The Okuma Reconstruction Plan An Interim Report December, 2013 Okuma Town Outline Ⅰ Creating a Reconstruction Plan for Okuma • Basic stance on Okuma for creating this 「Reconstruction Plan for Okuma」. • Current stance on assisting townspeople under refugee life. 1. Ⅱ Stance on Assisting Disaster Victims from the Town Ⅲ Basis of MidLong Term Reconstructing/R eviving Okuma (p.2) Ⅲ-1 Mid/Long term phases of Reconstructing/Revivi ng Town Area Ⅲ-2 As the First Step in Town Revitalization-Renewal, Ogawara Reconstruction base provision 2. With consideration given to the prolonged situation, where people have to live in temporary evacuation housing, we are setting up plans to support stable housing Take measures to maintain a community for townspeople to eventually rebuild their hometown, and strengthen bonds to help revive the town despite prolonged living under refugee life. (p.3) • Stance on Mid/Long Term Reconstruction/Reviving Town Area based on forecasted radiation. 1. 2. 3. 4. Infrastructure Development Plan for Return Basic concepts of Town Area Reconstruction and Basis of Town Area Structure image of Town Area Reconstruction Main Policies regarding Town Area Reconstruction (p.4~11) • Outline of Ogawara which will be a Reconstruction Base base as the first step of Town Revitalization. 1. 2. 3. 4. 5. 6. Regarding Ogawara district as the reconstruction base (Necessity・Significance) Placement of reconstruction base Reconstruction Base’s direction policy and town planning and concept Space Maintenance in the Reconstruction Base (Image) Image of life style in Reconstruction Base Schedule of the Reconstruction Base (p.12~15) 1 Ⅰ Creating a Reconstruction Plan for Okuma It has been 2 years and 9 months since the Great East Japan earthquake and the Fukushima Daiichi Nuclear disaster. It is still impossible to foresee when citizens can return to their homes, but the surrounding environment is gradually changing. The radiation level in Okuma Town is continuing to decrease as time progresses. While there are areas projected to have a low radiation level, the levels in some areas are so high that it is not possible to return. This is despite extensive decontamination efforts. While there are areas where the radiation levels are projected to decrease in a relatively short amount of time, currently there is not a clear standard to classify radiation levels. Except for specific areas in Okuma, it is not yet possible for citizens to return to their hometown. With the passing of time the deterioration of buildings progresses, and it is estimated that it will be difficult to reuse the current public infrastructure. Even with the current decontamination methods, it is important to consider that it is not possible to completely eliminate contamination in the high-radiation areas. In local surveys and at social gatherings, the town has received several responses from its citizens such as, "We have decided to never return (to Okuma),” ”Even if we want to come back, we won’t be able to return for many years.” Decontamination activities are currently underway this year, and options regarding interim storage facilities are being considered. We have created a reconstruction plan for Okuma Town, and are looking towards creating a second plan for reconstruction for Okuma Town. There are five main issues regarding the Reconstruction Plan Basic Stance Regarding planning the 2nd Reconstruction Plan ■Outline for assisting disaster victims from the town 1.With consideration given to the prolonged situation, where people have to live in temporary evacuation housing, we are setting up plans to support stable housing ①Secure Permanent Housing – develop “Restoration Public Housing” to establish residential bases outside the town. ②Continue creating Municipally-subsidized housing as long as evacuation order is in effect. 2.Assist townspeople residing outside the town to live safely and comfortably. 3.Take measures to maintain a community for townspeople to eventually rebuild their hometown, and strengthen bonds to help revive the town despite prolonged living under refugee life. ■Basis of Okuma Mid-Long Term Reconstruction Plan 4.Monitor progress of decontamination and radiation levels, and proceed with mid-long term reconstruction of the town. 5.As a first step of reconstruction, Ogawara district will be designated as the center of restoration activities. Lively Scene near JR Ono Sta.(Joban Line)Example Housing on Ogawara Reconstruction Base(Example) Restoration Public Housing (Example) 2 Ⅱ Stance on Assisting Disaster Victims from the Town 1.Despite prolonged post-disaster living, assist townspeople by offering stable housing ①Secure Permanent Housing Environment - develop Restoration Public Housing by establishing residential bases outside the town Restoration Public Housing (Example) Stable Living for Disaster Victims ②Continue to offer Municipally-Subsidized housing as long as evacuation order continues 2.Assist townspeople residing outside the town to live safely and comfortably We believe the first and most important step for the townspeople living outside of Okuma, is to help provide them with a safe and comfortable lifestyle. In addition to the town, will be working with the national government, prefecture, and other related municipals so we can support each and every needs of townspeople, whether they wish to return to Okuma, or to live elsewhere. Policies under consideration by the town Residence Medical Welfare Employment Secure Permanent Housing Environment –develop restoration public housing which contributes to establish residential bases outside the town. Continue to offer municipally subsidized housing as long as evacuation order continues. Establish supporting systems offering townspeople solid medical and welfare services, even at the temporary housing locations. Support medical checks for health issues related to radiation at various locations Employment opportunities, preferably within Okuma Education Offer solid education at Kindergarten/Elementary/Junior High School Create system where Okuma students can attend school outside the town Education regarding Disaster Prevention including Nuclear Disaster Information Provide real-time reconstruction, decontamination, radiation level news within Okuma town, using various media sources. Provide information related to (damage) compensation Periodically provide information regarding residence, medical, welfare, employment, education etc. Transportation Consider ways to promote tourism and temporary stays (“Furusato bus” which would run in Okuma and nearby areas, and offer Restoration Tours of the town) Petition