Florida Avenue Complete Streets Feasibility Study

Florida Avenue
Complete Streets Feasibility Study
What is a complete street?
A roadway where the entire right-of-way
is designed and operated to enable safe
access for all users. Pedestrian, bicyclists,
motorists, and transit riders of all ages
and abilities are able to safely move along
and across a complete street.
Why are
complete
streets
important?
Increase Safety for Pedestrians,
Cyclists, and Motorists
Support Vibrant Communities
Expand Ability to Move Around
Support Healthy Communities
COMPLETE
STREETS
ARE SAFE,
INVITING,
ENGAGING
PLACES
Brevard County is Implementing 6 Complete Streets Projects by 2017
The Space Coast Transportation Planning Organization has allocated a total of $18 million for
the feasibility studies, design and construction of complete streets projects to be spent by 2017.
Projects
Selected
How Were
Complete Street Projects
Selected?
THREE PHASE SCREENING PROCESS
Titusville
1
405
Project
Identification
Begin with Arterial and
Collector Roadways in
the County
407
3
Identify Suitable Areas Areas where existing or
future land use promotes
walking, biking and transit
528
2
Cape Canaveral
Cocoa
520
3
4
Identify Opportunity
Corridors - Roadways that
lack sidewalks, bike lanes,
and other amenities
Cocoa Beach
5
Rockledge
Long List of Candidate
Corridors Emerge - A list
of all roadways that could
make good complete streets.
Identify Projects Supported
by Local Governments and
Define Types of Investments
that Could Occur on Roadway
404
Palm Shores
Satellite Beach
Indian Harbour Beach
518
Locally Supported
Candidate Projects
Melbourne
192
2
3
6
Melbourne Vlg
W Melbourne
Feasibility
Analysis
Project
Selection
Evaluate list of locally supported canidate
projects to see if:
• Project will support walking and biking along
and across roadway
• Project is supported by local municipality
• Project can be constructed by 2017
Evaluate the quality of the canidate projects
to rank and recommend projects.
• Six projects selected
Indialantic
Melbourne Beach
1
Hopkins Avenue, Titusville
2
North Atlantic Avenue, Cape Canaveral
3
Peachtree Street, Cocoa
4
Florida Avenue, Cocoa
5
Minutemen Causeway, Cocoa Beach
6
Hickory Street, Melbourne
Florida Avenue
Complete Streets Project
Project Limits
Preliminary
Alternatives
Rosa Jones Drive to
SR 520/King Street: Proposed
Rosa Jones Drive to
SR 520/King Street
Study Corridor
CENTER ST
WILLARD ST
Striped Parking,
Curbed Bulb-Out with
Landscape/Signage at
Intersections
Curb &
Gutter
ROW - Property Line
ROW - Property Line
50’
Curb &
Gutter
FO
ES
RR
T
KING ST
E
AV
5’
4’
Sidewalk
Grass
2’
8’
On-Street
Parking
10’
10’
Drive Lane
Drive Lane
2’
4’
5’
Grass
Sidewalk
32’ (20’ @ Intersections)
Pavement
OLEANDER ST
50’
Right-of-Way
Preliminary Conceptual
Sketch
STONE ST
LEMON ST
City Hall
FLORIDA AVE
ORANGE ST
Post Office
FACTORY ST
Before
After
ST CHARLES ST
TRAVIS ST
ROSA L. JONES DR
Park / Open Space
Water
City Boundry
Study Corridor
Corridor Length: 0.39 Miles
N
0
Miles
0.05
Project Schedule
2014
JAN - APR
MAY - AUG
2015 2016 2017
SEP - DEC
Field Review
and Data Collection
Stakeholder
Interviews
Final Conceptual
Cross-Sections
Final Concept Plan
Design
Construction
How to get involved!
For more information on how to get involved
contact:
Space Coast Transportation Planning Organization
2725 Judge Fran Jamieson Way, Bldg B
Viera, FL 32940
Georganna Gillette
(321) 690-6890
[email protected]
Leigh Holt
(321) 690-6890
[email protected]
www.spacecoasttpo.com