activiteitenverslag VUB Chair in PPP 2010-2014

VUB Chair in
Public-Private Partnership (PPP)
Activity report 2010 - 2014
Infrabel
©
Table of content
1| A word on the VUB Chair in PPP
5
2| Short history of the VUB Chair in PPP
7
3| The VUB Chair in PPP research team
8
4| Organisation of the VUB Chair in PPP
9
5| Research output of the VUB Chair in PPP
10
•
Selection of scientific publications by
the Chair researchers (2010-2014)
• Selection
• PhD
of conference proceedings (2010-2014)
defense of Chair researchers
6| Interaction among PPP stakeholders and
participation in events
• Advisory
Board Meetings
• Awareness
• Guest
building among practitioners
lectures for students
10
12
13
14
14
16
17
7| Media Presence
18
Contact information
19
“At the start of the VUB Chair in PPP,
we aim at becoming an academic point
of reference in Belgium, stimulating
multidisciplinary research in the field of
PPP and disseminating research output
over a wide network.”
E. Haezendonck, 2010
4
1| A word on the VUB Chair in PPP
Worldwide, Public-Private Partnership (PPP) has become
an increasingly attractive procurement method for
the delivery of public services. Much of this is because
many governments consider PPPs as a win-win option
for meeting their investment needs. Nonetheless, there
is growing evidence that the practical implementation
imposes some challenges. Multidisciplinary research is
needed to capture these issues and to propose relevant
frameworks that both assist in assessing the potential of
PPP projects, as well as contribute to more effective PPP
management.
In the last five years, the VUB Chair in PPP aimed to
achieve just that and hopes to continue to do so. At the
start of the VUB Chair in PPP, we envisaged becoming
an academic point of reference in Belgium in relation to
academic research stimulating multidisciplinary research
in the field of PPP and the dissemination of the research
output over a wide network. Close collaboration with
existing networks and the interaction between business
and academics were the key success factors in carrying
out this vision.
We are very grateful to Deloitte, Grontmij and Laga for
the sponsorship of the VUB Chair in PPP. We can look
back on a period of positive and intensive collaboration,
in which we were able to make a significant step in
becoming a point of reference in research on PPPs in
Belgium.
Prof. dr. Elvira Haezendonck
Chair holder of the VUB Chair in PPP (2010-2014)
5
“The VUB Chair in PPP offers a platform for
knowledge exchange and relationship building, bringing more stakeholders together for
relevant and profound PPP discussions.”
E. Haezendonck, 2012
6
2| Short history of the VUB Chair in PPP
Both researchers and practitioners identified a pressing need for multidisciplinary research and the creation of
an excellence pool of research in the field of Public-Private Partnership (PPP). Regardless the existence of some
well-known institutions such as the ‘Vlaams Kennis Centrum PPS’, we believed that there was still a need for more
comprehensive academic research. Existing research tends to investigate PPP arrangements too much from a single
perspective (i.e., legal, economic or technical). Out of this concern the VUB Chair in PPP was born with the clear
objective of conducting and encouraging multidisciplinary research in the field of PPP.
The VUB Chair in PPP at the Vrije Universiteit Brussel (VUB) started in 2010, and is sponsored by Deloitte, Grontmij and
Laga. The VUB Chair in PPP is led by Prof. dr. Haezendonck and is affiliated with three VUB faculties: The Faculty of
Economic and Social Sciences and Solvay Business School, the Faculty of Law and Criminology (RC) and the Faculty
of Engineering (IR).
Besides conducting multidisciplinary research the VUB Chair in PPP initiates, organises and participates in conferences,
lectures, workshops and other activities for and with students, academics, practitioners and the general public. The
Chair’s focus is locally, nationally and internationally oriented. Activities are organized in cooperation with the sponsors
(i.e., Deloitte, Grontmij and Laga), and occasionally in cooperation with ADEB-VBA, the ‘Vlaams Kennis Centrum PPS’
and other organisations.
Elvira Haezendonck was proposed as Chair holder by the VUB, for the period 2010-2014.
Prof. dr. Elvira Haezendonck
Prof. dr. Elvira Haezendonck (PhD in Applied Economics, University of Brussels VUB) is
senior research fellow and Associate Professor at the University of Brussels (VUB) and the
University of Antwerp (UA), with a specialization in (project) management and strategy.
She has been involved in over 50 research projects including multiple strategy analyses for
seaports, large-scale project assessments, socio-economic feasibility studies and transport
and infrastructure policy. Her teaching and academic research concentrate on (project)
management, competitive strategy, (port) strategy and corporate responsibility. She has
published various articles and books in these domains.
7
3| The VUB Chair in PPP research team
In order to achieve the objective two researchers and two co-promoters have further strengthened the VUB
Chair in PPP.
