TENDER NOTICE NORTHERN RAILWAY HEAD QUARTER COS OFFICE BARODA HOUSE, NEW DELHI No : 23-S/AMC/Computer Cell/13-14/ Store Branch /HQ. Dated : 16/04/2014 An Open Annual Maintenance Tender is invited for preventive and corrective maintenance of computer system installed in store branch, Northern Railway, Baroda House, 2 nd Floor of computer system for a period of one year 19-05-2014 to 18-05-2015. The details given below:Description : Annual comprehensive maintenance Contract (with material) of computers with server base antivirus, peripherals and networking equipment, Date of Opening Quotation : 05/05/2014. Time of Opening : 11.00 AM Submission of Quotation : Quotation will be drop in tender box placed at Tender Opening Cell (Room No 238, Reception of COS office ) Tender Document : The Tender Document may be collected from DMS, Computer Cell, Room No 237-A, COS office, NR, BH, New Delhi-1. DY.CMM/EP/HQ TERMS AND CONDITIONS Annual Comprehensive (with material) maintenance contract of computers with antivirus, peripherals and networking equipment in COS office, Baroda House, New Delhi. 1. Maintenance/ Repair are to be done by the AMC Holder on site. If for any reason machine is to be removed for rectification from railway premises, The AMC holder will provide a similar machine in working condition for use by Railways till the machine under AMC is returned and made fully Operational. 2. A minimum uptime of 90% is to be maintained for all machines and working equipment's at a particular location. 3. The work shall be carried out as per railway specification. General conditions of contract in force and instructions given by the engineer-in-charge. 4. In order to keep hardware and software in Excellent Working Condition, the AMC holder will conduct preventive maintenance on periodical bases at an interval of 15 days, at every location. A proper record of such preventive maintenance will be kept jointly by SS/Computer and AMC holder. 5. AMC holder has to ensure that the data, Standard Software's such as oracle, operating system etc. Installed on server/PC remains intact and available to railway in all the circumstances. 6. In case AMC holder fails to fulfill as obligation under AMC, The Railway reserve the right to get the machine/ networking equipment repaired/ replaced ( as the case may be) from the market at the risk and cost of the AMC holder. 7. The payment of AMC holder will be made on quarterly basis after successful completion of AMC obligation during the preceding quarter. 8. The firm will provide name, address, phone number, fax number, E-mail id of the contact person/ office to whom complaint will be made by consignee. 9. The vendor will provide resident engineer with mobile on all working days from 9.30 AM to 5.30 PM including holidays (Saturday and Sunday) if needed. 10. In case the AMC holder fails to rectify the defect or replace the machine within a similar machine within 12 hours as stated in para2, penalty equal to 2% per day or part there of (counted after expiry of 12 hours period after reporting), of the maintenance charges for the machine / equipment shall be levied. SS/Computer will maintain a log book for the purpose of monitoring the execution of the AMC. 11. In case the AMC holder fails to conduct preventive maintenance a penalty equal to 2% per day for the no. of days delayed or part thereof of the maintenance charges for the machine/ equipment shall be levied. 12. In case the firm fails to maintain the uptime of 90% for all machines and working equipments at a particular location as per terms of contract, a penalty equal to 2% per day for the no. of days delayed or part thereof of the maintenance charges for machine equipment shall me levied. 13. The scope of maintenance service shall consist of preventive as well as corrective maintenance with material of equipments installed at different locations in COS office. 14. The anti-virus will be loaded in to one control server which will be periodically updated. Through internet or any other suitable means, from this central server, it will be pushed to all PCS s connected by LAN. DY.CMM/EP/HQ Proposal SNo Hardware and Peripherals for AMC Description 2014-15 Net Qty. for AMC 1 HP Prolaint ML150 Server Series(Server 2003) 2 2 Infinity HCL Server Model 2005 printer server 1 3 Dell Optiplex 780 Intel Core 2 Duo 10 9 Infiniti Pro BL 1240 Intel Core2 Duo HCL 14 10 Infiniti Pro BL 1280 Intel Core2 Duo HCL 19 11 Net Working Equipment Hub 1 13 HPLaser Jet 5200 N 2 14 HP Laser Jet-1160 15 15 HP Laser-Jet -1020 2 16 HP Laserjet P-1505 3 18 HP Laser Jet-p 2015 D N 1 19 Cannon LPBV-3000 2 20 HP Laser Jet P-1007 15 21 HP Laser Jet - p3005DN 2 22 Office Jet J 6500A,6488 All in one 8 23 HP Photo Smart C8100 1 24 HP L1 Pro P1606dn 8 25 HP office jet J 3608 ALL in one 5 Total Computers - 46 Total Printers - 64
© Copyright 2024 ExpyDoc