■ Topics on TES from Japan after the 72th EXCO Meeting (Aibling, Germany) Big problem : Japanese Energy Condition ・Destroyed Nuclear Power Plant (4 Reactors) by “Earthquake and Tumani” on March 11, 2011 We can not to operate NPP after Periodical Inspection because of Social Condition ・Every Nuclear Power Plants in JAPAN sttoped on May 5, 2012 (54 Reactors : total 48.88 million kW) Transitions in the Electric Power supply by 10 Japanese Utilities nuclear (29% ; 2009) ■Comparison Electric comsumption situation ( on Peak Load day) of several Building which has TES HVAC System between bifore the Disaster and last year (after the Disaster : We had to save the electric demand) Daiich Seimei Insurance Co. Ltd Kawagoe Office Building Kawagoe City in Saitama Prefecture 7,001㎡(8F) 戸塚センター(神奈川県横浜市) 350 13th, September, 2011 (Tue) ▲24% Reduction Electric demand (estimate) 300 without TES HVAC System 250 Electricity [kW] 200 Electric demand (measured) 13th, September, 2011 (Tue) 150 Cooling for TES ( night time operation) Cooling by Refrigirator Operation 100 50 Lighting & Outlet, etc. 0 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 [h] Cooling Load & Refrigirator Ope. [kW] Daiich Seimei Kawagoe 500 450 HVAC System (Building Side) Cooling Load 400 350 AHP 300 250 200 Cooling by TES(34%) Cooling for TES ( night time operation) HX 150 Daiich Seimei Insurance Co. Ltd Kawagoe Office 100 Cooling by Refrigirator Operation 50 0 22 0 2 Instrment 4 6 Number 10 12 14 16 18 20 ICE TES [h] Specification BHP Cooling (night time Ope.) Capcity (Day time Ope.) 143 kW 1 Cooling Capcity 315 kW Brine( S) Secondaly Water(S) 1 TES Volume / TES Capcity 20m3/ 4,923kWh Brine( R) Secondaly Water(R) Air-Cooled Brine HP BHP-1 1 Air-Cooled HP Chiller AHP-1 ICE TES 8 201 kW Totsuka Center( Community Center, Community Library, Recreational Facilities, etc.) Yokohama City 7,916㎡(4F、B1) 戸塚センター(神奈川県横浜市) Electric demand (estimate) 300 without TES HVAC System ▲17% Reduction Electric demand (measured) 17th, July, 2011 (Sun) Electricity [kW] 250 200 150 Cooling for TES ( night time operation) Cooling by Refrigirator Operation 100 50 Lighting & Outlet, etc. 0 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 [h] Cooling Load & Refrigirator Ope. [kW] Totsuka Center 400 17th, July, 2011 (Sun) HVAC System (Building Side) Cooling Load 350 300 HX 250 Cooling by TES (81%) Cooling by Refrigirator Operation 200 150 100 50 Cooling for TES ( night time operation) 0 22 Instrment AirCooled Brine HP ICE TES 0 2 4 6 8 10 2 14 16 18 20 [h] ICE TES Specification Number 2 12 Cooling Capcity BHP-1 (night time Ope.) 93.4 kW (Day time Ope.) 124.5 kW Heating Capacity 146 kW TES Volume / TES Capcity 14.62 m3/ 900 kWh BHP-2 