2 researchers sponsored by the VUB Chair in PPP
dr. Steven De Schepper studied Applied Economics: Business Engineering at the University
of Brussels (VUB). After his graduation in 2009, he became a research associate at the
department of Business. In 2010, he strengthened the VUB chair in PPP, where he conducted
a four-year study on the management of PPPs and where he obtained his PhD. in 2014. He
is also involved in a number of research projects concerning complex (mega)projects. His
interest includes various topics in the fields of strategic management of complex projects.
dr. Steven De Schepper
Geoffrey Aerts obtained his Bachelor degree in Political Science at the University of
Antwerp in 2008. In the following years he earned a Masters degree in Comparative and
European Politics, a Masters degree in Diplomacy and International Relations and a Masters
degree in Maritime and Transport Management at the Institute of Transport and Maritime
Management Antwerp. Currently Geoffrey Aerts is affiliated with the VUB Chair in PPP at
the faculty ES and Solvay Business School of the Vrije Universiteit Brussel, where he works
as a research associate.
The defense of his PhD is planned early 2016.
Geoffrey Aerts
2 co-promoters supported the VUB Chair in PPP in view of multidisciplinarity
Since 1985 Prof. dr. Kaat Leus (Doctor of Law, 1991, VUB) is associated at the Department
of State - Administrative Law at the Faculty of Law and Criminology. She teaches public
law, public company law, government contracts and administrative liability. She is also a
lawyer at the bar in Antwerp and Brussels, specialized in public economic law. Besides she
is director of several public companies and because of this, she is involved in various PPPprojects. She published numerous articles in the domain of public economic law, where she
recently, as co-author in collaboration with the “Instituut voor Bedrijfsjuristen” published
“DBFM: Meid voor alle PPS-werk?”.
Prof. dr. Kaat Leus
VUB Faculty of Law and Criminology
Prof. dr. Danny Van Hemelrijck
Prof. dr. Danny Van Hemelrijck (doctor in de ingenieurswetenschappen, 1992, VUB) is
a civil engineer (VUB) and additionally engineer in informatics. “Contribution to the
development of thermo elasticity for the experimental mechanics of composite materials”
was the title of his doctoral thesis. He is responsible for the courses: “Mechanica van
materialen, vloeistoffen en constructies, Mechanica van het continuüm, Experimentele
spanningsanalyse en NDT, en Ontwerpmethodiek en uitvoering” at the Vrije Universiteit
Brussel. He is (co)auteur of approximately 40 A1-publications and has more than 100
publications in congress proceedings. He is also involved in the postgraduate training
management of major construction projects.
VUB Faculty of Engineering
8
4| Organisation of the VUB Chair in PPP
Advisory Board
A committee of PPP experts (representing all stakeholder groups)
Partners
Academic team
Guido Vandervorst - Deloitte
Elvira Haezendonck - VUB
Peter Vanhoegaerden - Grontmij
Geoffrey Aerts - VUB
Werner Van Lembergen - Laga
Steven De Schepper - VUB
PPP Workgroup
Academic team
Erik Paquay - Deloitte
Kaat Leus - VUB
Rob Van Den Plas - Deloitte Tax
Danny Van Hemelrijk - VUB
Chair
Steering
Group
Kathleen De hornois - Laga
Ronald Probst - Grontmij
Academic Steering Team
As both multidisciplinary research and communication and interaction between industry and academia are the Chair’s
main objectives, the researchers of the VUB Chair in PPP were supported by several advisory and steering groups (as
depicted in the organizational chart above).
The Chair Steering Group met every three months and supported the researchers in:
1. Shaping and developing the research;
2. Organising and quality reviewing the research;
3. Developing the doctoral theses.
The Academic Steering Team met on a regular basis to support the researchers in:
1. Shaping and developing the research;
2. Organising and quality reviewing the research;
3. Developing the doctoral theses.
The PPP Workgroup met on a regular basis to support the researchers in:
1. Providing PPP expertise and experience;
2. Validating the relevance of the research in the PPP field and related projects;
3. Validating the management and practical relevance of the research topic.
The Advisory Board met six-monthly and validated the direction and content of the VUB Chair in PPP as centre of
knowledge.
9
5| Research output of the VUB Chair in PPP
The Chair’s aim was achieved through publications and doctoral research. Since the start of the VUB Chair in PPP this
included presentations at international conferences as well as publishing in a variety of international journals.
The emphasis of the Chair’s research is on the potential of PPP projects and, among others, the following topics were
analysed:
• Critical Success Factors of PPPs;
• Stakeholder management of PPPs;
• Transaction costs in PPPs;
• A qualitative success framework for PPPs;
• Capacity building for PPPs;
• Knowledge transfers from and to project teams.
