Facilities Division Projects (in order by review deadline date) Bell Tower Pavement Rehabilitation Project Number: 201411116 1/30/2015 Current Phase Design Phase: CD Review Deadline Date Comment Due Date: Tuesday, February 10, 2015 Project Manager Lynn Swank Project Manager Design & Construction Services Administrative Services Building 3 2701 Sullivan Drive Raleigh, NC 27695 919-513-4637 [email protected] Design Phase: Schematic Development / Design Development Documents Comment Due Date: Tuesday, February 17, 2015 (no later than 5:00 pm) Steven R. Bostian Capital Projects Management Box 7520 919-515-8059 [email protected] Items in Review Package: Drawings Scope of Project: This project resolves a safety hazard by replacing the damaged concrete surrounding the Memorial Belltower with a permeable decorative stone system and binder. Review documents for the above project are available for review in file slot #3 in the OUA/DCS Plan review area located in the Administrative Services III Building, 2701 Sullivan Drive, Room 324. Please email your comments to the Project Manager no later than the due date for inclusion in NC State’s response to the designer. Winston Hall – HVAC Renovations Project Number: 201420009 Code#: 41324 Item#: 353 Phase ID 532XX Estimated Construction Cost – $820,826 Total Project Budget - $1,000,000 Items in Review Package: Drawings Project Narrative, Cost Estimate, and Recommendations Scope of Project: The existing Winston Hall heating system consists of perimeter hot water finned tube heaters (radiators). This project will remove the existing terminal radiant heaters along the perimeter of the building and all associated supports, controls, and accessories. The existing hot water piping will be evaluated by the designer and the University stakeholder and a decision will be made to renovate the piping or replace them. This project will then replace the radiators with hot water reheat coils at new terminal units using a VAV system and DDC controls. The designer will also evaluate the three air handlers units in the building to determine their condition and will make a recommendation whether to refurbish them or to replace them. Review documents for the above project have been received and are available for review in file slot #2 in the Administrative Services III Third Floor Plan Room. Please forward written comments to the Project Manager no later than the due date for inclusion in NC State’s response to the designer. E-Mail responses are acceptable. COMMENTS RECEIVED AFTER THIS DATE WILL NOT RECEIVE A RESPONSE.
© Copyright 2024 ExpyDoc