diagrams for Cross Country HST services here

HST Diagrams
Cross Country
Autumn 2014
MONDAYS TO FRIDAYS
XC801
1V44 0600 LDS-PLY, 1S51 1225 PLY-GLC, 5S51 22+39 GLC-EC.
XC802
FX
FO
Spare at EC.
5V54 04+41 EC-DEE, 1V54 0632 DEE-PLY, 1E73 1725 PLY-LDS.
XC803
MO 5V46 05+14 NL-YRK, 1V46 0640 YRK-PLY, 1S53 1325 PLY-EDB.
TuWTh
Spare at EC.
FO 1V64 1306 EDB – PLY.
XC804
1V50 0606 EDB-PLY, 1E63 1525 PLY-LDS.
SATURDAYS
XC801
1V44 0600 LDS-PLY, 1S51 1225 PLY-GLC, 5S51 22+39 GLC-EC.
XC802
5V54 04+41 EC-DEE, 1V54 0632 DEE-PLY, 1E73 1725 PLY-LDS.
XC803
Spare at EC
XC804
Spare at LA
SUNDAYS
XC801
1V48 0810 LDS-PLY, 1S55 1425 PLY-EDB.
XC802
1V56 0908 EDB-PLY, 1E75 1825 PLY-LDS.
XC803
1V50 0900 LDS-PLY, 1E63 1524 PLY-LDS.
XC804
1S53 1325 PLY - EDB.
Page 1 of 2
GENERAL NOTES
Note that these are the normal booked diagrams, which can be subject to alteration at any time for
operational reasons. In particular, weekend workings are often amended for engineering work.
Headcodes beginning with 5 are empty coaching stock (ECS) workings which are generally only
shown where they are greater than 6 miles.
If you are interested in HSTs and want to help to preserve the sight and sound of the classic
Valenta powered Inter-City 125 in the future then please join us, new members are most welcome,
go to www.125group.org.uk and subscribe on-line. Members receive our quarterly magazine
packed full of background information and current developments on the operational HST fleet and
our preservation activities.
If these diagrams have been useful to you then please make a donation to our exciting
‘Project Miller’ appeal which aims to bring the National Railway Museum’s prototype power
car 41001 back to life. Check out www.projectmiller.org.uk to find out about our progress.
KEY
DEE - Dundee
EC - Edinburgh Craigentinny Depot
EDB - Edinburgh
GLC - Glasgow Central
LA – Laira Depot
LDS - Leeds
NL - Leeds Neville Hill Depot
PLY - Plymouth
YRK - York
Any views or opinions expressed in this document are not necessarily those of the 125 Group, or any of the train
operating companies mentioned (to which the 125 Group and therefore this publication have no links whatsoever).
The 125 Group accepts no liability for inaccuracies, incomplete, ambiguous or incorrect information in any of its output,
however so caused.
Page 2 of 2