• Selection of scientific publications by the Chair researchers (2010-2014)
De Schepper, S., Dooms, M., Haezendonck, E., (2014). Stakeholder dynamics and responsibilities in Public–
Private Partnerships: A mixed experience. International Journal of Project Management, 32, 1210-1222.
Although stakeholder management is seen as one of the main success factors of Public–Private Partnerships
(PPPs), to date, limited research has investigated actual stakeholder management in PPPs. After positioning
PPP in the current stakeholder management theory, a comparative case study analysis of four PPP infrastructure
projects demonstrates the relevance and importance of stakeholder inclusion in PPPs. The case study findings
indicate that a PPP makes the stakeholder environment more complex to manage, due to the increasing
importance of the stakeholder context and dynamics. Hence, allocating stakeholder responsibilities between
the public initiator and private consortium becomes problematic as it goes hand in hand with balancing
between reactive and proactive responses to stakeholder claims. In order to cope with the PPP specific
stakeholder characteristics, the use of a dynamic dual stakeholder management tool is recommended as well
as the identification of governance structures that allow the sharing and division of responsibilities between
stakeholders.
De Schepper, S., Haezendonck, E., Dooms, M., (In press). Understanding pre-contractual transaction costs for
Public-Private Partnership infrastructure projects. International Journal of Project Management.
While public entities are still increasingly interested in Public-Private Partnerships (PPPs), we recently observe
increasing reluctance from private partners to engage in PPP-bidding. Up-front costs that PPP bidders make
are considered too high compared to the bidding chances, and may result in fewer bidders in the future. In
this paper, we empirically analyse transaction costs of PPPs in the pre- contractual stage and compare these to
similar costs borne by private partners for traditional public procurement. Statistical analyses based on sample
of 172 public infrastructure projects enable the estimation of the pre-contractual cost burden. Based on the
study results, suggestions are made to lower these costs or to improve the cost position of the private sector, in
order to safeguard the competitive setting of the PPP market.
10
Aerts, G., Dooms, M., Haezendonck, E., (in press). Stakeholder management practices found in landlord seaport
authorities in Flanders: an inside-out perspective. International Journal of Shipping and Transport Logistics.
This paper offers an analysis of actual stakeholder management conducted by port authorities. Drawing
from several organisation-centric stakeholder management theories, we study the conceptualisation and
the identification of stakeholders, as well as the application of stakeholder management as executed by
port authorities. By analysing the opinions of middle management, we examine whether daily stakeholder
management reflects stakeholder theory findings, emphasising the importance of attribute-based stakeholder
conceptualisation, identification and stakeholder management strategies. We also conduct a comparative
analysis, assessing the quality of the stakeholder management practice in several seaports located in the
Rhine-Scheldt Delta. The results show that actual stakeholder management practices, found at several port
authorities, convey little resemblance to the methods and theoretical findings presented in academic stakeholder
management literature.
Aerts, G., Grage, T., Haezendonck, E., Dooms, M., (in press). Public-private partnerships for the provision of port
infrastructure: an explorative multi-actor perspective on critical success factors.
Worldwide, infrastructure projects increasingly use forms of public-private cooperation in the project finance
and provision of large-scale infrastructure projects. We use a multi-actor analysis in order to explore, which
critical success factors (CSFs) are important in public-private partnerships (PPPs) in the port context, and to
what extent different stakeholders have diverging opinions on the importance of these CSFs. The results of
our questionnaire, indicate that eight CSFs are of superior importance in port PPPs: the concreteness and
preciseness of the concession agreement, the ability to appropriately allocate and share risk, the technical
feasibility of the project, the commitment made by partners, the attractiveness of the financial package, a
clear definition of responsibilities, the presence of a strong private consortium and a realistic cost/benefit
assessment. The reason for their importance is their deal-breaking character, which can lead to a total failure
of PPP projects during the early stages of project conception.
A number of other research papers are currently under review.
11
• Selection of conference proceedings (2010-2014)
De Schepper, S., and Haezendonck, E. (2014). Transaction
cost economics of public infrastructure delivery in the
procurement phase: a comparative assessment. Paper
presented at the EURAM 2014 conference. Valencia.
Aerts, G., Haezendonck, E., Dooms, M. (2014). Public-private
partnerships for the provision of port infrastructure:
stakeholder analysis of critical success factors in German,
Dutch and Belgian seaports. Paper presented at the EURAM
2014 conference. Valencia.
De Schepper, S., Dooms, M., and Haezendonck, E. (2013).
Stakeholder dynamics and responsibilities in Public-Private
Partnerships: a mixed experience. Paper presented at the PPP
conference (Global challenges in PPP). Antwerp.
Aerts, G., Haezendonck, E., Dooms, M. (2013). Organisational
learning in hybrid settings: a value creation framework for
project based learning in the PPP market. Paper presented at
the PPP conference (Global challenges in PPP). Antwerp.