for continued Toll-Free expressway 3.Take measures to support sense of community within town, to reconstruct peoples’ hometown, all to revive our town– Okuma – despite prolonged post-disaster living. To reconstruct and revive our town, it is imperative to uphold the bond between townspeople. Measures must be taken to maintain a sense of community within the townspeople of Okuma, even in a state of prolonged post-disaster living. Measures to maintain/strengthen sense of community and bond of townspeople ①Provide places to interact between townspeople in temporary evacuation housing We will set up gathering spaces for the townspeople to gather in the evacuation housing. Specific Example • Okuma Reconstruction Base Visitation tour • Assisting to establish community for victims etc. ・Hold an Okuma “Furusato” festival ②Strive to provide information from Okuma Town Hall to townspeople Develop an environment where necessary information can be exchanged anywhere Specific Example • Provide real-time updates of reconstruction progress in Okuma. • Enrich town contents using various media resources ③Establish the Reconstruction Base in the town where townspeople can gather and be actively involved Develop a Reconstruction Base in town, where townspeople can visit anytime. Specific Example • Develop facilities where townspeople can gather and interact • Coordinate “Furusato” bus which connects the town and outside. • Introduction of Employment opportunities within Okuma 3 Ⅲ Ⅲ 中長期的な大熊町土の復興・再生に関する町としての考え方 Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-1 Mid-Long term phases of Reconstructing/Reviving Town Area 1.Infrastructure Development Plan for Return Infrastructure Development Plan for Return to Town 【Prerequisite】 First calculate air radiation level without decontamination. The air radiation level with decontamination (-57%) has been taken into account for each administrative district. Forecast air radiation levels based on the above prerequisite, and consider the efficiency of infrastructure development. We have projected infrastructure development to be completed (as shown on the map to the right.) First Phase (2018):Ogawara First and Second, Nakayashiki Second Phase (2023):Nogami First and Second, Shimonogami First, Second and Third, Kuma First and Second, Ono First and Second Third Phase (2028):Kuma Third, Machi, Yamatoku, Kumagawa, Noumagata, Oirino, Ottozawa Second and Third Forth Phase (2033):Ottozawa First 2.Basic concepts of Town Area Reconstruction and Basis of Town Area Structure Phase II Infrastructure Development planned to be completed in 2023 Phase I Infrastructure Development Planned to be completed in 2018 Phase Ⅳ Infrastructure Development planned to be completed in 2033 Phase III Infrastructure Development planned to be completed in 2028 Source)National Land Numerical Information Created by MLIT and Revised by NRI Image of Town Area Structure in April 2033 [Basic concepts of Town Area Reconstruction] ①Revive farming/fishing. Keeping in harmony with the nature of Okuma[Nature] 県道391号 Power Plant Premise ②Strive to create strong bonds between people. A place where everyone can live safely and comfortably [Peace/Safety] ③Research and development of decontamination/decommissioning nuclear power plants and promoting next generation technology/industry [High technology-Industry] [Basic Structure of Town Area] ① Okuma will have a “Residential Zone,” a “Business Zone,” and a “Nature Reserve Zone.” ② A Reconstruction Base which can support lives of approximately 3,000 people will be developed on existing farmland in Ogawara and Shimonogami. ③ We will petition the Ministry of Environment to decontaminate Ono station, which is the geographic center of Okuma. We will utilize already existing public and medical institutions. ④ With state support, we will prepare substitute land in the residential zone for people who lost housing in the disaster. 国道288号 Residential Zone 大野病院 Business Zone 県道166号 大野駅 Under consideration 大熊町役場 IC要望地点 Shimonogami 県道35号 Reconstruction 県道251号 Residential Zone Area Residential Zone 大川原地区 Oogawara Reconstruction Area Nature Reserve Zone 国道6号 常磐富岡IC 県道36号 県道165号 Source)National Land Numerical Information Created by MLIT and Revised by NRI 4 Ⅲ Ⅲ 中長期的な大熊町土の復興・再生に関する町としての考え方 Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-1 Mid-Long term phases of Reconstructing/Reviving Town Area 【Ref.】 Radiation Level Forecast and Infrastructure Development for Returning to the town (Under conditions that infrastructures are developed in areas under 20mSv/y and considering geographical continuity) Basis of Radiation Level Forecast and Decontamination We expect decontamination will be completed in Ogawara First and Second areas, and Chuyashiki in FY2013. Currently “difficult-toreturn zones” do not have concrete decontamination plans. It is forecasted that radiation levels of national forests and power plant sites will naturally decline. Air radiation levels will decrease by 57.1% thru decontamination efforts. Basis of Infrastructure Restoration Radiation Forecast including decontamination efforts, we plan to begin infrastructure development in the administrative districts when the local radiation level is lower than 20mSv/y. The time necessary for Infrastructure development is said to take 4 years. This is based on a plan from the national Reconstruction Agency. We expect infrastructure development shall be conducted simultaneously for water, sewer, electricity, gas, communication, roads etc. Sewer construction is expected to take the longest time of 3 and 1/2 years. We added the extra 6 months for unexpected reasons and delays. Special Decontamination Plan (for Okuma), in Dec, 2012 stated that decontamination of Ogawara and Nakayashiki will be completed by end of 2013 as planned. Nogami First and Second areas, Machi, Yamatoku, Kumagawa, Oirino, Noumagawa, Ottozawa Second areas are forecast to decontaminated in 2017. Ottozawa First and Third areas are forecasted to have more than 50mSv/y even in 2017. So decontamination will proceed once levels fall below 50mSv/y. Infrastructure Restoration Time and Setting up the Infrastructure Restored Areas National forests, and main roads will be decontaminated, however, we expect radiation levels will naturally decline. To draw out 「3. Image of Town Area Structure and Development Plans」, we have divided it into a 5-year plan. The administrative areas which have finished restoring their infrastructure were divided into Phase I – IV. 57.1% was the figure calculated regarding decontamination in Okuma. The percentage was taken from the average figure. Transition of Average Air Radiation Level in each administrative district and time necessary for Infrastructure Restoration ※1 This is an average figure and may be different from individual points. ※2 Air Radiation Level is not a definitive value and may be subject to change depending on the situation. ※3 Infrastructure Restoration Time may be subject to change. 