STATUS OF CBM BLOCKS AWARDED TO PSUs AND PRIVATE/JV COMPANIES (As on 30.04.2014) Sl. No. Block State Area (in sq. km.) CBM Round/ Nominatio n Contra ctor Remarks FIPB GEECL (100) Commercial production started since 2007. Current production: 350,000 m3/day Block under development since 2013. under production. Block under development since 2013. Under Production. Currently producing around 140,000 m3/day. Development phase is upto December 2014. Pipeline upto Phulpur is being laid. Development phase is upto December 2014. Pipeline upto Phulpur is being laid. Block under development since 2013. I. Under Development/Production Phase (8 Blocks) 1 Raniganj (South) West Bengal 210 2 Raniganj(North) West Bengal 350 Nomination ONGC Basis (74)CIL (26) 3 Jharia Jharkhand 85 Nomination ONGC Basis (74)CIL (26) 4 RG(E)-CBM2001/I West Bengal 500 CBM Round-I Essar Oil Ltd (100) 5 SP(E)-CBM2001/I Madhya Pradesh 495 CBM Round-I RIL (100) 6 SP(W)-CBM2001/I Madhya Pradesh 500 CBM Round-I RIL (100) 7 BK-CBM-2001/I Jharkhand 95 CBM Round-I 8 NK-CBM-2001/I Jharkhand 340 CBM Round-I ONGC (80)IOC (20) ONGC (80)- Block under development IOC (20) since 2013. MWP of Ph-I completed. Entered Ph-II but no work carried out due to nonreceipt of EC fro CECB. MWP of Ph-I completed. Ph-I expired on 17.02.2014. PI Transfer and entering into Phase-Iiare in progress. Phase-1 completed. Phase duration to be regularised. MWP could not be completed due to law and order problem (Force Majeure). II. Blocks under Exploration Phase (6 Blocks) 9 SH(N)-CBM2003/II Chhattisgarh 825 CBM Round-II RIL (100) 10 SP(N)-CBM2005/III Madhya Pradesh 609 CBM Round-III REL (45)RNRL (45)Geopet rol (10) 11 SR(N)-CBM2005/III Madhya Pradesh 330 CBM Round-III 12 RM-CBM2005/III Jharkhand 469 CBM Round-III 13 AS-CBM-2008/IV Assam 113 CBM Round-IV 14 MG-CBM2008/IV 667 CBM Round-IV DIL (90)Coal Gas (10) Arrow (35)GAIL (35)EIG (15)TATA Power (15) Dart Energy (60)OIL (40) GEECL (100) Tamil Nadu MWP is yet to be started Ph-I is upto September 2014. Out of CBM area of 667 sq. km., 295 sq. km. is overlapped with PEL/PML area of ONGC. Contractor and ONGC to resolve the impasse. Contractor reiterated its stand to have unrestricted access. III. Contracts not Effective due to non-grant of PEL by State Government (5 Blocks) 15 GV(N)-CBM2005/III Andhra Pradesh 386 CBM Round-III Coal Gas (10)DIL (40)Adinath (50) 16 RM(E)-CBM2008/IV Jharkhand 1128 CBM Round-IV 17 TL-CBM-2008/IV Odisha 557 CBM Round-IV Essar Oil Ltd(100 ) EOL (100) 18 IB-CBM-2008/IV Odisha 209 CBM Round-IV EOL (100) 19 SP(NE)-CBM2008/IV MP & Chhattisgarh 339 CBM Round-IV EOL (100) PEL not granted by AP government due to objection raised by the Singarani Coalries Company Limited (SCCL) due to overlap of CBM blcok with mining lease held by SCCL. PEL order issued. PEL deed is yet to be signed PEL not granted by Odisha Government. PEL not granted by Odisha Government. PEL order for MP granted. but PEL for Chhattisgarh is not granted III. Blocks under Relinquishment/ Relinquished( 14 Blocks) 20 BS(1)-CBM2003/II Rajasthan 1045 CBM Round-II RIL (100) 21 BS(2)-CBM2003/II Rajasthan 1020 CBM Round-II RIL (100) Under relinquishment. MWP of Ph-I completed. Under relinquishment. MWP of Ph-I completed. 22 SK-CBM-2003/II Jharkhand 70 CBM Round-II ONGC (100) 23 NK(W)-CBM2003/II Jharkhand 267 CBM Round-II ONGC (100) 24 ST-CBM-2003/II Madhya Pradesh 714 CBM Round-II ONGC (100) 25 WD-CBM-2003/II Maharashtra 503 CBM Round-II ONGC (100) 26 BS(3)-CBM2003/II Rajasthan 790 CBM Round-II 27 BB-CBM-2005/III West Bengal 248 CBM Round-III ONGC (74)CIL (26) BritishP etroleu m (100) 28 MR-CBM2005/III Chhattisgarh 634 CBM Round-III 29 TR-CBM-2005/III Chhattisgarh 458 CBM Round-III Arrow (35)GAIL (35)EIG (15)TATA Power (15) Arrow (35)GAIL (35)EIG (15)TATA Under relinquishment due to poor prospectivity. MWP of Ph-I completed. Under relinquishment due to poor prospectivity. MWP of Phase-I remained unfinished with 2 test wells. Relinquihsed due to poor propspectivity Relinquihsed due to poor propspectivity Relinquihsed due to poor propspectivity Relinquished due to poor prospect. PhaseI MWP of 5 test wells and 2 core holes not competed. . Contractor opted to relinquish without completeing MWP due to poor prospectivity. Relinquihsed due to poor propspectivity. MWP of Phase-I completed. Power (15) 30 BS(4)-CBM2005/III Rajasthan 1168 CBM Round-III Geopet rol 31 BS(5)-CBM2005/III Rajasthan 739 CBM Round-III Geopet rol 32 KG(E )-CBM2005/III Andhra Pradesh 750 CBM Round-III Geopet rol 33 ST-CBM-2008/IV Madhya Pradesh 714 CBM Round-IV Dart Energy (80)TATA Power (20) MWP has not been initiated due to non grant of Consent to operate/ Consent to establish. MWP has not been initiated due to non grant of Consent to operate/ Consent to establish. Under reliquinshment as Petroleum Exploartion License ( PEL) not granted by AP Government. Under reliquinshment after completing Phase-I.
© Copyright 2024 ExpyDoc