De Schepper, S., Dooms, M., and Haezendonck, E. (2013).
Strategic management of Public-Private Partnerships: a
stakeholder approach. Paper presented at the EURAM 2013
conference. Istanbul.
Aerts, G., Dooms, M., Haezendonck, E. (2013). Managerial
perspectives on the state of stakeholder management in
seaport authorities. Paper presented at the IAME 2013
conference. Marseille.
De Schepper, S., and Haezendonck, E. (2012). A Critical Review
of Success Factors of Public-Private Partnerships. Paper
presented at the EDEN seminar: Perspectives on Projects: The
Projectification of Society. Lille.
De Schepper, S., van Balen, M., Haezendonck, E., and Dooms,
M. (2012) Public-Private Partnership: a Driver for Value.
Paper presented at the 3rd International Symposium of
Partnerships for the Social Good. Rotterdam.
12
• PhD defense of Chair researchers
Steven De Schepper successfully defended his PhD, titled “Essays on the Success Factors of Public-Private Partnerships
in Infrastructure”, on the 28th of August 2014 under the supervision of Prof. dr. Elvira Haezendonck. About ninety
invitees, among which different leading figures of different Belgian PPP projects e.g., Diabolo, BRABO1 and the
“Oosterweelverbinding”, attended the PhD defense.
Abstract of the dissertation:
Worldwide, a Public-Private Partnership (PPP) has become an
increasingly attractive procurement method for the delivery of public
infrastructure services. Much of this is because many governments
consider PPPs as a win-win option for meeting their investing/
infrastructure needs. Nonetheless, there is growing evidence that
the practical implementation is not without (managerial) problems.
In this regard, this dissertation seeks to propose three relevant
frameworks that both assist in assessing the success potential of
PPPs, as well as contribute to a more effective PPP management.
First, the use of a dynamic, dual stakeholder management framework
and the ex-ante inclusion of stakeholders is suggested to put an
appropriate stakeholder management process in place to capture and
address stakeholder concerns more effectively. The need for such a
stakeholder framework is motivated by the finding that stakeholder
issues do not solely emerge because of a gap between stakeholder
expectations but are often the result of an imbalance of reactive and
proactive stakeholder management approaches and an absence of any
guidance on the responsibility and accountability issues surrounding
the stakeholder management of PPP projects. Second, a toolbox is
offered to aid contracting governments in estimating and controlling
ex-ante the transaction specific investments that bidders make in
the procurement of PPP projects. The necessity of such a tool is driven
by the observation that transaction costs in the procurement phase
hinder the viability of some projects in the short run, and if these
transaction costs remain high, the magnitude of these costs have the
potential to harm the public infrastructure market in the long run.
Third, a first step is made toward a conceptual ex-ante evaluation
framework that incorporates different stakeholder perspectives, as
well as the cause-and-effect relationship between success factors
and stakeholder objectives/criteria. If further operationalized,
the framework has the advantage of providing governments a set
of alternative delivery models through a tool that could aid the
(contracting) governments in optimising the chosen PPP alternative
and future PPP initiation and procurement processes.
Geoffrey Aerts will defend his PhD early 2016.
13
6| Interaction among PPP stakeholders
and participation in events
• Advisory Board Meetings
One of the main events of the VUB Chair in PPP was the six-monthly organization of Advisory Board Meetings. Eight
Advisory Board Meetings have taken place as from the start of the VUB Chair in PPP in 2010. The purpose of the
Advisory Board Meetings was to tackle hot topics surrounding PPPs with a large community of stakeholder experts.
Overview of the Advisory Board Meetings
Title
Date
Speakers
1st Advisory Board Meeting:
Roundtable on the success factors of PPP projects
16/12/10
Roundtable with the Advisory Board Members
2nd Advisory Board Meeting:
Workshops on the Critical Success Factors of
PPPs
20/06/11
2 workshops based on working papers of
Steven De Schepper.
3th Advisory Board Meeting:
Connecting Europe Facility and its innovative financial
instruments
26/01/12
M. Bertrand (DG Move)
S. Forrester (TEN-T)
4th Advisory Board Meeting:
PPP and railway infrastructure: lessons learned and
challenges ahead
21/06/12
L. Lallemand (Infrabel)
24/01/13
H. Van Der Borght (Vlaanderen)
Y. Verbakel (Vlaanderen)
K. Leus (VUB)
W. Decrem (PMV)
13/06/13
E. Meysmans (KBC)
W. Vermeir (AG Insurance)
D. Van Hassel (Royal BAM)
L. Verstraeten (KBC)
H. Vanderborght (Vlaanderen)
W. Van Lembergen (Laga)
06/02/14
B. Van Zeebroek (S&R)
V. Van Daele (Lijninvest)
B. Verhulst (Heymans)
H. Baeten (Grontmij)
J. Lindenbergh (Deloitte)
16/10/14
J. Bosschem (ORI)
H. Van der Borght (Vlaanderen)
J. Ceyssens (Willemen Group)
F. Boelaert (Vlaanderen)
S. Ouaki (DG Move)
R. Houthaeve (Grontmij)
5th Advisory Board Meeting:
The need for capacity building at the public sector
6th Advisory Board Meeting:
Project finance & bankability of PPP projects
7th Advisory Board Meeting:
value creation of PPPs:
how can PPP project create value for all stakeholders?
