Detailed Project Report for Bus Funding Ambikapur vii) Average Trip Length Private Vehicle Trips (in Km.) viii) Modal Share (in %) (Give Latest data) 2.4 For Mission Cities Per 2009 Walk Two-wheeler Car Auto Bus Cycle Other Modes III. Post 2009 Latest Year Data For NonMission Cities Latest Year Data 34 26 27 5 5 3 Public Transport Characteristics (Existing) 1 Public Transport Mode Present Yes/No KM ix) Mass Rapid Transit System (Metro/Mono/Light Rail) NO - Av. Daily Ridership - x) xi) xii) Bus Rapid Transit System City Bus System Number Intermediate Public Transport System (Numbers) NO NO NO - - 2 City or Cluster Bus System, if any with Buses as per UBS only (including Buses already in Operation) a Route details Route Route NO. Description (Terminal points, route locations) Existing Buses Route Existing No. of Length(in Headway(in buses km) min) New Buses Route Existing No. of Length(in Headway(in buses km) min) NOT APPLICABLE b. Types of existing Buses in the City (All Types) 5 Detailed Project Report for Bus Funding Types of Buses Ambikapur Floor Height AC Non AC Av. AC Fleet Size (in m) 2011-12 2012-13 of Fleet NOT APPLICABLE c. xxvii) (a) (b) © (d) xxviii) (a) (b) xxix) Physical Performance Parameters 2008-09 NOT APPLICABLE Daily Bus Performance NOT APPLICABLE Av. Km/Bus/Day Av. % Load Factor xxx) (a) (b) Total Staff Staff/Bus d. Financial Performance Fuel Performance NOT APPLICABLE Staff Positioning NOT APPLICABLE 2008-09 e. 201011 Physical Performance Total No. of Buses Held Av. N. of Buses On Road Fleet Utilization(%) Avg Age of Buses (in yrs) Av. Km./ltr of HSD(KMPL) xxxi) (a) (b) (c) (d) (e) xxxii) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) xxxiii) 2009-10 Traffic Revenue Other Revenue Total Revenue Earning Per Km Earning Per Bus Per Day 2009-10 201011 Revenue (in Rs Lakhs) 2011-12 2012-13 NOT APPLICABLE Operational Cost Personal (salary) Personal (over time) Fuel Cost Tires and Tubes Spare Parts And Others Interest Depreciation MV Tax Passenger Tax Other Tax Total Cost Cost Per Km Operating Ratio NOT APPLICABLE Existing Fare Structure 6 Detailed Project Report for Bus Funding Fare Stage (in Km.) Ambikapur Fare for AC Service(in Rs) Fare for Non AC Service(in Rs) Fare for Ordinary/Express Service(in Rs) NOT APPLICABLE f. fare Revision Mechanism if any Proposed *If different fare stage, please provide the same. 3 Existing Bus Depot/ Workshop, if any Location Area Capacit No. of (Acres) y (No. Routes) of Buses) xxxiv Gangapura, ) Ring Road Between Gandhi Chowk & Bilaspur Chowk xxxv ) 1 20 6 4 Proposed Terminals, if any Location Area in Acres 1 Pachpedi near Bilaspur Chowk 1 Pachpedi Near Bilaspur Chowk 2 Acre No Capacity(N o. of Buses) 3 Acre 5 Proposed Bus Depots Location Area (Acres) Contr ol Room No. of Route s 50 Capacit y (No. of Buses) No. of Routes) 50 Inspecti on Pit (Yes/No) Paintin g Facility (Yes/N o) Washing Facility(Yes/N o) Main & Admin Staff No No No No Control Room 7 yes Contr ol Room 6 No Main & Admin Staff No. of Platfor m yes 4 Inspecti on Pit (Yes/No) Paintin g Facility (Yes/N o) Washing Facility(Yes/N o) Main & Admin Staff Yes Yes Yes Yes 6 Proposed Bus Depot cum Bus Terminals 7 Detailed Project Report for Bus Funding Location Area (Acres) Capacit y (No. of Buses) 7 ITS Facilities Available xIii) ITS at Control Center a. Area b. Location 1 2 3 4 5 6 7 8 9 xIiii) xIiv) xIv) c. Facilities Computer - Core i7 Processors Screen (Big) Television Windows Power NetShell Server Software GIS system Software Including: Average Speed Monitoring System Journey Time Monitoring System Automatic Vehicle Location System Commuter Aided Dispatch System Small