行政地区 大川原地区(国有林) 野上地区(国有林) 第 中屋敷区 Ⅰ 大川原 一区 期 大川原 二区 野上 一区 熊 一区 野上 二区 第 熊 二区 Ⅱ 下野上 三区 期 下野上 一区 大野 二区 大野 一区 下野上 二区 熊 三区 町区 大和久区 第 熊川区 Ⅲ 小入野区 期 野馬形区 夫沢 二区 夫沢 三区 第Ⅳ期 夫沢 一区 発電所敷地 ●凡例 除染およびインフラ復旧を想定しないエリア(国有林・発電所敷地) 空間放射線量が「20mSv/y」より大きい期間 インフラ復旧工期(想定) インフラ復旧完了期(想定) 除染実施(想定) Unit: mSv/y 2012年 2013年 2014年 2015年 2016年 2017年 2018年 2019年 2020年 2021年 2022年 2023年 2024年 2025年 2026年 2027年 2028年 2029年 2030年 2031年 2032年 2033年 2053年 自然-2053 平成24年 平成25年 平成26年 平成27年 平成28年 平成29年 平成30年 平成31年 平成32年 平成33年 平成34年 平成35年 平成36年 平成37年 平成38年 平成39年 平成40年 平成41年 平成42年 平成43年 平成44年 平成45年 平成65年 平成65年 5.8 6.5 1.4 4.1 4.4 11.7 16.2 20.1 20.2 25.0 27.0 29.6 35.1 35.5 25.6 33.2 36.0 38.0 44.0 45.5 45.9 59.2 84.0 70.9 5.0 5.6 1.2 3.5 3.9 10.2 14.2 17.5 17.6 21.8 23.5 25.8 30.6 31.0 22.3 28.9 31.4 33.1 38.3 39.6 40.0 51.6 73.2 61.8 4.5 5.0 1.1 3.2 3.4 3.9 5.4 6.7 6.7 8.3 9.0 9.8 11.7 11.8 8.5 11.0 12.0 12.6 14.6 15.1 15.3 45.9 65.1 54.9 4.1 4.5 1.0 2.9 3.1 3.5 4.9 6.1 6.1 7.5 8.1 8.9 10.5 10.7 7.7 10.0 10.8 11.4 13.2 13.7 13.8 17.8 58.9 49.7 3.7 4.2 0.9 2.6 2.8 3.2 4.5 5.6 5.6 6.9 7.4 8.2 9.7 9.8 7.1 9.2 9.9 10.5 12.1 12.5 12.7 16.3 54.1 45.6 3.5 3.9 0.8 2.4 2.6 3.0 4.2 5.2 5.2 6.4 6.9 7.6 9.0 9.1 6.5 8.5 9.2 9.7 11.3 11.6 11.8 15.2 50.2 42.3 3.5 3.9 0.8 2.4 2.6 3.0 4.2 5.2 5.2 6.4 6.9 7.6 9.0 9.1 6.5 8.5 9.2 9.7 11.3 11.6 11.0 15.2 47.0 39.7 3.1 3.4 0.7 2.1 2.3 2.7 3.7 4.6 4.6 5.7 6.1 6.7 7.9 8.0 5.8 7.5 8.2 8.6 10.0 10.3 10.4 13.4 19.0 37.4 2.9 3.2 0.7 2.0 2.2 2.5 3.5 4.3 4.3 5.4 5.8 6.4 7.5 7.6 5.5 7.1 7.7 8.1 9.4 9.8 9.9 12.7 18.0 35.5 2.8 3.1 0.6 1.9 2.1 2.4 3.3 4.1 4.1 5.1 5.5 6.1 7.2 7.3 5.2 6.8 7.4 7.8 9.0 9.3 9.4 12.1 17.2 33.8 2.6 2.9 0.6 1.9 2.0 2.3 3.2 3.9 3.9 4.9 5.3 5.8 6.8 6.9 5.0 6.5 7.0 7.4 8.6 8.9 9.0 11.6 16.4 32.3 2.5 2.8 0.6 1.8 1.9 2.2 3.0 3.8 3.8 4.7 5.0 5.5 6.6 6.6 4.8 6.2 6.7 7.1 8.2 8.5 8.6 11.1 15.7 30.9 2.4 2.7 0.6 1.7 1.8 2.1 2.9 3.6 3.6 4.5 4.8 5.3 6.3 6.4 4.6 5.9 6.5 6.8 7.9 8.1 8.2 10.6 15.1 29.6 2.3 2.6 0.5 1.6 1.8 2.0 2.8 3.5 3.5 4.3 4.6 5.1 6.0 6.1 4.4 5.7 6.2 6.5 7.6 7.8 7.9 10.2 14.5 28.4 2.2 2.5 0.5 1.6 1.7 1.9 2.7 3.3 3.3 4.1 4.5 4.9 5.8 5.9 4.2 5.5 6.0 6.3 7.3 7.5 7.6 9.8 13.9 27.3 2.1 2.4 0.5 1.5 1.6 1.9 2.6 3.2 3.2 4.0 4.3 4.7 5.6 5.6 4.1 5.3 5.7 6.0 7.0 7.2 7.3 9.4 13.3 26.2 2.1 2.3 0.5 1.4 1.6 1.8 2.5 3.1 3.1 3.8 4.1 4.5 5.4 5.4 3.9 5.1 5.5 5.8 6.7 6.9 7.0 9.0 12.8 25.2 2.0 2.2 0.5 1.4 1.5 1.7 2.4 3.0 3.0 3.7 4.0 4.4 5.2 5.2 3.8 4.9 5.3 5.6 6.5 6.7 6.7 8.7 12.4 24.3 0.9 1.0 0.2 0.7 0.7 0.8 1.1 1.4 1.4 1.7 1.9 2.1 2.4 2.5 1.8 2.3 2.5 2.6 3.0 3.1 3.2 4.1 5.8 11.4 0.9 1.0 0.5 1.5 1.7 1.9 2.6 3.2 3.3 4.0 4.4 4.8 5.7 5.7 4.1 5.4 5.8 6.1 7.1 7.3 7.4 9.6 13.6 11.4 12.7 14.2 7.0 20.8 22.7 25.7 35.6 44.1 44.3 54.8 59.2 65.0 76.9 78.0 56.1 72.8 79.0 83.3 96.4 99.7 100.7 129.9 184.4 155.5 10.1 11.3 5.5 16.5 18.0 20.4 28.2 35.0 35.1 43.4 46.9 51.5 61.0 61.8 44.4 57.7 62.6 66.0 76.4 79.0 79.8 102.9 146.1 123.3 8.2 9.1 1.9 5.7 6.3 16.5 22.9 28.4 28.5 35.3 38.1 41.8 49.5 50.2 36.1 46.8 50.8 53.6 62.0 64.2 64.8 83.5 118.6 100.0 6.8 7.6 1.6 4.8 5.2 13.8 19.1 23.6 23.7 29.3 31.7 34.8 41.2 41.7 30.0 38.9 42.3 44.6 51.6 53.4 53.9 69.5 98.7 83.2 5 Ⅲ Ⅲ 中長期的な大熊町土の復興・再生に関する町としての考え方 Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-1 Mid-Long term phases of Reconstructing/Reviving Town Area 3.Image of Town Area and Development Phases(①:Town Area Projection for April 2018) Estimated Radiation Levels in Okuma for April 2018 (Decontamination has been taken into account) Town Area Structure as of April 2018 常磐自動車道 (開通区間) 除染完了想定地区 Under 20mSv/y 林野(国有林等) 県道391号 5mSv/y Under Over 20mSv/y Power Plant Premise Over 50mSv/y 国道288号 県道35号 Residential Zone 大川原地区 Under 20mSv/y Decontamination Completed:Nakayashiki , Ogawara First and Second, Nogami First and Second, Kuma First and Second, Shimonogami First, Second, and Third, Ono First and Second, Machi, Yamatoku, Kumagawa, Koirino, Nozokugata, and Ottozawa Second Decontamination Incomplete:Ottozawa First and Third area (Ottozawa Third is in the process of decontamination) ○Decontamination ・Decontamination completed for all administrative areas except for areas that have air radiation levels over 50mSv/y such as Ottozawa First and Third, and power plant sites. ・Decontamination for Highways and Town’s Main Road been completed. ○Transportation ・Jyoban Toyooka Interchange re-open(planned to be opened in 2014) ○Town Area Development ・Ogawara will start to function as the base of reconstruction. Also, start preparations for the Shimonogami base. ・Set up a hospital in Ogawara ○Town Area Management ・Decide how to utilize land(for housing, farming, and forests) for non-returning townspeople ・Decide how to manage farmland Shimonogami Reconstruction 県道251号 Area Nature Reserve Zone Oogawara Reconstruction Area 国道6号 常磐富岡IC 県道36号 県道165号 Source)National Land Numerical Information Created by MLIT and Revised by NRI Placement of Main Town Functions as of April 2018 Location Ogawara Reconstruction Base Outside of Okuma Under consideration 大熊町役場 Residential Zone Under 5mSv/y 県道166号 大野病院 Town Functions Public Facilities Town Branch Office Assembly Hall Hospital※ Convention Hall※ Power Facilities Fire Stations Decontamination/Infra Stockyard Supermarket※ Restaurant※ Commercial Gas Stand Restoration Public Residence Homing Research Decommission Research Transportation Roads Aizuwakamatsu Town Branch Office Iwaki Town Branch Office Fire Station Futaba School Bus Rank A A A A B A Town Functions National/Province Common Building Town Farm Post Office※ Shelter※ Garbage Collection Area※ Sewage Plant※ Rank B B A A A A A A A A Graveyard Convenience Store※ Financial Facilities※ Fitness Gym※ A A A C A A A A A Condominium Robot Research Facilities Bus Restoration Public Homing Restoration Public Homing Police Waste Treatment Facility A A B A A A A Town Functions Park Nursing Home Training Facility※ Emergency Radio※ Police Radiation Monitor Rank B A C A A A A: Town functions which shall be developed by the time townspeople return B: Town functions which shall be developed after couple months upon townspeople return. Pharmacy※ Hair Salon※ A A C: Town functions which shall be developed after appropriate time upon townspeople return. Accommodation Plant Factory Helicopter Port Elementary/Junior High A C C - -: Town functions which already exists or development is conditioned to return Educational Facilities A ※: Town functions