Mt @ 18.1% P2O5 (10% cut-off ); 1,406 Mt @ 13.5% P2O5 (5% cut-off )
>30 years
Environmental: June 2013
Mining – pending
Construction & Production – Pending successful validation of IHP technology
Construction – 50 to 200
Production – 110 rising to 350 at full production
Estimated initial capital $350M increasing to $1.2B over 6 years.
KILIMIRAKA
MZI Resources Limited
Trevor Matthews – Chief Executive Officer
Phone: (08) 9328 9800
Email: [email protected]
Southwest corner of Bathurst Island
Proposed open cut surface dunal mining with onsite processing to produce
Zircon, rutile and ilmenite concentrate. Possible barging or port facilities for
transfer to freighters for export overseas.
Zircon, rutile and ilmenite concentrate
56.2 Mt containing 893,700 tonnes of heavy mineral
8-10 years
Environmental – 2016
Mining – Pending environmental
Construction – 2017
Production – 2018
Construction – TBA
Production – 50
TBA
Northern Territory Department of Mines and Energy
Page 7 of 11
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
AMMAROO
Rum Jungle Resources Limited
Chris Tziolis – Managing Director
Phone: (08) 8942 0385 Email: [email protected]
200 kms SE of Tennant Creek
New mine – open cut strip mining operations with crushing and screening to
produce Mechanically Beneficiated Ore. Also evaluating the options of
production of phosphoric acid or ammonium phosphate fertilizers. Notice of
Intent submitted in April 2014. Pre-Feasibility to be completed in Sept 2014.
Rock phosphate, phosphoric acid or ammonium phosphate fertilizers
Global Resource of 1.135 billion tonnes @ 14% P2O5 (10% cut-off)
Measured Resource of 138 Mt @ 15.7% P2O5 (10% cut-off)
25 years plus
Environmental – in progress Mining – pending environmental
Construction – 2016 /17
Production – 2017/18
Construction – TBA
Production – 110-200
$500 M +
SHERWIN CREEK (ROPER RIVER) IRON ORE PROJECT
Sherwin Iron Limited (Administrators and Receivers & Managers appointed)
Aaron Swaffield – KordaMentha
Phone: (07) 3338 0233
Email: [email protected]
475 kms southeast of Darwin and 120 kms east of Mataranka
Development of new iron ore mine at the Sherwin Creek deposit. Open cut
and surface strip mining. Direct Shipping Ore is mined, crushed and screened
and trucked to Darwin Port for export (initial 1Mtpa increasing to 3Mtpa).
Alternative transport options, including access to rail are being considered.
Iron ore (Hematite)
JORC resource of 488Mt @ 41.7% Fe (Mar 2012), including 41.1Mt @
57.8% Fe.
Estimate 20 + years (Initial DSO operation at Sherwin Creek is 6 years)
Environmental – in process Mining – pending environmental approvals
Subject to market conditions and receivership outcomes.
Construction – 150
Production – 100
$170M (DSO & Beneficiation operations)
FRANCES CREEK – ELIZABETH MARION AREA
Territory Resources Ltd (Territory Iron Pty Ltd)
Chris Masters – General Manager Operations
Phone: (08) 8976 8000 Email: [email protected]
Approx 180 kms SE of Darwin and 25 kms N of Pine Creek
Establishment of three new open cut pits within the existing Mineral Leases to
extend mine life. Ore will be trucked to the existing crushing and
beneficiation plant for processing. Processed ore will be trucked to the
existing rail siding and railed to Darwin Port for export.
Iron Ore
1.514 Mt @ 50.8% Fe (with cut-off grade of 40% Fe)
Approx. 2 years
Development proposals submitted in March 2014. EIS in preparation.
Construction – 2015/16
Production – 2015/16
Construction – TBA
Production – TBA
TBA
Northern Territory Department of Mines and Energy
Page 8 of 11
Mine Name
Company
Contact
Location
Description
Product
Resource
Reserve
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
MOLYHIL
Thor Mining PLC
Mick Billing – Chairman
Phone: (08) 7324 1935 Email: [email protected]
220 kms northeast of Alice Springs
Proposed open pit mining operation with on-site processing by gravity,
magnetic separation and flotation to produce W and Mo concentrate.
Definitive Feasibility Study completed in July 2012 with upgrade in Q4 2014.
Letter of Intent signed for tungsten offtake. Development subject to finance.
Tungsten and Molybdenum concentrates.
4.71Mt at 0.4% combined WO3 and Mo
3.0 Mt at 0.31% WO3 and 0.12% Mo
Initially 6 year
Environmental – Nov 2011 Mining – pending assessment of MMP
Construction – 2015/16 subject to finance Production – 2016/17
Construction – 100
Production – 70
$70M
CHANDLER SALT MINE PROJECT
Tellus Holdings
www.tellusholdings.com.au
Duncan van der Merwe – Group Managing Director
Phone: (02) 92417678 Email: [email protected]
Approx 120 kms south of Alice Springs
New mine. Underground multi-mineral salt mine utilising standard mining
technology, access via decline, room and pillar using a continuous miner.
Voids left from mining used for storage. Surface facilities include salt
processing plant (wet & dry), offices, camp and airstrip. DFS stage 1 (FEL2)
completed in June 2014. DFS (FEL3) due in 2015.
Industrial and edible salts, associated minerals (fertilizer) & storage/disposal
309 Mt Halite (NaCl) JORC Measured Resource = 525 year mine life
29 years + (Stage 1 is 500,000 tpa - majority for export)
Development proposals submitted in November 2012. EIS in preparation.
Environmental – 2016
Mining – Pending environmental
Construction – Q1 2017
Production – 2020 (storage Q3 2017)
Construction – 280-350
Production – 180
$464M
Northern Territory Department of Mines and Energy
Page 9 of 11
Mine Name
Company
Contact
Location
Description
Product
Resource
Mine Life
Approvals
Proposed Schedule
Jobs
Capex
MT TODD
Vista Gold Australia Pty Ltd
Brent Murdoch – Director & General Manager Australia
Phone: (08) 8941 9105 Email: [email protected]
250 kms south of Darwin and 55 kms north of Katherine
Reopen the Mt Todd Gold Mine. Conventional open pit mining extracting up
to 17.8 million tonnes per annum of ore for onsite processing through newly
constructed CIL Plant. Scope of Feasibility Study revised to include increased
throughput. Environmental Impact Statement submitted & under assessment.
Gold dore (370,000 ozs pa)
7.4 million ozs of measured and indicated mineral resources and 1.7 million
ozs of inferred mineral resources
19 years (including 2 years construction)
Environmental – Q3 2014
Mining – pending EPBC approval
Construction – 2016/2017
Production – 2018
Construction – 400-450
Production – 350-400
$1.05B
Northern Territory Department of Mines and Energy
Page 10 of 11
Northern Territory Department of Mines and Energy
Page 11 of 11