KL PIKOM FAIR 2014(III) 19 – 21 DECEMBER 2014 KL SPECIAL DESIGN RULES SPECIAL DESIGN RULES 1. 2. 3. 4. 5. 6. 7. 8. All special designs MUST be submitted 3 weeks before the event to [email protected] and [email protected] All special designs MUST be approved by PIKOM before build-up. Admin Fee of RM10 per sqm and refundable Performance Bond (amount according to booth size) MUST be paid to our Official Contractor, before Contractors’ Move-In. The height limit is set at 5 metres for all Halls 2-5 and 6 metres for Mono-brand booths at Hall 1 which includes the structural rigging. For any construction on shell scheme booth, the height shall not exceed 4m. For structural rigging, the height of the structure should not exceed 1.2 metres. 60% visibility from all angles. All designs with backdrop/wall/partition should be built with a clearance of One (1) metre distance away from the edge of the booth. Other special design terms & conditions apply too. SPECIAL DESIGN RULES…cont’d ALL HANGING OBJECT require rigging must submit the below information for our assessment including:- 3D Visual of the stand design together with the hanging object; Size and weight of the hanging / rigging object; Attachment method and the risk of the object coming loose and failing; Superimposed rigging location plans indicate the rigging point; and Signed Rigging Load Indemnity Form need to be completed. We would like address some of issues raised by exhibitors/contractors with regards to special designs in booths that are: • against a wall; • next to a loading bay; or • where the aisle is not a main walkway for visitors and does not have a high traffic flow The decision is very much guided by the 60% VISIBILITY RULES which is basically set to avoid the views of adjacent booths from being blocked. Since the booths at the abovementioned places does not face this problem, an exception to the Visibility Rule will apply. SPECIAL DESIGN RULES…cont’d Basically we will look at allowing: The building of back walls/backdrops. The build up to start at the edge not 1 metre from it. Displays/exhibits to start from the edge and not 1 metre from it. 1. 2. 3rd party contractor are required to submit their stand drawings detailed with their lighting fixture to PIKOM for approval before 1 December 2014. Please include the below information for submission: Company Name: Contractor Company: Project person in charge: Location and Booth No: Booth Size: Overall Height : Material Used: Hanging Object: Roof or Ceiling or Pelmet : Raised Floor / Ramp: Type of Flooring: KLCC Stand Design Checklist SPECIAL DESIGN RULES…cont’d Build-up areas must be at least 1 metre from all edges SPECIAL DESIGN RULES…cont’d Build-up areas must have 60% visibility from all angles SPECIAL DESIGN RULES…cont’d • All special design booths must have the booth number to be indicated on the stand • Shell-scheme booth who used their own signage must also indicate the booth number on the signage Booth Number VENUE RULES & REGULATIONS 1. 2. 3. 4. 5. 6. 7. 8. No outside food and beverage are allowed. No smoking. Workers must wear proper attire with long pants, company t-shirt and covered shoes. Contractor badges must be wore during build up/tear down. Do no loiter at lobby and foyer. Below 18 years old is not permitted to work at KL Convention Centre. Foreign worker without working permit is not permitted to work in the Centre. All wastage and build-up materials shall be removed entirely from the hall and loading bay before the show starts and after tear down. 9. Every exhibitors/contractors are responsible for their own waste item. Any item found left over in the hall/loading bay after tear down will be charged for the removal of waste. 10. Any exhibit items left behind after the stipulated time will be disposed off without further notice. VENUE RULES & REGULATIONS…cont’d 11. 12. 13. 14. 15. 16. 17. 18. 19. Movement of trolley are strictly to be carried out within the plywood protection area ONLY! Use of scaffolding/ working platform above 3m height. No worker on scaffolding while moving No sanding, spray painting, sawing, metal cutting, major painting and major construction allowed during set up. Two paint washing area at the loading dock in between 1&2 and 4&5. Next to the cargo lift to Level 3. No blocking of fire fighting equipment and exit door during build up/tear down. Exhibitor to build a proper store in their booth space to avoid over stacking products at their booth space or outside the booth. Exhibitors are not allowed to hang/attach heavy item onto the shell scheme for safety reason. Any damages has found in the result of not comply with the above precaution actions, the said exhibitor/contractor will be borne to pay for the damage. DO’s & DON’ Ts ON BOOTH DON’T HANG ANY RACKS TO BOOTH’S FASCIA BOARD • For safety reasons, PIKOM would like to seek the co-operation from all exhibitors to NOT hang any of your product racks onto the booth’s fascia board. The structure is not built to support the weight of your products. Should any injuries happen to anyone due to collapse of the booth structure, collapse of your product racks or products, PIKOM will be not be responsible for the damages. DO’s & DON’ Ts ON BOOTH…cont’d The racks are hung onto the booth’s fascia name board by using “S” hooks. The fascia board will not be able to support the weight of the products hung onto the racks. This is dangerous as the fascia board may collapse and injure your staff, visitors and any passers-by. DO’s & DON’ Ts ON BOOTH…cont’d Example 1: Due to the weight of the racks, the fascia board collapsed. DO’s & DON’ Ts ON BOOTH…cont’d Example 2: Due to the weight of the racks, the fascia board collapsed. DO’s & DON’ Ts ON BOOTH…cont’d Exhibitor using own racks to hang products LIGHTHING CONNECTION 1. 2. 3. 4. 5. 6. 7. Exhibitors that are using their own lighting fixtures will be charged the lighting connection fee. Lighting connection are charged according to the number of tubes or bulbs lighted on the stand. Light boxes are charged according to the number of tubes in each light box using the lighting hook up. PIKOM reserves the right to stop the exhibitor from continue using the lighting fixtures if exhibitors whose lighting fixtures are found to be the cause of trips in power supply for safety reasons. Power point supplied is Not for lighting purpose. It is to be used for running equipment/exhibits such as laptop, handphone charger and etc. For lighting purpose, lighting hook up/connection will applied. One power point is assigned to one equipment only. No multi plug/extension is allowed. PANEL REMOVAL FORM Any request of panel removal on-site will be charged RM100.00/9sqm booth 3RD PARTY CONTRACTOR (NON-OFFICIAL CONTRACTOR) Forms submit to Instant Tradeshows & Exhibitions Sdn Bhd:1. Non-official contractor form (Performance Bond) 2. Furniture & electrical order form (if any) Deadline : 5 December 2014 After Deadline : 30% late surcharge On-site order : 50% surcharge Non-official contractor form FURNITURE & ELECTRICAL ORDER FORM 1. 2. A 30% cancellation fee will be imposed for cancellation of items ordered. Item cancelled on site will be charged 100% on the item price. 3RD PARTY CONTRACTOR (NON-OFFICIAL CONTRACTOR)…cont’d 1. 2. Drawing for approval (Deadline: 1 December 2014) Contractor without passes are not allowed to enter the hall during build up and tear down. 3rd party contractor form Before Deadline (5 December 2014) : Rm5.00/unit After 5 December 2014 : Rm10.00/unit On-site Cost : Rm10.00/unit INSTANT TRADESHOWS ON-SITE CONTACT Kaarthik (012-23355868) [email protected] Anas (016-2286124) [email protected] PC FAIR TEAM ON-SITE CONTACTS Wendy Liew (019-6252933/012-9790938) [email protected] Grace Lee (019-6612933/012-6558872) [email protected] Kelly Chin (019-6682933/016-3137196) [email protected] KL PIKOM FAIR 2014(III) 19 – 21 DECEMBER 2014 THANK YOU
© Copyright 2024 ExpyDoc