planned to be located in the symbol tower 6 Ⅲ Ⅲ 中長期的な大熊町土の復興・再生に関する町としての考え方 Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-1 Mid-Long term phases of Reconstructing/Reviving Town Area 3.Image of Town Area Structure and Development Phases(②: Town Area Projection for April 2023) Estimated Radiation Level of Okuma in April 2023 (Decontamination has been taken into account) Town Area Structure as of April 2023 除染完了想定地区 常磐自動車道 (開通区間) 林野(国有林等) JR常磐線 (開通区間) 道路拡幅区間 県道391号 Power Plant Premise Under 20mSv/y 国道288号 Residential Zone Residential Zone 大野病院 県道166号 大野駅 Under consideration 大熊町役場 IC要望地点 Shimonogami 県道35号 Reconstruction 県道251号 Area Residential Zone 大川原地区 Nature Reserve Zone Oogawara Reconstruction Area Under 5mSv/y 国道6号 常磐富岡IC 県道36号 Decontamination Completed: 県道165号 All administrative Areas Source)National Land Numerical Information Created by MLIT and Revised by NRI Placement of Main Town Functions as of April 2023 Location Ogawara Reconstruction Base ○Decontamination ・Decontamination for all administrative areas is completed. ○Transportation ・Re-opening of JR Jyoban line(Plan) (is planned to fully re-open in 2020) ・Extend prefectural road 35/Route 288 to the desired location for the interchange ○Town Area Development ・Re-develop station area (Public facilities like Town hall and hospitals) ・Promote Shimonogami residential area Town Functions Public Facilities Town Branch Office Assembly Hall Hospital※ Convention Hall※ Power Facilities Fire Stations Decontamination/Infra Stockyard Supermarket※ Restaurant※ Commercial Gas Stand Restoration Public Residence Homing Research Decommission Research Transportation Roads Shimonogami Reconstruction Public Facilities Hospital Base Commercial Supermarket Restoration Public Residence Homing Transportation Bus Ono Station Public Facilities Town Branch Office Transportation Train Stations Outside of Okuma Aizuwakamatsu Town Branch Office Iwaki Town Branch Office Rank - Town Functions National/Province Common Building Town Farm Post Office※ Shelter※ Garbage Collection Area※ Sewage Plant※ Rank - - Graveyard Convenience Store※ Financial Facilities※ Fitness Gym※ - B A Condominium Robot Research Facilities Bus Nursing Home Convenience Store A A A B C A - Condominium A Hospital Bus Restoration Public Homing Restoration Public Homing C A - Town Functions Park Nursing Home Training Facility※ Emergency Radio※ Police Radiation Monitor Pharmacy※ Hair Salon※ Rank - - Accommodation Plant Factory Helicopter Port - Pharmacy B Bus Terminal Elementary/Junior High A - RANKING A: Town functions which shall be developed when townspeople return B: Town functions which shall be developed within a few months after townspeople return. C: Town functions which shall be developed in an appropriate time after townspeople return. -: Town functions which already exist or those which will be developed under certain circumstances. ※: Town functions planned for the Symbol Tower Shadowed area: New town functions 7 Ⅲ Ⅲ 中長期的な大熊町土の復興・再生に関する町としての考え方 Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-1 Mid-Long term phases of Reconstructing/Reviving Town Area 3.Image of Town Area Structure and Development Phases(③:Town Area Projection for April 2028) Town Area Structure as of April 2028 Estimated Radiation Level of Town as of April 2028 (Decontamination has been taken into account) 除染完了想定地区 常磐自動車道 (開通区間) 林野(国有林等) JR常磐線 (開通区間) Under 20mSv/y 道路拡幅区間 県道391号 Power Plant Premise 国道288号 Residential Zone Residential Zone 大野病院 Business Zone 県道166号 大野駅 Under consideration 大熊町役場 IC要望地点 Shimonogami 県道35号 Reconstruction 県道251号 Area Residential Zone 大川原地区 Under 5mSv/y Oogawara Reconstruction Area Under 20mSv/y Nature Reserve Zone 国道6号 常磐富岡IC 県道36号 県道165号 Decontamination Completed: All administrative Areas Source)National Land Numerical Information Created by MLIT and Revised by NRI Placement of Main Town Functions as of April 2028 Location Ogawara Reconstruction Base ○Decontamination ・Decontamination for all administrative areas is completed ○Town Area Development ・Re-opening of medical facilities to treat radiation exposure. ・Shimonogami First and Third areas will be developed as a new residential zone. ・Taking radiation levels into consideration, we will invite businesses to set up offices in the town, especially near the JR train station. Town Functions Public Facilities Town Branch Office Assembly Hall Hospital※ Convention Hall※ Power Facilities Fire Stations Decontamination/Infra Stockyard Supermarket※ Restaurant※ Commercial Gas Stand Restoration Public Residence Homing Research Decommission Research Transportation Roads Shimonogami Reconstruction Public Facilities Hospital Base Commercial Supermarket Restoration Public Residence Homing Transportation Bus Ono Station Public Facilities Town Branch Office Transportation Train Stations Commercial Retail Shop Research Call Center Outside of Okuma Aizuwakamatsu Town Branch Office Iwaki Town Branch Office Rank - Town Functions National/Province Common Building Town Farm Post Office※ Shelter※ Garbage Collection Area※ Sewage Plant※ Rank - - Graveyard Convenience Store※ Financial Facilities※ Fitness Gym※ - - Condominium Robot Research Facilities Bus Nursing Home Convenience Store - B B - Condominium - Hospital Bus Restaurant Datacenter Restoration Public Homing Restoration Public Homing B B - Town Functions Park Nursing Home Training Facility※ Emergency Radio※ Police Radiation Monitor Pharmacy※ Hair Salon※ Rank - - Accommodation Plant Factory Helicopter Port - Pharmacy - RANKING A: Town functions which shall be developed when townspeople return B: Town functions which shall be developed within a few months after townspeople return. C: Town functions which shall be developed in an appropriate time after townspeople return. -: Town functions which already exist or those which will be developed under certain circumstances. ※: Town functions planned for the Symbol Tower Bus Terminal - Elementary/Junior High - Shadowed area: New town functions 8 Ⅲ Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-1 Mid-Long term phases of Reconstructing/Reviving Town Area 3.Image of Town Area Structure and Development Phases(④:Town Area Projection for April 2033) Estimated Radiation Level of Town as of April 2033 (Decontamination has been taken into account) Town Area Structure as of April 2033 除染完了想定地区 常磐自動車道 (開通区間) 林野(国有林等) JR常磐線 (開通区間) 道路拡幅区間 県道391号 Power Plant Premise 国道288号 Residential Zone 大野病院 Business Zone Under consideration 県道166号 大野駅 大熊町役場 IC要望地点 Shimonogami 県道35号 Reconstruction 県道251号 Residential Zone Area Residential Zone 大川原地区 Nature Reserve Zone Oogawara Reconstruction Area Under 20mSv/y 国道6号 Under 