8th Advisory Board Meeting:
The Future of PPP in the context of budgetary
constraints
14
List of Advisory Board Members:
1. Client | 1.1. Government
Yvan Verbakel
Toon Colpaert
Cedric Bossut
Hedwig Van Der Borght
Guy Haesevoets
Hendrik Deboutte
Vlaamse Overheid
Vlaamse Overheid
Federale Overheidsdienst Mobiliteit en Vervoer - Beliris
Vlaamse Overheid
6. Architects
Jacques Timmerman
P. Swinnen
Philémon Wachtelaer
1. Client | 1.2. (semi-) public agencies
Roger Kesteloot
De Lijn
Bernard Blaszczak
MIVB - STIB
Jan Van Rensbergen
BAM
Marc Smeets
Infrabel
Karl Cools
AG Stedelijk onderwijs Antwerpen
Frank Nooten
AG Stedelijk onderwijs Antwerpen
Mieke Francken
AG Vespa
Marc Noppen
VUB
Noriant
Locorail
Locobouw
CFE
ADEB-VBA
Heymans
Besix
Jan de Nul
Jan de Nul
Strabag
CFE
Alstom
Kumpen/Aswebo
5. Bank & Insurance
Lode Verstraeten
Katrijn Quaghebeur
Peter Vermeiren
Koen Wuyts
Erik Vleminckx
Isabel Fritz
Benoit Theys
Marc Van Begin
Olivier Vanden Eynde
Coen Ysebaert
Erik Paquay
Marc Derycke
Rob Van Den Plas
Guido Van Der Vorst
Deloitte
Deloitte
Deloitte
Deloitte
Deloitte
Deloitte
Peter Vanhoegaerden
Jo Belen
Ronald Probst
Bernard Gilliot Grontmij
Grontmij
Grontmij
ORI
8. Research centre
4. Investors
Marcel Van Handenhoven
Freddy Hoorens
Manu Vandenbulcke
Laga
Laga
Laga
Laga
7. Advisors | 7.3. Technical
3. Contractors
Jean-Charles Vereerstraeten
Didier Cartage
Bart Verhulst
Rudi Cnudde
Paul Lievens
Jo Roelants
Marc Selen
Diane Zygas
Robert Seghers
Johan Ceyssens
Werner Van Lembergen
Kathleen De hornois
Stefaan Van Dyck
Danny Stas
7. Advisors | 7.2. Financial/Technical
2. SPV
G30
Vlaamse Bouwmeester
BURO II & ARCHI+I
7. Advisors | 7.1. Legal
Luc Neyrinck
Bart Keymeulen
Alex Vandemeulebroecke
BNP
BNP
PMV
Quares
DG Infa
Kaat Leus
Danny Van Hemelrijck
Patrick Uytendaele
Koen Verhoest
Steven Van Garsse
Yseult Marique
Erik De Keuleneer
Yves Rammer
Paul De Knop
VUB
VUB
VUB
UA
Kenniscentrum PPS
Essex
ULB
ULB
VUB
9. International experts
Willem Vermeend
Alex Vermeulen
PPS Netwerk Nederland
Rijksgebouwendienst
10. VUB team
KBC
KBC
Belfius
Belfius
Belfius
ING
AG Real Estate
AG Real Estate
Elvira Haezendonck
Geoffrey Aerts
Steven De Schepper
15
VUB
VUB
VUB
• Awareness building among practitioners
The VUB Chair in PPP initiates, organizes and participates in multiple forums for discussing and communicating
research results and relevant issues on PPP, such as lectures, expert meetings, seminars and conferences aimed at
different types of audiences. Recently organized seminars and discussions are “Pre-contractual costs of PPP”, “Legal
issues of design and build”, “Project management skills for PPP”.
Examples of forums in which the VUB Chair in PPP
actively participates in are the EU Open Days, the National PPP Day and Realty (Real estate networking platform).
A selection of events co-organized by the VUB Chair in PPP for practitioners
Title
Date
Target audience
Evening lecture: ‘Public-Private Partnerships:
Challenges for better project management’
07/06/11
About 100 PPP experts.
(Large representation of contractors and advisers).
Evening lecture: ‘Design & Build:
a legal challenge in the Belgian construction sector’
12/06/12
About 120 PPP experts.
(Large representation of legal and financial advisors).