Brine( S) Secondaly Water(S) Brine( R) Secondaly Water(R) Ion Mall Sakai Kita-Hanada Sakai City (Floor area 171,055㎡, Central HVAC area 73,111 ㎡, 5F) 14th, Aug, 2011 (Sat) ▲5% Reduction Electric demand (estimate) 9,000 without TES HVAC System 8,000 Electric demand (measured) 15th, July, 2011 (Fri) 7,000 Electricity [kW] 6,000 5,000 Cooling by Refrigirator Operation Cooling for TES 4,000 ( night time operation) 3,000 Lighting & Outlet, etc. 2,000 1,000 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 [h] Cooling Load & Refrigirator Ope. [kW] 8,000 7,000 Ion Mall Sakai 14th, Aug, 2011 (Sat) HVAC System (Building Side) Cooling by TES(40%) 6,000 5,000 Cooling Load Cooling for TES ( night time operation) 4,000 HX 3,000 2,000 Cooling by Refrigirator Operation 1,000 0 22 0 Instrment 2 4 2 INV. Turbo Refg, ITR-1 ICE TES 8 10 1 5 12 14 16 18 20 [h] Specification Number Brine Turbo Refg, BTR-1~2 6 ICE TES Cooling night time Ope. Capcity day time Ope. 2,004kW Cooling Capcity 12℃ Out 3,200kW 7℃ Out 2,620kW TES Volume / TES Capcity 2,919kW 140m3 /6,960kWh BTR-1 ITR-1 BTR-2 Brine( S) Secondaly Water(S) Brine( R) Secondaly Water(R) Housei Univ. (Tama Canpus) Machida City in Tokyo (127,162 ㎡) 3,000 Electric demand (estimate) without TES HVAC System ▲17% Reduction 2,500 Electric demand (measured) 15th, July, 2011 (Fri) Electricity [kW] 2,000 1,500 Cooling for TES ( night time operation) Cooling by Refrigirator Operation 1,000 500 Lighting & Outlet, etc. 0 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 [h] Cooling Load & Refrigirator Ope. [kW] Housei Univ. 1,200 15th, July, 2011 (Fri) HVAC System (Building Side) Cooling Load 1,000 800 HX-1 600 Cooling by TES (84%) 400 Cooling for TES 200 HX-2 Cooling by Refrigirator Operation ( night time operation) 0 22 0 Instrment AirCooled Brine HP 1~5 ICE TES 2 4 6 8 2 12 14 16 18 20 [h] Specification Number 5 10 Cooling Capcity ICE TES (night time Ope.) 203 kW (Day time Ope.) 260 kW BHP-1~5 Heating Capacity 236 kW TES Volume / TES Capcity 151.2 m3/ 9,670kWh Brine( S) Secondaly Water(S) Brine( R) Secondaly Water(R) Chuuou Univ. (Tama Canpus) Hachiouji City in Tokyo (160,000 ㎡) 9,000 15th, July, 2011 (Fri) 8,000 Electric demand (estimate) ▲20% Reduction 7,000 without TES HVAC System Electric demand (measured) 15th, July, 2011 (Fri) Electricity [kW] 6,000 5,000 4,000 Cooling for TES 3,000 Cooling by Refrigirator Operation ( night time operation) 2,000 1,000 Lighting & Outlet, etc. 0 22 24 2 4 6 8 10 12 14 16 18 20 [h] Cooling Load & Refrigirator Ope. [kW] 10,000 9,000 HVAC System (Building Side) Cooling Load Chuuou Univ. 15th, July, 2011 (Fri) 8,000 氷蓄熱槽1 水蓄熱槽1 7,000 6,000 Cooling by TES(30%) 5,000 4,000 Cooling for TES ( night time