5mSv/y 常磐富岡IC 県道36号 県道165号 Decontamination Completed: All administrative Areas Source)National Land Numerical Information Created by MLIT and Revised by NRI Placement of Main Town Functions as of April 2033 Location Ogawara Reconstruction Base ○Decontamination ・Decontamination for all administrative areas is completed ○Town Area Development ・Develop systems that can relay information worldwide regarding the nuclear accident and its effect on Okuma Town. Town Functions Public Facilities Town Branch Office Assembly Hall Hospital※ Convention Hall※ Power Facilities Fire Stations Decontamination/Infra Stockyard Supermarket※ Restaurant※ Commercial Gas Stand Restoration Public Residence Homing Research Decommission Research Transportation Roads Shimonogami Reconstruction Public Facilities Hospital Base Commercial Supermarket Restoration Public Residence Homing Transportation Bus Ono Station Public Facilities Town Branch Office Transportation Train Stations Commercial Retail Shop Research Call Center Outside of Okuma Aizuwakamatsu Town Branch Office Iwaki Town Branch Office Rank - Town Functions National/Province Common Building Town Farm Post Office※ Shelter※ Garbage Collection Area※ Sewage Plant※ Rank - - Graveyard Convenience Store※ Financial Facilities※ Fitness Gym※ - - Condominium Robot Research Facilities Bus Nursing Home Convenience Store - - Condominium - Hospital Bus Restaurant Datacenter Restoration Public Homing Restoration Public Homing - Town Functions Park Nursing Home Training Facility※ Emergency Radio※ Police Radiation Monitor Rank - RANKING A: Town functions which shall be developed when townspeople return B: Town functions which shall be developed within a few months after townspeople return. C: Town functions which shall be developed in an appropriate time after townspeople return. Pharmacy※ Hair Salon※ - Accommodation Plant Factory Helicopter Port - -: Town functions which already exist or those which will be developed under certain circumstances. Pharmacy - ※: Town functions planned for the Symbol Tower Shadowed area: New town functions Bus Terminal - Elementary/Junior High - 9 Ⅲ Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-1 Mid-Long term phases of Reconstructing/Reviving Town Area 3.Image of Town Area Structure and Development Phases(⑤Town Area Projection for April 2053) Estimated Radiation Level of Town as of April 2053 (Decontamination has been taken into account) Town Area Structure as of April 2053 除染完了想定地区 常磐自動車道 (開通区間) 林野(国有林等) JR常磐線 (開通区間) 道路拡幅区間 県道391号 New Industry Zone 国道288号 Residential Zone 大野病院 Business Zone 県道166号 大野駅 大熊町役場 IC要望地点 Shimonogami 県道35号 Reconstruction 県道251号 Residential Zone Area Residential Zone 大川原地区 Nature Reserve Zone Oogawara Reconstruction Area 国道6号 常磐富岡IC 県道36号 県道165号 Decontamination Completed: All administrative Areas Source)National Land Numerical Information Created by MLIT and Revised by NRI Placement of Main Town Functions as of April 2053 Ogawara Reconstruction Base Public Facilities ○Town Area Development ・With Declaration of Completion of Decommissioning, establish new industries for renewable energy within the Ottozawa area ・Build a Memorial Hall celebrating the revival of Okuma on the Fukushima Daiichi Nuclear Power Plant site Town Branch Office Assembly Hall Hospital※ Convention Hall※ Power Facilities Fire Stations Decontamination/Infra Stockyard Supermarket※ Restaurant※ Commercial Gas Stand Restoration Public Residence Homing Research Decommission Research Transportation Roads Shimonogami Reconstruction Public Facilities Hospital Base Commercial Supermarket Restoration Public Residence Homing Transportation Bus Ono Station Public Facilities Town Branch Office Transportation Train Stations Commercial Retail Shop Research Call Center Outside of Okuma Aizuwakamatsu Town Branch Office Iwaki Town Branch Office New Industry Zone Renewable Energy Plant Okuma Memorial Hall - National/Province Common Building Town Farm Post Office※ Shelter※ Garbage Collection Area※ Sewage Plant※ - Park Nursing Home Training Facility※ Emergency Radio※ Police Radiation Monitor - - Graveyard Convenience Store※ Financial Facilities※ Fitness Gym※ - Pharmacy※ Hair Salon※ - C: Town functions which shall be developed in an appropriate time after townspeople return. - Condominium Robot Research Facilities Bus Nursing Home Convenience Store - Accommodation Plant Factory Helicopter Port - -: Town functions which already exist or those which will be developed under certain circumstances. Pharmacy - C B Condominium - Hospital Bus Restaurant Datacenter Restoration Public Homing Restoration Public Homing Clean Technology Research Training Facility C B RANKING A: Town functions which shall be developed when townspeople return B: Town functions which shall be developed within a few months after townspeople return. ※: Town functions planned for the Symbol Tower Shadowed area: New town functions Bus Terminal - Elementary/Junior High - Automated Factory Tsunami Prevention C A 10 Ⅲ Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-1 Mid-Long term phases of Reconstructing/Reviving Town Area 【Legend】 4.Main steps of Reconstruction/Revitalization of the town Policy Classification ~2018 Measures for provisions in Ogawara Measures for provisions in Shimonogami ~2023 Measures to be implemented by 2053 Measures for provisions around Ono station ~2028 ~2033 20mSv/y未満 20mSv/y未満 5mSv/y未満 20mSv/y以上 20mSv/y未満 50mSv/y以上 Forecast Level of Radiation in the Town 5mSv/y未満 除染未実施 : 1. Steps regarding decontamination - Fukushima Daiichi Nuclear Power Plant reactors • Stockyard for Decontamination and Infrastructure materials • Decontamination of all administrative areas except for Ottozawa First, Third and power plant premises. Decontamination for Main Road/Highways are completed. Land (Changes in usage applications, rezoning of land, management of agricultural land, etc.) Deciding how to utilize land of citizens who decide to not return (housing, farm land, forested areas) ・Deciding on Farmland management methods ・Begin developing the Shimogami area Cross-jurisdictional infrastructure (Roads, rail roads, harbors, fishing ports) • NEXCO East Japan will enforce Re-opening of Joban-Toyooka Interchange 除染実施完了: 全行政区 除染実施完了: 全行政区 • Decontamination of all Administrative areas is completed • Decontamination of all Administrative areas is completed • Decontamination of all Administrative areas is completed • (JR East)Re-opening of Japan Railways Joban-line(Plan) ・Expand access from the desired location for an interchange from Fukushima prefectural route 35, Japan National Route 288 第Ⅳ期 第Ⅰ期 (平成30年頃にインフラ 整備完了見込み) (平成30年頃にインフラ 整備完了見込み) (平成35年頃にインフラ 整備完了見込み) Provisions for Nakashiki, Ogawara first and second areas, Nogami first and second areas and Shimonogami first , second , and third areas, Kuma first and second areas, Ono first and second areas are largely completed. 