Conference: ‘Precontractuele kosten:
een obstakel voor de toekomst van PPS?’
06/12/12
About 150 PPP experts.
(All stakeholder groups were present)
Part of a conference: ‘Panel discussion of Grontmij’
on the National PPP day
04/06/13
About 50 PPP experts.
(All stakeholder groups were present)
16
• Guest lectures for students
Besides organizing seminars for practitioners, the educational component of the VUB Chair in PPP also entails visibility
to a large number of bachelor and master students. In different faculties, and covering various topics directly or
indirectly related to the Chair’s theme, the partners of the VUB Chair in PPP offer interesting guest lectures. These
lectures are embedded in VUB courses and programs and taught by experts of the Chair’s partners. As such, they share
knowledge and real life cases with many students, and they have the opportunity to give visibility to their expertise
and organization. The VUB Chair in PPP offers this structured and continuous student-partners platform.
Selection of guest lectures organized by the VUB Chair in PPP for students
Faculty
Course
Subject offered by lecturer from partner
Student reach
Economics
Management en strategie/
Management and strategy
CSR - social entrepreneurship
350
Engineering
Life cycle costing
Managementaspecten bij bouwprojecten
80
Law
Publiek ondernemingsrecht
ESR 95 neutraliteit en PPS
25
Economics
Organisatieontwerp en
-verandering
As One
150
Economics
Risk management
Inleiding tot Solvency II
20
Engineering
Ontwerp van constructies
Sustainability and innovation through PPP
16
Law
Venootschapsrecht
Rol van de revisor en commisaris
90
Economics
Masterclasses Entrepreneurship
CSR - Social entrepreneurship
80
Economics
Marketing
Social media
180
Law
Bestuursrecht
Benchmark PPS in Vlaanderen
25
Engineering
Bouwkunde
Sustainability and innovation in PPP
16
Law
Notarieel vennootschapsrecht
Vermogensplanning
30
Engineering
Life cycle costing
Managementaspecten bij bouwprojecten
80
17
7| Media Presence
In the course of the past four years, the VUB Chair in PPP appeared on numerous occasions in newspapers and
magazines (e.g. Trends, De Tijd, Knack and FD Magazine) raising the visibility of the VUB Chair in PPP, also benefiting
the expansion of both the academic as well as the professional network of the VUB Chair in PPP.
Selection of media presence:
• Partners leren elkaars spel en spelen beter samen, 2010, Mediaplanet;
•Nood aan een Multidisciplinair kader, 2011, Mediaplanet;
•Recreatie houdt zwembaden uit het rood, 2012, Trends;
•PPS projecten: interessant maar toch opletten, 2012, FD Magazine;
•PPS wint nog aan belang, maar enkel met de juiste motivaties, 2012, PMV Ambitiekrant;
•PPS onder druk door hoge studiekosten, 2012, Mediaplanet;
•Wist u dat PPS-projecten gepaard gaan met te hoge kosten, te lage slaagkansen en te veel tijdsverspilling?,
2013, Akademos;
•Projectfinanciering voor PPS 2.0, 2013, FD Magazine;
•Meerwaarde voor alle stakeholders moet de missie zijn bij PPS, 2013, Mediaplanet;
•Stem van Elvira Haezendonck, 2014, 100 stemmen PPS.
pps
T
AMBITIEKRAN
2012
woensdag
16
17
T
AMBITIEKRAN
6 juni 2012
woensdag
6 juni
pps
og
pps wint n
ng ,
AAn beLAkeL met
mAAr en motivAties
de juistede toekomst
(PPS)
Knop over
Rector Paul De ate samenwerkingsverbanden
van publiek priv
immers
eutraliteit vereist
behoor t. ESR-n
en beschikprivate
van het bouwbeeen transfer
ngen zien publiek kelijk
vraagrisico. Deze
Publieke instelli
aantrek
baarheids- en/of vaak onmogelijk om
(PPS) als een
het
samenwerking
g of verbeteperking maakt
voor de leverin
le risicoverdeoptima
dienen
een
mechanisme
van
te spreken
re infrastr uctuur
van andere
ring van openba krimpende budgetten.
vrijheidsgraden
beperkt.
ling, wat de
hun
België zo,
het PPS-project
sten, gezien
stakeholders in
t van het
onder meer voor
amste
aandachtspun
Dat is althans
voorna
end
de
g
bijkom
etterin
Een
dat nakende
waar de debudg
starten. De
gsprincipe is
PPS’en op te
debudgetterin
eutraliteitsen jaren
insteek was om
aan de ESR-n en Eurovan de afgelop
wijzigingen
financiële crisis
De prikkel
(op gemeentelijk
voorwaarden
te versterken.
ernstige bepublieke
lijkt dit enkel
korte termijn
n is duidelijk:
pees vlak) op
lijken voor PPS.