Gen. Set/Power Back-up Optical Fiber Cabling etc Total ITS at Terminal/Depots Depots 1. Computer - Core i7 Processors 2. Screen (Big) 3. Television 4.CCTV 5. Display for ticket collection 6. Station Ticketing Terminal Total Terminal Total ITS at Bus Shelters/Stops Total ITS Service for the people 1. Real Time Information dissemination through;(Yes/No) a. Websites b. Helpline Numbers Ambikapur No. of Routes) Control Room Existing ITS Facilities - Main & Admin Staff No. of Platfor m Proposed ITS Facilities At Proposed Bus Depot cum Terminal 5 1 1 1 50,000 50,000 35,000 250,000 250000 50000 35000 250000 1 500000 500000 200000 500000 50000 100000 1935000 3 2 2 15 2 1 150000 100000 70000 525000 80000 240000 1165000 1200000 20000 15000 8 Detailed Project Report for Bus Funding Ambikapur c. SMS systems d. Smart phone applications e. Any Other 2. Multi-Modal Tickets or Smart Card/RFID Coins Total 50000 50000 50000 185000 Proposed Operation Plan (City Or Cluster) 1 Assessment of Fleet xIviii Method 3-Based on 'New Proposed Routes' ) S.No Route Route Description . No. IV. Lengt h Headways Required Buses 1 1 Ambikapur To Lakhanpur 24 4 2 2 Railway Station To Bus Stand to Latori 20 2 3 3 Bus Stand To Jivanjyoti Hospital To Gandhi Chowk To Pratap pur Chowk 9.5 2 4 4 Bus Stand To Harikrishna Marg To Ring Road to Bario 34 2 5 5 Ambikapur To Mainpat 38 10 Ambikapur To Vishrampur 30 5 6 6 Total Buses Required 2 Strategy for route Rationalization of existing IPT/Para-Transit System 3 Category wise distribution of Buses Types Of Buses xIix) I) II) Midi non AC Bus III) Midi AC Bus Total Buses Required Strategy Share Autos and Tempos perform in feeder routes in the lanes connecting to the city bus along arterial, subarterial,and collector roads in accordance with the proposed routes. % of Total Buses 35 Time Line Proposed No of Buses 100 0 100 35 0 35 9 Detailed Project Report for Bus Funding Ambikapur 4 Contracting Mechanism for Operation & Maintenance Iiii) O&M of buses-In House /PPP(Provide Details) a.if PPP, Operation Mode Iiv) O&M of ITS Facilities- In- House / PPP (Provide Details) a.if PPP, Operation Mode Public Private Partnership Gross Cost or Net Cost Basis Public Private Partnership Gross Cost or Net Cost Basis 5 Cost Breakup 1 Capital Cost Of Buses Particular Particular 4 5 6 7 8 9 Total Cost Midi non AC Bus Number Sub Total Cost (4*5) Midi AC Bus Number Sub Total Cost (7*8) (6+9) Rs. in Lacs Rs. in Lacs Basic Cost Basic Cost 23.5 35 822.5 27.5 0 0 822.5 Taxes and Duties Taxes and Duties 6.5 35 227.5 7.5 0 0 227.5 Total Cost Total Cost 30 35 1050 35 0 0 1050 Total No. A 2 Support Infrastructure Cost Iviii) Cost of Depots, Terminals Item (a) Cost of Up-Gradation of Bus Depot Cost of Development Bus Depot (b) Cost of Up-Gradation Bus Terminal Cost of Development Bus Terminal (C) Cost of Up-Gradation of Depot cum Terminal (As per Annexure A) Cost of Development of Depot cum Terminal (As per Annexure A) (d) Cost of up-gradation Bus Q Shelters Cost of Development Bus Q Shelters Total Cost 35 No. 0 0 0 0 1 Cost (Lacs) 0 0 0 0 248 0 0.00 0 60 0.00 121.52 369.82 3 ITS Facilities Cost (e) (f) Item Central Control Room Installation Of Its Facilities at Infrastructure :Terminal or Depot :Proposed Terminal cum Depots :Bus Stops :Electronic Ticketing Machine Cost (in Rs.) 1935000 1165000 1200000 525000 10 Detailed Project Report for Bus Funding :Public Total cost of ITS facilities Total Cost in Lacs 4 Total Cost (Capital Cost + Support Infrastructure Cost + ITS Facilities Cost) Ambikapur 185000 5010000 50.1 1469.92 5 Funding Pattern i. % of the project cost covered under the Grant 11
© Copyright 2024 ExpyDoc