UK office: Burleigh House, 355 Strand, London WC2R 0HS • Tel: +44 (0) 20 7010 7690 • Fax: +44 (0) 20 7010 7699 • Web: www.aureus-mining.com • Listing: TSX: AUE AIM: AUE On the Road to Production Aureus Mining Inc is exploring and developing gold deposits in highly prospective and under-explored areas of Liberia and Cameroon. INVESTMENT OVERVIEW A West African gold developer constructing the first commercial gold mine in Liberia, the New Liberty Gold Project. EXTENSIVE EXPLORATION UPSIDE –multiple exploration targets in 1470km2 license portfolio in Liberia. STRATEGY – To develop New Liberty into a producing mine and progress high grade exploration targets, building towards a midtier producer. Aureus has financed the New Liberty Projects equity & debt funding requirement & is fully financed to production. New Liberty, Reserve of 924 Koz at 3.4 g/t. Updated Resource of 1.143 Moz at 3.6 g/t Measured and Indicated and 0.593 Moz at 3.2 g/t Inferred. Maiden resources at Ndablama and Weaju gold targets exceed 600 Koz Au. Total Resources at 2.37 Moz at 2.93 g/t. Production targeted for Q1 2015 with an expected rate of 119 Koz /annum over the first six years of the initial eight-year life. GROWTH – With a development stage project in New Liberty, Aureus has the engine to develop its strong pipeline of projects in West Africa. ASSETS – High grade, simple metallurgy with a number of discoveries in a largely underexplored gold province. UPSIDE – Potential to significantly increase resources at Ndablama. The Company is uniquely positioned and now has the capacity to achieve its principal objectives of building Liberia’s first commercial gold mine and expanding the current resources through aggressive drilling programmes. David Reading, Chief Executive Officer Share Price Since Inception EXPERIENCE – Board of Directors and management are experienced in building large and highly successful gold companies in West Africa. Analyst coverage Jonathan Guy, RBC Capital Markets (OUTPERFORM, TP: 60p) Brock Salier, GMP Europe (BUY, TP: 55p) Cailey Barker, Numis Securities Ltd (BUY, TP 50p) Nana Sangmuah, Clarus, (BUY, TP:46p) Yuen Low, Shore Capital (BUY, TP: 47p) Andrew Breichmanas, BMO (MARKETPERFORM, TP: 29p) Duncan Hughes, RFC Ambrian (BUY, TP: 47p) Martin Potts, finnCap (BUY, TP: 81p) Marc Elliott, Investec (BUY, TP: 45p) Eugene King, Goldman Sachs (Neutral/Neutral, 42p) Board of Directors David Reading (CEO) David Netherway (Chairman) Luis da Silva (NED) David Beatty (NED) Adrian Reynolds (NED) Jean-Guy Martin (NED) Issued capital Shareholder % holding Board of Directors 0.4 Institutions 78 Private/Retail Investors 21.6 Aureus Mining Inc. Buchanan Numis Securities Limited GMP Securities Europe LLP David Reading / Paul Thomson Tel: +44 (0) 20 7010 7690 Email: [email protected] [email protected] Bobby Morse / Gordon Poole Tel: +44 (0) 20 7466 5000 Email: [email protected] [email protected] (Nominated Adviser and Joint Broker) James Prior / James Black Tel: +44 (0) 20 7260 1000 Email: [email protected] [email protected] (Joint Broker) Richard Greenfield / Alexandra Carse Tel: +44 (0) 20 7647 2800 Email: [email protected] [email protected] THE NEW LIBERTY GOLD PROJECT Basic Facts The Orebody Aggressive Exploration Campaign New Liberty is Aureus’ flagship project in Liberia (west Africa). Reserve of 924 Koz at 3.4 g/t. Shows a significantly de-risked and robust project. Aureus owns 100% of New Liberty. Construction underway at New Liberty. Earthworks completed and civil works in progress. Reserve potential from upgrading inferred resources and underground potential. A focused and aggressive exploration programme is in progress in the New Liberty area, Ndablama and Weaju. These all fall within the company’s Bea Mountain 25-year renewable Mineral Development Agreement. Aureus is targeting production in Q1 2015 with an annual rate of 119 Koz from New Liberty for the first six years of an initial eight-year life. New Liberty has a resource base of 1.143 Moz at 3.63 g/t Measured and Indicated and 0.593 Moz at 3.2 g/t Inferred, at cut-off grade of 1.0 g/t. Ndablama: 40km from New Liberty; Inferred resource of 451 Koz at 2.1g/t. Open down dip & strike. Undergoing further resource drilling. New Liberty, which is part of the Bea Mountain licence, is permitted for 25 years and it is renewable. Potential for resource upside with deposit open at depth with underground potential. Weaju: 30km from New Liberty and 10km from Ndablama; Inferred resource of 178 Koz at 2.1 g/t. Industry low operating & all in sustaining cash cost modelled for eight-year mine life. Leopard Rock –Gondoja 13km gold corridor well defined by soil anomalies. Simple metallurgy – over 93% recovery through conventional gravity and CIL processing. Pressure shadow area and Yambesei Shear Zone revealing high potential for resources. Undergoing further exploration. Regional, target-generative programmes underway across prospective licence portfolio with in excess of 50 gold occurrences and gold geochemical anomalies outlined to date. Excellent infrastructure. The project is easily accessible by road – 100km from Liberia’s capital, Monrovia. New Liberty Gold Project Resource Model Q1 2015 $100m 3.4 g/t Expected date for first gold pour Project Debt Funding secured December 2013 Gold grading for New Liberty Reserve www.aureus-mining.com
© Copyright 2025 ExpyDoc