voor PPS-projecte en worden versterkt
kunnen
gen
dreigin
wensen en middelen het kapitaal van de
tum juist
tie
momen
efficiën
het
dit
de
kan
Maar
door
Maar anderzijds
of investeerders.
het Belgische
is, op
private sector
betekenen in
te vinden in PPS
grondige
een kentering
heil dat men dacht motivaties en procesen -doen. Een
gedrag
PPS-denken
het gezamenlijke
basis van de huidige PPS-projecten, eerder
ming van
herziening van
verschilsen voor en tijdens
PPS, met afstem
, en
en doel van
partijen
. Bovendien tonen Denealle
tellend
van
teleurs
(uit onder andere
de doelstellingen
ent in alle
ldermanagem
rijk) dat
lende rappor ten
stakeho
Konink
gd
goed
een
Vereni
yclus zullen
in latere
marken en het
de hele levensc
fasen en over
betekenen
pte opbrengsten
uniteit
altijd
opport
PPS de verhoo
niet
ook
immers een grote
levensc yclus
fasen van de
PPS in België.
voor
behaalt.
de knop,
r weet paul
ls geen ande
ersiteit
de vrije univ
rector van
nadelen
de voor- en
brussel, wat
nwerkingsverprivate same
ctleider
proje
van publiek
) zijn. hij was
, zoals de
banden (pps
cten
proje
al ppstinfrastrucvan een aant
van de spor
ige
vernieuwing
het toekomst
bouw van
de
Campus
en
de
tuur
le hotel op
a
multifunctione en met doctors elvir
sam
pper
oefenplein.
en de sche
stev
en
voor publiek
haezendonck
rtisecentrum
de vub zet
van het expe
nwerking van
n.
uitee
private same
een standpunt
hij hierover
a
überhaupt
nemen, en om
van een
in rekening te
te geven in functie
nog informatie
schap.
eventueel partner
hun inbreng
partners voor
Respect van alle
over alle ob, transparantie
in het project
g en levensc ybij de aanvan
e
moet in
s pps
jectieven van
opwAArts
CiëLe Crisi
essentieel. Men
weging
clus-analyse zijn
kAn de finAn heropLeven?
ng komen,
spirAALbe
spiraalbewegi
en
weer doen
een opwaar tse
aanmoedigen
eelkaar
objecti
s
de
jker
waarbij partner
vraag is of
teel priorirbeeld, hoe duideli
De pertinente
hebbenden
des zijn momen behoef te
llende belang
versterken. Bijvoo voor het privé-consorBesparingsron
zijn.
den, maar de
ven van verschi
verenigbaar
de verwachtingen motivatie zal zijn en
tair bij veel overhe in het bijzonder voor
een PPS-project
van de
de
van
oek
ringen,
groter
onderz
hoe
inteisch
tium,
aan investe
Wel
ijke, waarde
maatschappel
Uit recent academ
neemt niet af.
toren Debekomen.
hoe meer, ook
VUB (promo
infrastr uctuur,
issie schat
kan
Comm
erstoel
beurt
prof.
se
s
haar
PPS-le
Europe
de overheid op
gendeel. De
ij en Laga, titulari
meer dan 2,7
niet alleen in
loitte, Grontm
echter dat
moet echter
voor de EU op
termijn
donck) blijkt
Die waarde
die behoef te
de tien jaar
op de korte
dr. Elvira Haezen
rijkste stavoor de komen
van de belang
monetaire termen
triljoen euro
termen van
de energiesecde doelstellingen
, maar wel in
triljoen voor
den zijn. Dit
gezien worden
(waaronder 1
elkaar verbon
1,5 triljoen
atie, maatvoor ICT en
keholders met
ische valoris
zijn van het
sociaaleconom
tijds- en
het verweven
tor, 270 miljard
r). Gesterkt
de overblijkt reeds uit
ontwikkeling,
rtinfrastructuu
schappelijke
voor transpo
gsobjectief van
schuldgraad
it.
ie van de
debudgetterin
ten en kwalite
ureaus die de
malisat
in
tiewins
ratingb
gstopti
ttend
efficiën
door
landen nauwle
heid en de opbren de samenwerking. Een
duidein
van verschillende in lijn met de Maasbeweging moet
door het
en
private partijen
De gunstige spiraal tijdens het proces niet
-karakter’
het oog houden
de vrijheidsgraden
ook
beperking van
is het ‘off balance
jke opbrengerenlijk zijn en mag
trichtnormen,
den moeten
van de mogeli
kelijk. De domin
tie voor
terugdringen
worden. Overhe
naar
ook de motiva
onderbroken
van PPS’en aantrek aan debudgettering is
saspecten
intrinsieke neiging en in
sten, verminderen
hiervoor hun
de motivatie gelinkt
in duurzaamheid worden
laten,
PPS-poteninvesteringen
trachten los te
en verstikt het
partijen
lijke
controle meer
erg risicovol
perspectieven
tie. Sommige
wetenschappe
rciële
PPS,
innova
bare
en
ver
comme
opleiuwig tegeno
de projecten
tieel. De beschik
meer kans
Meer en betere
hierdoor wantro ontstaat dat overheerop dat PPS
laten verwerken.