第Ⅰ期 (平成30年頃にインフラ 整備完了見込み) Transportation(Bus, Train) Education/Culture Developing a complex (Symbol Tower etc.)—making Ogawara district the base of restoration operations in Okuma Security/Disaster Prevention(Regarding disaster, tsunami, and other catastrophes at the reactor) Commercial Facilities(Groceries・daily wares・ clothing・hair・investment・entertainment) Initial related industries Secondary related industries Thirdly related industries (平成30年頃にインフラ 整備完了見込み) Provisions are completed in all districts Provisions are completed in all districts Function of the town hall Medical/Welfare 第Ⅰ期 第Ⅲ期 (平成40年頃にインフラ 整備完了見込み) • Other than Ottozawa area 1, provisions for all districts are largely completed. Afforestation/flood prevention (coast, rivers, dams, etc.) Residence (平成35年頃にインフラ 整備完了見込み) 第Ⅱ期 (平成40年頃にインフラ (平成35年頃にインフラ 整備完了見込み) 整備完了見込み) (平成45年頃にインフラ 整備完了見込み) 第Ⅱ期 第Ⅲ期 第Ⅱ期 • Provisions for the Nakayashiki area and Ogawara first and second areas, are largely completed 4. Creation of jobs for town citizens, development of the town (Industrial/ Research & Development) 5mSv/y未満 除染実施完了: 全行政区 第Ⅰ期 Lifestyle Infrastructure (Water and Sewer Service, Electricity, Gas, Communication) 3. Provisions for Nakashikiya district, Ogawara first and second district are largely completed. 20mSv/y未満 20mSv/y未満 夫沢一区・三区(夫沢三区は除染中) Decontamination/Decommission of Nuclear Power Plants 2.Reconstruction of Town Area 5mSv/y未満 5mSv/y未満 20mSv/y未満 除染実施完了: 中屋敷区、大川原一区・二区、野上一区・二区、 熊一区・二区・三区、下野上一区・二区・三区、大野一区・二区、 町区、大和久区、熊川区、小入野区、野馬形区、夫沢二区 Set up a robot technology-related research and development base, and plant factory in Ogawara district • Preparations for revival of the Town Hall, transportation are underway near Ono station area (Railroads, bus, etc.) Developing a complex where Shimonogami district is the subbase for revival operations Developing a complex where Shimonogami district is the subbase for revival operations Developing Shimonogami district first and third areas as residential areas Re-open the town’s core medical institutions (Primary Facilities for medical treatment for radiation exposure: Must negotiate with Fukushima prefecture) • Inviting private business to areas around Ono station, where such enterprises can resume operations • Continuing development in every district of Okuma ~Up to 2053 Set up new industries regarding renewable energy etc. in Ottozawa district Build a Fukushima Revival Memorial Hall on the site of the Fukushima Daiichi Nuclear Plant 11 Ⅲ Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-2 First Step of Reconstructing/Reviving Town Area – Ogawara Reconstruction Base 1.Regarding Ogawara district as the reconstruction base (Necessity・Significance) Action is necessary to achieve revival of Okuma town land and the citizens’lifestyle. We must strive to help realize their hopes and dreams. ・Because of the Great East Japan Earthquake and the nuclear disaster that incurred, the people of Okuma lost their hometown, and have had to live separated from their friends and family. Having their dreams for the future shattered, they have suffered greatly under these circumstances. A few years have now passed since the earthquake, and even today, the citizens live with a sense of insecurity about their future, which they cannot sweep away, ・However, there was a survey given out to the citizens, and there was a definite number of people who want to return to the tow. Thus, the decontamination process of the town in proceeding in incremental steps. ・Under these circumstances, it is necessary to have an action plan to revitalize the land in Okuma, and bring back the dreams and hopes for their future. ◆There needs to be a base for restoration and revival, not only for the town’s land, but the areas stricken by the nuclear disaster. ・The decontamination of the nuclear disaster site and the revitalization of infrastructure, Fukushima Daiichi Nuclear power plant decommissioning etc. is expected to take a great deal of time. ・In order to proceed, this should be a pressing issue not just for Okuma, but the neighboring cities and towns in Fukushima prefecture, and in addition, the country as a whole. Okuma, which is home to the Fukushima Daiichi Nuclear Power Plant, is on the front line in these steps. ・Okuma will be the base which leads the revitalization of infrastructure, and the decontamination process. It will become a region where research and development of safe and existing, and new technologies will play a role in the revitalization of the area. In the long term, it is expected activities in Okuma will contribute to smooth revitalization of areas nationwide. 2.Placement of reconstruction base ◆The base will be established in the Ogawara district (approx. 50ha) ・Ogawara district, located in the southernmost part of the town, has the lowest levels of air radiation, and with decontamination, it will be less than the 20mSv/y level, which is the standard to be considered an “evacuation order-free area.” ・Considerations and the undertaking of infrastructure equipment preparation, giving hope sooner, to citizens who wish to return to the town. ・In addition, the Joban expressway, which runs thru Ogawara, in the southernmost part of the district, Joban Toyooka IC would be established, which would make for good transportation access. ・Furthermore, because of the 50ha-scale flatland, it would make an ideal location for interaction, industry and research & development base. This base would serve the country, prefecture, private businesses, and all the citizens who wish to return to Okuma. This will be a region of revitalization and rebuilding. The first step in the Ogawara Reconstruction base is rebuilding of the land. Starting with Ogawara as the base of operations, revitalization of the land will occur in increments. We will proceed with the rebuilding of the Ogawara district, and strive to achieve lower air radiation levels in the surrounding areas. The area of Okuma will also be rebuilt in increments. Ogawara reconstruction base placement 西側 28ha 東側 25ha 大熊町 富岡町 Ogawara Reconstruction base 常磐自動車道 常磐富岡IC Ogawara Reconstruction base as the central location/town rebuilding 県道391号 周辺地域の放射線量を 考慮しながら段階的に復興 Power Plant Premise 国道288号 Residential Zone 大野病院 Business Zone 県道166号 大野駅 Under consideration 大熊町役場 IC要望地点 Shimonogami 県道35号 Reconstruction 県道251号 Residential Zone Area Residential Zone Ogawara Reconstruction base 大川原地区 Oogawara Reconstruction