140/2014 - South Central Railway

SOUTH CENTRAL RAILWAY
Headquarters Office.
Personnel Branch/SC .
Date: /2,12 .2014
No. P(R)/554NII
ALL CONCERNED
PERSONNEL BRANCH SERIAL CIRCULAR NO.J¥/2014
Copy of Board 's letter No.E[G]2013 QR1-17 date 19.11 .2014
information , guidance and necessary action.
is forwarded for
~
\v\,~
(P.RADHAKR~ SHNA)
Secretary to CPO
for Chief Personnel Officer.
Board 's letter No. E[G]2013 QR 1-17 date 19 11 .2014 [RBE No.125/2014]
Sub: Incentives in case of posting to USBRL project and to the difficult
projects [National] in N.F.Rai/way on retention of quarter.
The question of allowing house retent,ion in case of postings to USBRL project in
Jammu and Kashmir and the postings to the difficult projects [National] in N.F. Railway [as
per annexure] have been considered by the ministry of Railways [Railway Board] following
the recommendations on the subject by the committee on incentives formed for the purpose .
The Board has agreed to allow the following incentives:
Incentives proposed for USBRL Project
For officers and staff, posted in J&K
[USBRL project] permission to retain
Railway accommodation at previous place
of posting as per Railway Board's
guidelines .
Incentives proposed for identified 'Difficult
Projects ' of N.F. Railway .
For officers and staff, posted on 'Difficult
Projects' of NF Railway to retain Railway
accommodation at previous place of
Railway
Board's
posting
as
per
guidelines.
I
2.
The above incentives will be limited to the project construction phase only and are
effective from 01 .04 .2012 till reviewed .
3.
This issues with the concurrence of the Finance Directorate of the Ministry of
Railways .
SdJ­
(S KP anda )JOOE [Gen
II
Annexure to letter No. E[G]2013 QR1-17 date 19.11.2014
List of Difficult Projects [National] in N. F Railway
1.
2.
3.
4.
5.
6.
Bhairabi -Sairang [Mizoram]
Jiribum - Tupul-Imphal, [Manipur]
Dimapur-Zubza [Nagaland]
Agartala -Sabroom [Tripura]
Bogibeel Rail-cum-Road Bridge [Assam]
Murkongselek-Pasighat [Arunachal Pradesh & Assam]
*****
INDEX No. 1062 QUARTERS
Board have issued instructions on allowing retention of railway
accommodation in case of postings to USBRL project in Jammu and
Kashmir and postings to the difficult projects [National] in N.F. Railway as
an incentive. The incentives will be limited to the project construction phase
only and are effective from 01 .04.2012 till reviewed.
S.C. No .
14-0 /2014