operation) 3,000 BHP1~2 2,000 Sub-StationⅠ Cooling by Refrigirator Operation 1,000 0 22 24 2 4 6 8 10 12 14 16 18 AHP1~2 20 [h] HVAC System (Building Side) 氷蓄熱槽 2 水蓄熱槽 2 AHP3~4 BHP3~4 Sub-StationⅡ TR-1 Meiji Pharmaceutical Univ. Kiyose City in Tokyo (45,988 ㎡) 2,500 15th, July, 2011 (Fri) Electric demand (estimate) 2,000 ▲14% Reduction without TES HVAC System Electricity [kW] Electric demand (measured) 15th, July, 2011 (Fri) 1,500 Cooling for TES ( night time operation) 1,000 Cooling by Refrigirator Operation 500 Lighting & Outlet, etc. 0 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 [h] Cooling Load & Refrigirator Ope. [kW] 1,800 Meiji Pharmaceutical Univ. Cooling Load HVAC System (Building Side : 24h cooling Zone) ④放熱 (Building Side : 8h cooling Zone) 1,600 ②夜間蓄熱 15th, July, 2011 (Fri) 1,400 Cooling by TES(33%) 1,200 1,000 800 Cooling for TES ③24時間冷房+昼間追掛 HX ( night time operation) BHP-1 AR-1 600 400 Cooling by Refrigirator Operation 200 0 22 0 2 4 6 8 10 12 14 16 18 HX B-1~3 20 AHP-1 [h] HX ICE TES Brine( S) Secondaly Water(S) Brine( R) Secondaly Water(R) 10 Electric Power companies in Japan This Summer ▲10% more electrik demand reduction is asked ▲5% more electrik demand reduction is asked Tohoku-EPCO Kansai-EPCO Kyushuu-EPCO Tokyo-EPCO 1号館(W棟) 1号館(免震) 4号館(S棟) 3号館(E棟) 2号館(N棟) 空冷ブラインHP 90kW×6=540kW 製氷機 1000kg/h IPF約5% 冷 水 縦 型 蓄 熱 冷 槽 水 + 縦 氷 型 ス 蓄 ラ 熱 リ 槽 ー 218m3 7-15℃:2028kWh 2-15℃:3295kWh 冷 温 水 縦 冷 型 温 水 蓄 縦 型 熱 蓄 熱 槽 槽 218m3 7-15℃:2028kWh 2-15℃:3295kWh 36-31℃:1267kWh 2号館(制震) 4号館(制震) 空冷HP 90kW×4=360kWh 空冷HP 90kW×3=270kW CT 冷 冷 水 水 縦 縦 型 型 蓄 蓄 熱 熱 槽 槽 CT 冷 冷 温 温 水 水 縦 縦 型 型 蓄 熱 蓄 槽 熱 槽 127m3 7-15℃:1181kWh 2-15℃:1920kWh 127m3 7-15℃:1181kWh 2-15℃:1920kWh 36-31℃:738kWh ホ ー ル 3号館 地中熱 HP 温 温水槽 水 槽 地中熱HP 冷房:20kW 暖房:16kW 氷氷氷 蓄熱槽 蓄熱槽 蓄熱槽 温度成層型温水蓄熱槽, 192m3,H=4m,1116kWh(35→30℃) インバーターターボ 内融式氷蓄熱槽 447m3,H=4,注水量427m3, 潜熱12306kWh,氷量133,056kg IPF33.9% 瞬時取出熱量3000kW ブラインターボ CTへ 熱源系統概念図 1090kW(15-7℃) 912kW(15-2℃) 1287kW(32-37℃):熱回収 CTへ 2110kW(13.9-9) 1881kW(8.4-4) 1283kW(-2--5) ボイド梁部に懸垂 連結縦型蓄熱槽 搬入時 バタ弁 130 短管 200 フレキ 900 ネック 250 ネック 250 1,480 (容積率に入らず) 400A 2,500 100 フランジ・フレキ 400A 連結縦型蓄熱槽 ( h=約10m φ2650) 5連結で218.1m3 ×2基 3連結で127.2m3 ×2基 400A 吹抜部へ下降させ設置 東京千住キャンパス工事現況(H23.2.23.) 4号館(S棟) 連結縦型蓄熱槽 設置状況 バタ弁 130 短管 200 フレキ 900 短管 200 バタ弁 130 ネック 250 2,060 400A 連結縦型蓄熱槽 ( h=約10m φ2650) 3連結で127.2m3 ×2基 東京千住キャンパス工事現況(H23.2.23.) 4号館(S棟) 連結縦型蓄熱槽 1層目(2缶) 設置状況 ロッジア 交流プラザ(オープンエアー・床冷暖) 1階免震床と地階の境界 地面がぬかるんでいるのは、 雨ではなく地下水位が高いため 東京千住キャンパス工事現況(H23.2.14.) 1号館(W棟) ロッジア北側の地中熱利用の熱交換用チューブ埋設 施工状況 ●地中熱利用床冷暖房(二次側配管敷設) 地中熱ヒートポンプ 冷房:20kW 暖房:16 kW 内径:13A、 8系統 総延長:1484m 敷設面積:225㎡ 架橋ポリエチレン管 を敷設中 地中熱交換器 埋設範囲 約250m2 オープンエアー 床冷暖房 設置範囲 カフェ 大階段 東京千住キャンパス工事状況(H23.8.25.) 1号館 ロッジア GRC天井工事 施工状況
© Copyright 2024 ExpyDoc