Area Nature Reserve Zone 国道6号 常磐富岡IC 県道36号 県道165号 3.Reconstruction base’s direction policy and town planning and concept Ogawara revitalization town planning’s the first step, hold in to account, 「Ogawara Reconstruction base’s town planning and concept” we offer the following “Nature,” “safety,” “high technology,” to realize these three concepts, not only Okuma, but the country, prefecture, citizens become united as one to promote (create together), is imperative. It is necessary to relay information about this process and about future plans as well. Ogawara Reconstruction base town planning ●Initiatives for revitalization of Okuma (From the plan for Okuma revitalization structure) 1)Lands, living in harmony with nature 2)Safe and comfortable living 3)High-technology industries 4)Relay the charm and of Okuma Planning and Concept for Ogawara Reconstruction base Image of Prime function to realize concepts ①Regeneration of farm land, smart city which retains a balance with nature[Nature] By conducting decontamination, we can bring back the rich nature of Okuma, kind to the environment, create a sustainable smart city with the potential for development. In addition, we will implement renewable energy and the revitalization of farm land and agriculture. ②Town planning where everyone can feel safe and comfortable[Peace] To protect peaceful living, establish a system to monitor radiation, solidly support the health of residents, and provide a medical system that supports the well-being of citizens. ③Research & Development of decontamination/decommissioning technologies and to create next-generation technology/industry[High-technology] ●Use of Ogawara Reconstruction base Proceed with town planning in the formerly evacuated areas, which will become the symbol and model for “land revitalization- rebuilding of living” for people evacuated as a result of the Nuclear disaster As the frontline of decontamination/decommissioning efforts, we will establish a research & development base regarding these procedures. In addition, and supporting the return of citizens to the town, we will help promote new industries which develop high-level robots etc. Assist to Accomplish Country/Prefecture/Town/Private Sector etc. acts as one, and powerfully work together for the revitalization/rebuilding It is imperative that not just the local citizens, but the country, and the prefecture, and private businesses work to together to maintain the Ogawara Reconstruction base. Inviting each type of industry Green spaces and parks with and abundance of nature Mega solar/biomass generation etc. renewable energy base Implement a smart grid, which would bring about efficient use of renewable energy. Covered plant factories with a clean room Device for Radiation monitoring Symbol Tower, which would serve as a ‘symbol of revitalization,’ and would incorporate functions which create a convenient lifestyle (medical facilities which support the health of residents, business facilities, convention facilities, and a tower from which citizens could get a bird’s eye view of their hometown.) A wireless station for disaster prevention to protect residents Revitalization public housing/sublets/rental residencies/guest houses, hotels, etc. Research & development base for decontamination/decommissioning-related technologies Research & development base for remote control/robot technologies, etc. Relaying Process of Realization Drills for Disaster/Nuclear Disaster and Relay the process of rebuilding/revitalization Instruct children and people outside the town about disaster/nuclear disaster drills, create a town of learning. Relay the revitalization process of Okuma to people in and outside the town, Ⅲ Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-2 As the First Step in Town Revitalization-Renewal, Ogawara Reconstruction base provision 4.Space Maintenance in the Reconstruction base (Example) Population of citizens returning to Okuma: Approx. 1,000 people (1,500 at most) Population of people newly moving to Okuma: Approx. 2,000 people (Researchers and facility operators, etc.) Space placement Policy ・Comparatively low radiation levels in the west. Set up a residential area there for local citizens. In the east, set up research and industrial areas. ・In the residential district, establish a housing area, Multiple-Dwelling area. Link both areas, and encourage opportunities for interaction. ・In the center of the town, place public families and businesses in close proximity to the residential district. ・In the Business and Public Facility area, set up the town hall, the Symbol Tower (housing medical facilities, businesses, and convention facilities,) police and fire station, etc. Land Usage Houses built by individuals Commercial/Public Facilities Area The area that would boast facilities which support the citizens’ daily life: Town Hall, Medical Facilities, Welfare, Commercial enterprises etc. We are planning to build the “Symbol Tower” which would provide a view of the entire town. Houses built by individuals Restoration Public Housing Multiple-Dwelling Housing Commercial/P ublic Facilities Facilities/Functions making up Ogawara Reconstruction base Specific Facilities/Functions (Example) Individual-built housing (For citizens) Restoration Public Housing (For citizens) ①Restoration Public Housing (For citizens) ②Simple Multiple-Dwelling Housing (For Researchers, workers in the research/industrial fields) ③Guest House (For temporary housing for citizens, and housing for researchers from Japan/Overseas) Commercia l Convenience Stores, Supermarkets, Barbers/Beauticians, Pharmacies, Gas stations, etc. Financial Institutions Sports Facilities/Bathing Facilities, etc. Public Facilities Town Hall Symbol Tower <Medical Facilities, Businesses, Convention Facilities> Police, Fire, etc. Research facilities for decontamination and decommissioning, the environment, robot technologies (Research Facilities for decontamination and decommissioning, low radiation levels and the relation to agriculture, food safety analysis, research facilities for radioactivity measurement, nuclear incident learning facilities, research facilities for renewable energy, and facilities for remote control and robot technologies, etc.) National and private business offices etc. (In the northern part of the industrial/research area) Ogawara Reconstruction base Space Placement Image Housing area ・This is the housing area for local residents ・It will consist of houses built by individual residents and Revitalization Public Housing Land Usage Housing Area Estimated 50ha area in the southern part of Okuma. Each function/facility