literatuur wijst
alle niveaus
evenwichtig
indruk
risico’s
zeker als de
als de risico’s
overheden op
lop
om kosten en
dingen voor
op succes heeft
betrokken stakeho
heden en kennis
erop uit zijn
de
private
den
op
vaardig
onder
en
hun
zijn
tie
kan ook
efficiën
verdeeld
jk af te wentel
en en verdien blijft
zoveel mogeli
en hierdoor aan
PPS verruim
partpartners
het vlak van
ders, als project
dergelijke gevalle van de
en als private
building’). Private
partners. In
tie
pen (‘institution
en timing winnen rciële perspectieven
groot de motiva
om meer en
de vraag hoe
comme
ook bereid zijn
de aannemer
ners moeten
interessante,
, bijvoorbeeld
PPS-projecmee te willen
private partner
reau, is om
realisatie van
vraagstukken
meer sociale
krijgen bij de
of architectenbu
vanuit een breed
jk
en
mogeli
of het studiet
project
zo
oplossen en
ten.
zo snel en efficiën
ren.
onder andere
technieken
tief te benade
innoverende
waardeperspec
erdeling is
saspecten
te werken, om
chtige risicov
duurzaamheid
Een evenwi
n wanneer
inspirAtie
van de VUB
te introduceren,
ker te bereike
Gebouw “M”
evenwel moeilij
van de
rijkste doel
is een ontwerp
g tot het belang
e modernistische
debudgetterin
entrum
expertisec
liek private
voor pub
vub
ing van de
samenwerk
l
in
“men moet
tse
een opwaar
eging
spiraalbew
rbij
waa
en,
kom
ambitieuze
elkaar
partners
gen en
aanmoedi
n”
versterke
srondes
“besparing
teel
zijn momen
bij
prioritair
den,
veel overhe
maar de
aan
behoef te
gen,
investerin
in het
voor
bijzonder
ctuur,
infrastru
t af “
neemt nie
een
siteit Brusse
de Vrije Univer
isecensitair Expert
In 2010 richtte
el in, het Univer
overeennieuwe leersto
daarvoor een
e,
De VUB sloot
ers: Deloitt
trum voor PPS.
rs-investeerd
drie partne
Laga. Zij
tenbureau
komst af met
eren en advoca
middelen om
Grontmij Vlaand
van de nodige
siteit
univer
van het Expervoorzien de
. Het doel
aan te stellen
rond PPS uit
doctorandi
aal onderzoek
kennis
is om doctor
tisecentrum
De ontwikkelde
k
begeleiden.
publie
te
en
pen
te voeren
atige tijdstip
lj op regelm
Ook gastco
wordt daarbi
en seminaries.
publicaties
op het progemaakt via
ssen staan
agen en congre
leges, studied
nElvira Haeze
gramma.
door prof. dr.
geleid
aan
ie
wordt
De leerstoel
ement en Strateg
dr.
ocent Manag
toren zijn prof.
donck, hoofdd
promo
twee andere
prof. dr. Danny
de VUB. De
Rechten, en
enschapdoctor in de
Kaat Leus,
Ingenieurswet
doctor in de
e zijn de
Van Hemelrijck,
Annick Faveer
en
per
De Schep
zijn dus betrok
pen. Steven
faculteiten
,
oekers. Drie
en Criminologie
twee onderz
Recht
isecentrum:
schappen
ken bij het Expert
Politieke Weten
, Sociale en
enschapEconomische
Ingenieurswet
leerss School en
& Solvay Busine
tijdens de initiële
om
ling
de bedoe
trum uit te
pen. Het is
het Expertisecen
van vijf jaar
derzoek in
riode
PPS-on
stoelpe
t voor
referentiepun
bouwen tot
het buitenland.
België en in
Belgisch
Braem.
architec t Renaat
18
Contact information
VUB Chair in Public-Private Partnership
[email protected]
Chair holder 2010-2014
Prof. dr. Elvira Haezendonck | [email protected]
Researchers
dr. Steven De Schepper | [email protected]
Geoffrey Aerts | [email protected]
As from January 1st, 2015
Chair holder 2015-2018
Prof. dr. Lieven De Moor | [email protected]
Co-promoter
Prof. dr. Elvira Haezendonck | [email protected]
Researcher
Wouter Thierie | [email protected]
www.vub.ac.be/leerstloel/ppp/
19