Facilities Division
Projects (in order by review deadline date)
Bell Tower Pavement Rehabilitation
Project Number: 201411116
1/30/2015
Current Phase
Design Phase:
CD
Review Deadline Date
Comment Due Date:
Tuesday, February 10, 2015
Project Manager
Lynn Swank
Project Manager
Design & Construction Services
Administrative Services Building 3
2701 Sullivan Drive
Raleigh, NC 27695
919-513-4637
[email protected]
Design Phase:
Schematic
Development /
Design
Development
Documents
Comment Due Date:
Tuesday, February 17, 2015
(no later than 5:00 pm)
Steven R. Bostian
Capital Projects Management
Box 7520
919-515-8059
[email protected]
Items in Review Package:
 Drawings
Scope of Project: This project resolves a safety hazard by
replacing the damaged concrete surrounding the Memorial
Belltower with a permeable decorative stone system and
binder.
Review documents for the above project are available for
review in file slot #3 in the OUA/DCS Plan review area
located in the Administrative Services III Building, 2701
Sullivan Drive, Room 324.
Please email your comments to the Project Manager no
later than the due date for inclusion in NC State’s
response to the designer.
Winston Hall – HVAC Renovations
Project Number: 201420009
Code#: 41324
Item#: 353
Phase ID 532XX
Estimated Construction Cost – $820,826
Total Project Budget - $1,000,000
Items in Review Package:
 Drawings
 Project Narrative, Cost Estimate, and
Recommendations
Scope of Project: The existing Winston Hall heating
system consists of perimeter hot water finned tube heaters
(radiators). This project will remove the existing terminal
radiant heaters along the perimeter of the building and all
associated supports, controls, and accessories. The
existing hot water piping will be evaluated by the designer
and the University stakeholder and a decision will be
made to renovate the piping or replace them. This project
will then replace the radiators with hot water reheat coils
at new terminal units using a VAV system and DDC
controls. The designer will also evaluate the three air
handlers units in the building to determine their condition
and will make a recommendation whether to refurbish
them or to replace them.
Review documents for the above project have been
received and are available for review in file slot #2 in the
Administrative Services III Third Floor Plan Room.
Please forward written comments to the Project Manager
no later than the due date for inclusion in NC State’s
response to the designer. E-Mail responses are
acceptable. COMMENTS RECEIVED AFTER THIS DATE
WILL NOT RECEIVE A RESPONSE.