assembled in a compact city area. The population scale in the Ogawara Reconstruction base is estimated to be approximately 3,000 people. Multiple-Dwelling area ③ (Guest House) An area where citizens can stay temporarily, with necessary facilities In addition, facilities where visitors and researchers can stay for international conferences, etc. Industrial/Research/Business Common Use land Roads, Parks, Greenery, allotment gardens, ponds, etc. Other (Provisions for Surrounding Areas) Cemeteries Nursing homes/care facilities Solar generation system (Provisional Use and Operation of Farm land) Etc. Ogawara Reconstruction base image Housing Revitalization Public Housing Condominiums Commercial/Pu blic Utility etc. Businesses Public Facilities Industry, research, business Common use land Multiple-Dwelling Area① (Restoration Public Housing The area where citizens live in multiple-dwelling complex. Planning for Restoration Public Housing Multiple-Dwelling Area② (Simplified Housing) An area where researchers and workers in the research and industry fields can reside or stay temporarily. Industrial/Research Area Research facilities for decontamination/decommissionin g and studies regarding the environment. Set up offices for national, prefectural, and private businesses. 13 Ⅲ Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-2 As the First Step in Town Revitalization-Renewal, Ogawara Reconstruction base provision 5.Image of life style in Reconstruction base ①City with Renewed Farmland, in harmony with nature [Nature] ②Town where Everyone feels Safe and Secure [Peace of Mind] Townspeople living in a compact town with many parks and tree-lined streets. Radiation Monitors will be installed to monitor and protect residents 24-hours a day. Town will effective use renewable energy such as Solar and Water power. Crisis Management for Decommissioning - such as Emergency Shelters and Evacuation Training Life−style related services – Symbol Tower will have a shopping center, medical facilities, convention center etc. to provide one-stop lifestyle related services. Promote Studies regarding how to renew Farming/Farmland after nuclear disasters. Install Clean Plant Factories to produce safe and stable agricultural products. Public Housing, Condominiums(Multiple-dwelling residences), Rental Housing will be provided based on preference of residents. Medical Facilities to support health of residents. Image of Condominiums Houses in tune with nature. Where people relax and chat in the park Promote Reconstruction as joint effort on a National/Prefecture/Town/Citizen-scale. (CoCreate) Implement National and Profecture Administrative Facilities to be the center of Reconstruction Work. Related Private Enterprises will have a base to coordinate Town Area Reconstruction. Image inside the Symbol Tower The tower would boast a shopping center and medical facilities. Many people can gather and enjoy shopping. ③Research and Development of decontamination/decommission, and promote next generation technology/industry [High Tech] Operation Base for Decontamination/Decommission will be implemented to lead reconstruction. Research Facilities regarding Decontamination/Decommission will be implemented to lead new technology and operations. Promote new technology such as Robotics which contributes to reconstruction. Okuma Townspeople will engage in Reconstruction and R&D with outside companies and researchers. Image of the Convention Hall Promote Decontamination/Decommission, Environmental Studies, Robots – where researchers will gather from all over the world to actively communicate and discuss Provide Lessons from Earthquake and Nuclear Disaster, and Process of Reconstruction and Renewal Where many international researchers on nuclear disasters and energy, would gather and actively discuss pertinent issues. Where our children and grandchildren visit, stay, and learn about the future of Okuma Where people can visit and learn about earthquakes and nuclear disasters. Where we provide information about our Reconstruction and Revival Process to supporters from around the globe Where visitors can temporarily stay in guest housing. 14 Ⅲ Basis of Mid-Long Term Reconstructing/Reviving Okuma Ⅲ-2 As the First Step in Town Revitalization-Renewal, Ogawara Reconstruction base provision 6.Schedule of the Reconstruction base End of FY2017 is target date for development FY 2017 is the target date for development: implement decontamination in FY 2013, investigate water and sewage systems in FY2014 Will Establish Ogawara as the Reconstruction Base Year Forecasted Radiation Level※ 2013 2014 2015 2016 2017 Ogawara First 16.5⇒5.7mSv/y 5.7⇒4.8mSv/y 4.8⇒4.1mSv/y 4.1⇒3.5mSv/y 3.5⇒3.2mSv/y Ogawara Second 18.0⇒6.3mSv/y 6.3⇒5.2mSv/y 5.2⇒4.4mSv/y 4.4⇒3.9mSv/y 3.9⇒3.4mSv/y Establish 「The Okuma Reconstruction Plan」 Administrative Response Design, Plan, conduct various negotiations related to developing Ogawara District Implement Contract for Ogawara District Development Land Acquisition for Ogawara District Initiate Investigation regarding development of “Difficult-to-Return Zone” Discussion between relevant organizations regarding debris processing Subject for Decontamination Decontamination Completed for Ogawara and Nakayahiki Districts Implement Model Decontamination of “Difficult-to-Return Zone” Planning Decontamination Planning for low level radiation within “Difficult-to-Return Zone” Initiate Water and Sewage Systems Restoration Work Initiate coordination with Waterworks Agency for improving water supply and sewage systems Investigate Sewage System Investigate Irrigation Channels/Drainage Channels Initiate Sewage Systems Restoration Work Initiate Irrigation Channels/Drainage Channels Restoration Initiate Power(Electricity) Studies Infrastructure Development Lifeline Facilities Development Propagation Survey for Emergency Radio Initiate Investigation for TV frequency Install TV Reception Base and Restore Network to each home Initiate Investigation for Optical Fiber Initiate Optical Fiber Restoration Initiate Investigation for NTT Phone Lines Restore NTT Phone Lines Investigate Restoration of Town Roads including Nakayashiki Initiate Restoration of Town Roads including Nakayashiki Initiate Installation of Emergency Radio Radiation Monitor Installation Survey Radiation Monitor Installation ※Forecast Level of radiation for Ogawara First and Second was based on Decontamination Efforts and speculated. Initiate Development for Ogawara District Order to Construct facilities like Symbol Tower, Guest House, and Residences Establish Management and Operation Systems for each facility 15
© Copyright 2024 ExpyDoc